GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.

Slides:



Advertisements
Similar presentations
Mechanical/Thermal Measurements T. Bowcock, J. Carroll.
Advertisements

Low material budget microfabricated cooling devices for particle detectors P. PETAGNA and A. MAPELLI On behalf of: CERN PH/DT The NA62 Collaboration EPFL.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
122 Nov GTK Microchannel Cooling Hydraulic simulation with Rectangular Manifold Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 22 th Nov 2011 E. Da Riva,
TopDrive: RP3 Thermal Management of Battery Module Unit of Electronics Integration and Reliability Department of Electronics.
1 THERMAL CONDUCTIVITY OF SILICATE BONDED SAMPLES Status of measurements with the thermal conductivity facility in Firenze October, 8 th 2007 Gianpietro.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
1 21/10/2011 GTK Microchannel Cooling coupled simulation Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 21 st October 2011 E. Da Riva, V. Rao.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
DCP Meeting – September 12 th 2010 WP1/4: Leak Search & Repair- Paolo Petagna 1/9 PH-DT - WP1: REMOTE LEAK REPAIR- Update Report on status of leak analysis/quantification.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
1 THERMAL CONDUCTIVITY OF SILICATE BONDED SAMPLES Status of measurements with the thermal conductivity facility in Firenze June, 7 th 2007.
NA62-GTK special meeting on cooling options
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz PXD support (IFIC - Valencia) 26/7/2011.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Cooling System(s) for the Roman Pots of TOTEM experiment 1 V. Vacek AGENDA: 1.Scope of the Research activities (TFP and DAQ group at the Dept. of Applied.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Microfluidic Cooling for Detector and Electronic OUTLINE: Motivations for micro-channel cooling in HEP Micro-technologies involved First possible HEP cases:the.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
GTK Controls and Safety Thermal results with the ceramic heater Kaitlin Howell, Georg Nüßle, Paolo Petagna,
H.J.Simonis, IEKP Uni-Karlsruhe, SuperKEKB meeting, KEK 18.mar 2009 Thermal studies for the DEPFET Pixel Detector IFIC – University of Valencia (Spain)
Demineralised water cooling system
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Ti/SS transitions A.Basti INFN-PISA*
Alessandro Mapelli - µcool weekly - CERN
Micro-channel Cooling
cooling for BGV modules
cooling and supports of the forward endcap EMC
Performance of an Automated Water Based Cooling System for CBM MuCh
SILICON PIXELS DETECTOR
ALICE PD group meeting Andrea Francescon.
Microfluidic devices for thermal management
3D-Printed Connectors Timothée Frei
Micromegas module for ILC-TPC
Experimental program for module array
The Stave Thermo-Conductivity QC Procedure Idea
Tests on a dummy facet of PIX upgrade using CO2 cooling
Presentation transcript:

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli (CERN PH/DT) M. Morel (CERN PH/ESE) J. Noel (CERN PH/DT) G. Nuessle (UCL) P. Petagna (CERN PH/DT) Status of thermal tests Status of integration/infrastructure Micro-fabrication plans

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 2/9 PH-DT Tests on “GTK SFB” Design Continue

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 3/9 PH-DT New Kapton Heater: “GTKSym v1.1” FLOW IN FLOW OUT HEATING SURFACE Better adapted size (40 x 60 mm) 3 separated heating regions 15 PT100 temperature sensors Test under mild vacuum (1÷2 ·10 -2 mbar) No detectable leak Contact by thermal grease (Electronics) (Sensor) Waiting for new 3D thermo-mechanical simulator (“GTKSym v2.0) -> see talk by M. Morel

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 4/9 PH-DT Some Thermal Results (T uniformity) FLOW IN (T ~ -2 °C) FLOW OUT (T ~ +1.5 °C) HEATING SURFACE (middle row of temperature sensors) P = 15 W (½ nominal) Q = kg/s (½ nominal)  T IN-OUT ~ 3.5 °C

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 5/9 PH-DT Thermal Results (Preliminary transients)

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 6/9 PH-DT Thermal Test Programme Explore temperature uniformity in design conditions Explore temperature on sensor vs. inlet coolant temperature Explore sensitivity to flow rate errors Explore off-design conditions (e.g. partial chip failure) Explore time gradient of temperature in case of cooling failure Define electronics on/off transient properties (cooling on)

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 7/9 PH-DT Integration in GTK Module Work space prepared inside the Divisional Silicon Facility (bldg 186) Dedicated Technical Student starts end of August Possibly one US Summer Student available before then Staystik: paste -> received; film -> sent from firm Also available: diamond-loaded SU-8 (spin-coatable in thickness < 1  m Diamond-loaded epoxy ME7159 from “Al Technology”

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 8/9 PH-DT Infrastructure Meeting agreed with EN/CV-DC on May 26 th to start discussing detailed specs for the cooling plant (preferred option: cold liquid C 6 F 14, scaled down from CMS PIX unit, single unit with 3 branches, controls under Unicos+PVSS) 1 rack needed in the cavern (exp. site visited on May 6 th, preliminary requirements provided to Gilles Maire on May 17 th ). Option A: rack in TCC8+ minimal distance from GTK – longer access time after dump Option B: rack in ECN3+ shorter access time after dump – very long transfer lines Open question: optimal position for controlling PLC?

GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 9/9 PH-DT Micro-fabrication plans Final round of optimization of micro-fluidics design Define minimal thickness (long process, requires many hours in clean room). Target: 150  m Increase reliability of bonding process, in particular for Si-Si Enhance analysis via non-destructive methods to improve QA/QC for serial production