American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13, 2011 1.

Slides:



Advertisements
Similar presentations
Advanced Energy Conference New York, NY October 31, 2012
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Using Synchrophasors for Preventing Cascading Outages
ISO New England Smart Grid Investment Grant Update David Bertagnolli – NASPI Working Group Meeting October 12-13,
Marianna Vaiman, V&R Energy
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
New Energy Horizons Opportunities and Challenges Update on IEEE PC Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement.
Washington DC October 2012 A Vision for an Advanced Supervision and Control System for the Electric Grid Ramón A. León XM S.A. E.S.P Colombia.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
and Trend for Smart Grid
Synchrophasors: Improving Reliability & Situational Awareness
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
1 MISO Business Plan: Enhanced Reliability, Customer Service & Market Implementation James P. Torgerson, President & CEO Midwest ISO December 17, 2003.
Introduction to Phasor Measurements Units (PMUs)
North American Synchrophasor Project Initiative NASPI Work Group Meeting Oct , 2011 Joseph H. Schaefer Florida Power & Light.
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
Illinois Security Lab Critical Infrastructure Protection for Power Carl A. Gunter University of Illinois.
Update to AABE on DOE Smart Grid Investment Grants and Smart Grid Regional Demonstrations Christopher Irwin Smart Grid Standards and Interoperability Coordinator.
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
“Discovery Across Texas” New Technology Solutions for Wind Integration in ERCOT Synchrophasor Project Status Update Bill Muston Oncor Electric Delivery.
Networking All talk - Selective listen Network up to 15 active nodes + 17 passive nodes Nexus/Discovery panels, network repeaters, R3 19” racks, Alarm.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Texas Phasor Project ERCOT Reliability and Operations Subcommittee (ROS) February 12, 2009 Milt Holloway, Center for the Commercialization of Electric.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Smart Grid APPA Annual Meeting Kiah Harris Burns & McDonnell June 15, 2009.
1 Some Issues about Big Data in Power Grid Gary Quan.
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Synchrophasor: Implementation,Testing & Operational Experience
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Connections of a CT and a PT to supply, load and relay.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Phasor Measurement Units
Lyndonville Electric Department Feasibility Analysis Review December 2,
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Intro to Network Design
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
Information Technology Needs and Trends in the Electric Power Business Mladen Kezunovic Texas A&M University PS ERC Industrial Advisory Board Meeting December.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
NERC Lessons Learned Summary LLs Published in September 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA - WISP Project NASPI Work Group Meeting October 12-13, 2011 Scott Lissit – Project Manager,
PJM Interconnection Smart Grid Investment Grant Update
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
PS ERC EC Meeting Systems Stem New Research Initiatives.
MISO – Synchrophasor GPA Users Forum Sept 7th, 2011.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
NERC Published Lessons Learned Summary
Utility Needs and Smart Grid for Major Storm Events
SCE Utility Update JSIS Meeting March, 2015.
2017 WECC JSIS Report March 21, 2017.
Hongming Zhang EMS Applications Manager, PEAK RC
Presentation transcript:

American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,

Project Participant Information American Transmission Company – Project Manager Carl “Chip” Harper – Project Liaison to DOE Jessica Basilio – Operations Lead Jim Kleitsch

Legacy Project Map 3 42 PMUs in service (2 DFRs, 40 relays) Most data sourced from capacitor bank protection relays Sending data from 5 PMUs at 345 Kv stations to Midwest ISO.

