1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
G2P Target installation and Beyond. Schedule Pivot before.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Bubble Chamber Planning Meeting 04 September
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
Thomas Jefferson National Accelerator Facility Hall C Commissioning: The Past (1996) First Exp: “by consensus” What Hampton Univ. wanted What ANL wanted.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
SOLID: View from Hall A Robert Michaels, Acting Hall A Leader Issues to Discuss Schedule of Experiments Procedures to Decide Schedules Budget and Manpower.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
Jefferson Lab Overview Bob McKeown April 20, 2015.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PAC Meeting, December 12, Prebys 1 The Problem.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
ELENA installation progress F. Butin / ELENA collaboration.
G2p/GEp Beamline Status Tim Michalski Project Lead.
Muon Ionisation Cooling Experiment Overview
AD consolidation activities in LS2
News and brief overview of Beamline plans for the next few months
HRS at small angles for e+/ e- pair for APEX
DESIGN STATUS PREX II Alan Gavalya 15DEC14.
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Experimental Areas – LS2 planning
Polarized 3He target installation
Presentation transcript:

1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015

1 Scheduling 2 February 2015

1 Hall A Projected Experiment Schedule, updated 2/ available on Hall A wiki CY 2015 CY 2017 CY Experiments listed in italics represent potential schedule options, in no order -Red indicates PAC41 High Impact Experiments including SBS G e p -Purple indicates new experiments approved by PAC42 -Blue indicates potential back-up experiment CY 2018 SBS start?

1 Hall A Projected Experiment Schedule, updated 2/ available on Hall A wiki CY 2015 CY 2017 CY Experiments listed in italics represent potential schedule options, in no order -Red indicates PAC41 High Impact Experiments including SBS G e p -Purple indicates new experiments approved by PAC42 -Blue indicates potential back-up experiment CY 2018 SBS start? Bad run

1 Hall A Projected Experiment Schedule, updated 2/ available on Hall A wiki CY 2015 CY 2017 CY Experiments listed in italics represent potential schedule options, in no order -Red indicates PAC41 High Impact Experiments including SBS G e p -Purple indicates new experiments approved by PAC42 -Blue indicates potential back-up experiment CY 2018 SBS start? Short run More likely first opportunity

APEX E&D Items Remaining Corrector magnet(s) Vacuum extension box Support for extension box Support for magnet Target motion cooling Shielding Power supply Magnet Walter supply magnet Sieve holders and fiducialization Shielded beam pipe?

APEX Installation Current New septum magnet being fitted with water manifolds, buss bars and power guards must still be tested (only to 200 Amps). Design/fabrication work ongoing (next slide) Installation Post run surveys Remove target (Rad Con hold) Remove DVCS arm Collaboration – crystal removal and de-cabling Manpower intensive Disasemble and remove DVCS beam line, collimators from pivot Install target, target chamber, integrate with services Install APEX beamline and magnet Installation of APEX magnet challenging due to the limited accessibility, plus it must be partially disassembled to install the vacuum transitions Electronics equipment position and shielding questions open Total installation time is approximately 14 weeks.

HRS-right Q1 HRS-Q1 right in repair Old “Short Orbit Spectrometer” quad being used as replacement Shorter, resistive, different New leads on order May be complete by Fall, Spring more likely May or may not work Can APEX use the SOS quad? 8

1 Physics Division Readiness Process – Suggest aiming for shielding review Summer Will need documentation for any new/substantially redesigned equipment -Precursors to Request for Scheduling (look for s from Rolf roughly every 6 months starting ~May) -Readiness Review for installation -Change in physics liaison Formal Path

1 Small window of opportunity for running Spring 2015 Preparations underway A lot to do! Installation non-trivial Preparations are of benefit to APEX even if the run is later in the schedule Summary