CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.

Slides:



Advertisements
Similar presentations
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Advertisements

1 WEB1P Lecture 2 Introduction, web project management & risk management.
CERN TE-MPE Jonathan Búrdalo Gil MARCH 2013 OVERVIEW OF ITER USER INTERFACE BOX EDMS
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
ANSALDO: BACKGROUND experience in dependable Signalling Automation Systems experience in dependable Management Automation Systems experience in installation,
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
FMEA-technique of Web Services Analysis and Dependability Ensuring Anatoliy Gorbenko Vyacheslav Kharchenko Olga Tarasyuk National Aerospace University.
CERN - IT Department CH-1211 Genève 23 Switzerland t The High Performance Archiver for the LHC Experiments Manuel Gonzalez Berges CERN, Geneva.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
CS 111 – Dec. 3 Lab recap Problem solving approach for systems analysts –8 phases –Just understand the flow/process/sequence of the steps, not specifically.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
B. Todd et al. 25 th August 2009 Observations Since v1.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
Interlocks for Magnet Protection System Iván Romera Ramírez, Markus Zerlauth - CERN.
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
FCC Special Technologies WP Task 11 Radiation Hardness Assurance TASK 1 Field conditions and radiation levels at FCC TASK 2 FCC Qualification Protocols.
Thursday August 20, 2009 John Anderson Page 1 Accelerator Interlock System Issues Flow Down of Requirements from the Safety Order to Engineered Safety.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
TE-MPE-TM 27/06/2012, TE-MPE-MS section SPS RENOVATION Final design and status 1 R.Mompo, P.Dahlen, Y.Bastian, I.Romera, M.Zerlauth.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Dave Barney, CERN. Tracking Tools: Introduction  Main Purpose: to keep track of all incidents & interventions at point 5  Interlocks – reasons & follow-up.
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
PLC based Interlock Workshop CIS Team February 2016 ITER Central Interlock System Fast Interlock Controller.
Combining safety and conventional interfaces for interlock PLCs
Dibyendu Roy Advait Ghate Yogesh Gaikwad Manojkumar Annigeri
0v1.
Software Overview Sonja Vrcic
Systems Analysis and Design in a Changing World, 4th Edition
LHC experiments Requirements and Concepts ALICE
Acknowledgements: H.Milcent, R.Denz, R.Schmidt, M.Zerlauth
SOFTWARE DESIGN AND ARCHITECTURE
LINAC4 50 MeV phase BIS STATUS
Current Status of ITER I&C System as Integration Begins
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Chapter 2: Software Process Models
Detailed global view on protection and detection of the circuits
Peer Review Agenda (Suggested).
Experience with an IT Asset Management System
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Chapter 2: Software Process Models
System Architecture of MPSVac and MPSID
PSS verification and validation
Command and Data Handling
Project Migration / Management
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera Sanz, M.Zerlauth and Critical Systems Lab EDMS

CERN Ivan Romera MPE-Technical meeting Overview of current agreement 2 Collaboration agreement with duration from 2010 to end 2012 ● Task-1: Consultancy for the setup of a Machine Protection Working Group Proposal and recommendations sent to ITER ● Task-2: Definition of the overall architecture of the Machine Protection and Central Interlock System The overall architecture of these systems is defined ● Task-3: Specifications for the fault scenarios simulations Done for the magnet interlock system, new methods were developed to assess architectures of interlock systems + external consultant from system safety domain ● Task-4 Definition of tools for diagnostics of the machine protection systems Partially done, combined with the development of a prototype

CERN Ivan Romera MPE-Technical meeting Recap - Powering Layout 3

CERN Ivan Romera MPE-Technical meeting Recent activities 1/5 4 ● Prototype for magnet powering interlocks has been completed and delivered to Cadarache (fully documented) ● Following individual commissioning, system is awaiting first connection and tests with quench detectors before being shipped to India & China Redundant S7400 PLCs I/Os in 2oo3 Local supervision Standard User Interface Based on redundant safety PLCs + 2oo3 I/O module configuration (down to and including client connections) Fault tolerant to any single component failure Redundancy of programming through safety matrix + standard logic Local SCADA system + touch screen Standard user interface (DLUI) for client connections and diagnostics

CERN Ivan Romera MPE-Technical meeting Recent activities 1/5 5 ● Prototype for magnet powering interlocks has been completed and delivered to Cadarache (fully documented) ● Following individual commissioning, system is awaiting first connection and tests with quench detectors before being shipped to India & China Based on redundant safety PLCs + 2oo3 I/O module configuration (down to and including client connections) Fault tolerant to any single component failure Redundancy of programming through safety matrix + standard logic Local SCADA system + touch screen Standard user interface (DLUI) for client connections and diagnostics

CERN Ivan Romera MPE-Technical meeting Recent activities 2/5 6 ● Different HW architectures tested in order to find the fastest and more dependable solution N Discharge loop based on Standard + Failsafe components Implementation based on Safety Matrix + AWL

CERN Ivan Romera MPE-Technical meeting Recent activities 3/5 7 ● Different HW architectures tested in order to find the fastest and more dependable solution Discharge loop using only standard components but diversity of components Implementations based on AWL for Boolean Processors and CPU

CERN Ivan Romera MPE-Technical meeting Recent activities 4/5 8 ● Working on 2 nd version of User Interface Box (only non COTS component), including Profinet connectivity for diagnostic purposes ● PCB already produced and currently being tested Rad tolerant FPGA User connectivity Mechanics + redundant power supplied Profbus in V1.0 Profinet in V2.0

CERN Ivan Romera MPE-Technical meeting Recent activities 5/5 9 ● Completed dependability analysis of magnet powering interlock system with external company from system safety domain (CSL – Critical Systems Lab), including Dependability analysis and review of functional specification, definition of Investment Protection functions Definition of state machines for system functionality (concurrency between circuits) Study of interfaces and dependencies with main client systems (QD, PC, FDU,…) Catalogue of (unresolved) design issues Failure Mode and Effect Analysis (FMEA) for backbone architecture

CERN Ivan Romera MPE-Technical meeting Budget and resources 10 ● CERN resources invested to date: 2200 hours of CERN staff (system design, meetings,…) 400 hours of student/Fellow for analysis of interlock architectures 1200 hours of Fellow (50% since Aug 2011) for development of interface box 960 hours of PJAS hours of external consultant for PLC SW and SCADA ● Additional external resources invested to date: 300 hours of system safety consultancy (through direct contract of CSL with ITER) ● Budget and expenses evolved as planned

CERN Ivan Romera MPE-Technical meeting Conclusions 11 ● The collaboration agreement ended in 2012, all deliverables completed ● Collaboration has been fruitful learning experience for CERN in many fields (COTS vs voting in interlock systems, radiation tolerant FPGAs, Profinet, studies of architecture and system dependability,..) ● Due to delay of China test and ITER wish for a V2.0 of user interface, agreed on extension of collaboration by 1 year ● Possible continuation as of 2014 on following topics (tbd): Analysing + feed back the performance from the China tests into final design Provision of full-scale system including full monitoring part Definition of the entire powering interlock system (includes clarification of open questions) Other topics related to Machine Protection (towards interlocking of Plasma)