Combined DOE and Legacy Project Map 4 DOE Project Planned Installations Stations with interconnected generation exceeding 200 MW gross capability Stations with interconnected wind generation greater than 50 MWs 345 Kv stations

Project Timeline – PMU Installs We will begin PMU installations in December The sanitized schedule is shown below: 5

Project Timeline – Other We have two legacy PDCs in service and operational. We will transition to newer PDCs when technical issues have been addressed. (Planning for Q2 2012) Existing communications allow us to implement now. Our SCADA enhancement project will extend our fiber optic network to improve reliability and performance of the communications network. Some applications already developed in house using our OSI Soft – PI tools. Looking at other applications when more data is available 4Q

PMU Installation Statistics We are the sole transmission owner involved in this project and will be installing a total of 45 PMUs Elements monitored by PMUs Today (legacy plus DOE) – 5 stations operated at 345 Kv (0 from DOE project) – 37 stations operated between 69 Kv and 230 Kv (0 from DOE project) – 36 capacitor banks / 1 transformer tertiary / Kv lines / 0 generators monitored 8% of our system substations (those operated at or above 69 Kv) are now monitored by PMUs (42 substations with PMUs). We expect to see that increase to close to 25% at project completion. 7

PMU Installation Statistics (cont’d) Minimum PMU sampling rate will be 30 samples/second PMU installation rate – 42 units have been installed as of 9/30/2011 over a 3 year period. 2 of these were DFR upgrades. The remainder were new installations where the PMU data was made available from a dual function relay/PMU. – We expect to have 4 DOE installs completed between now and year end. This will be a mix of stand alone PMUs and DFR upgrades – We expect to have all 45 DOE projects completed by year end Approximately half of these projects involve new installations of stand alone PMUs. The remaining units involve upgrades of existing Digital Fault Recorders – Any installations in 2013 will be done as part of our legacy project. We do not have any specific plans at this time. 8

PDCs and Communications When our project is complete we will have the following in service equipment: PDCs – One redundant PDC pair at our offices in southeastern Wisconsin – One cold standby PDC at our offices in south central Wisconsin The above reflects MISO PDC expectations and is beyond what we anticipated when we originally scoped our project – Archive/database status Currently Storing ~4 GBytes per day to our PI Historian database All data is available since we began scanning (no compression) We will store all data until such time that we determine what data we do not need Communications system – Communication link to MISO – highly available and redundant – Retired our link to TVA – MISO now providing that data – No direct links to other TOs anticipated at this time. We envision MISO as our “PMU data hub” if we need data from others in our region 9

Major operational applications using phasor data We will be making all our PMU data available to MISO. We do not envision any direct connects to other TOs to share data at this time. Wide-area situational awareness – ALSTOM eterraVision in development for overall wide area view. Looking at ways to leverage those capabilities with our non-standard PMU data configuration to enable use of PMU data. – Also looking at RTDMS and PGDA applications from Electric Power Group. Need to figure out how our project fits with the MISO project – PI ProcessBook prototype displays already created. Need to get Operations buy in and further direction. State estimation – ALSTOM EMS already has capability to use phase angle data as an input. – We are already feeding angle data to our EMS at 1 sample/second rate from our legacy sites but it is not used as an input to SE. – Plan to test SE once we have the majority of our 345 Kv sites in service. Currently that puts us out to 4Q 2012 / 1Q

Challenges and lessons learned Execution challenges – We are still struggling with buy in from Operations to make this a real time decision making tool. Some forward movement but we haven’t been able to get what we’ve developed to be considered “screen worthy” by Operations – We have completed all site visits and have specified installation work to be done but have yet to install one PMU under the project – Longer lead times from some of our vendors than expected causing installation delays – Review cycle for drawing updates taking longer than planned – Problems getting the work scheduled on this non-standard project. We don’t normally have projects that span many stations scattered across our footprint like this project Other challenges – PMU performance has been good but we have yet to determine acceptable downtime – Managing our data archives as we grow our PMU network will require that we get smarter about what data we need to keep and for how long 11

Other things we should know about your project? Already using the PMU data we have to help with post event analysis - 5/10/2011 event example 12

Other things we should know about your project? (cont’d) 13 System protection requesting data to assist in post event fault analysis especially in areas where older electromechanical relays are used Operations requesting data periodically to address operational questions (Did you see any voltage spikes on the transmission system at this time, etc… Using the data to validate generator models in isolated areas where events have occurred.

Questions? 14