Office of Innovations and Solution ACB-1 Project Management Principles and Practice for Managers Presented by: Pat A. Eigbe, PMP® Office of Innovations.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Degree and Graduation Seminar Scope Management
Project Change Management
Dr. L. K. Gaafar The American University in Cairo
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Chapter 10: Monitoring and Controlling Change
Project Management Session 7
Degree and Graduation Seminar Cost Management
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
The 9 Things in the PMBOK 19-Nov-08. The PMBOK “Project Management Body of Knowledge” –sum of knowledge within the profession of project management –used.
The Project Management Body of Knowledge (PMBOK)
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management Framework. PMBOK ® Guide, Third Edition.
Earned Value Management
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
Software Project Management By Assistant Prof. Samana Zehra
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Project Management Lecture 5+6 MS Saba Sahar.
Project Management Education
Project Management for Purchasing Managers Paul Lewis MA, MBA, PMP ® Manager, Project Management Office February 11, 2010 / NAPM-Utah.
18/21/20151 Instructor: Suprakash Datta (datta[at]cse.yorku.ca) ext Lectures: Tues (CB 122), 7–10 PM Office hours: Wed 3-5 pm (CSEB 3043), or by.
Project Management Methodology Project monitoring and control.
Degree and Graduation Seminar Project Management Processes
Project Management: Madness or Mayhem
Project Management Application in Health IT Farrokh Alemi, Ph.D. Geff Garnhart, PMP.
PS Introduction: What Is a Project ?
Introduction to Project Management Chapter 12 Managing Project Control and Closure Information Systems Project Management: A Process and Team Approach,
Project Management for RIM Professionals Last Updated: 3/13/2011 Sarina Arcari, PMP VP Implementation & Product Planning Amerigroup Corporation 3/15/11.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Project Management. The Project Management Institute
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
6/1/001 Primavera Project Planner (P3) Demo Presented to ACT-540 Branch June 1, 2000.
Agenda  Purpose  Definition  Processes  Performance Reports  Quality Control  Risk Monitoring & Control  Change Requests 5.3.
Software Project Management (SPM)
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
Project Life Cycle.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Office of Innovations & Solutions ACB Project/Program Management Implementation Presented to ACB Management Team ACB Management Team By A. Pat Eigbe, PMP®
Strengthening Partnerships: Shaping the Future Portland, OR June 6 th – 10 th, 2004 Planning for Success Implementing the California EDRS.
Project Cost Management
Project Management Methodology
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
MITM743 Advanced Project Management Dr. Abdul Rahim Ahmad Assoc. Professor College of IT, UNITEN Project Management Body of Knowledge PMBOK 4 (Section2)
Project Management Basics
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
The Project Plan Plan Your Work, then Work Your Plan
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
The Project Management Process Groups
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Chapter 11 Project Management.
Project evaluation and control
Project Management and Information Security
TechStambha PMP Certification Training
Earned Value - What is it
Project Scope Management
Earned Value Management
Project Management Chapter 11.
Project Integration Management
Project Integration Management
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Office of Innovations and Solution ACB-1 Project Management Principles and Practice for Managers Presented by: Pat A. Eigbe, PMP® Office of Innovations and Solutions, ATO-P February 17, 2004

Pat A. Eigbe, PMP ® 2 Briefing Outline  Project Management (PM) as a Tool  Project Management Terminology  PM Relationship to other Disciplines  Project Management Processes  Project Management Tools & Techniques  Summary/Conclusion  Questions

February 17, 2004 Pat A. Eigbe, PMP ® 3 Project Management as a Tool  Minimize Fire Drills  Efficient Use of Resources  Develop Better Metrics  On-time and On-budget Product Delivery  Apply Lessons Learned  Better Communications Between Stakeholders  Make Proactive Decisions

February 17, 2004 Pat A. Eigbe, PMP ® 4 Project Management (PM) Terms  Project - A temporary endeavor undertaken to create a unique product or service. a ATOP or VSCS - Project has a specific purpose with a start and an end date.  Project Management - the Application of Knowledge, Skills, Tools, and Techniques to Project Activities to Meet Project Requirements.

February 17, 2004 Pat A. Eigbe, PMP ® 5 Project Management Terms II  Program - A group of related projects managed in a coordinated way. Programs usually include an element of ongoing activity. a CPDLC, SMA, URET CCLD, pFAST,as FFP1 a PM Tools Development as part of Program Management  A Project/Program Manager (PM) - The Individual Responsible for Managing a Project/Program.

February 17, 2004 Pat A. Eigbe, PMP ® 6 Project Management Terms III  Work Breakdown Structure (WBS) - “A deliverable-oriented grouping of project elements that organizes and defines the total scope of the project. Each descending level represents an increasingly detailed definition of a project work.

February 17, 2004 Pat A. Eigbe, PMP ® 7 Project Management Terms IV  FAA standard wbs1-0.ppt FAA standard wbs1-0.ppt  WBS Dictionary 3.1 WBS Dictionary 3.1  Requirement to use FAA Standard WBS – Mandatory

February 17, 2004 Pat A. Eigbe, PMP ® 8 Project Management Terms V  Deliverable – Tangible, verifiable work product or service.  Work Package – A deliverable at the lowest level of the work breakdown structure. A work package may be divided into activities.  Activity - Work elements with expected duration, cost, & resources that may be subdivided into tasks.

February 17, 2004 Pat A. Eigbe, PMP ® 9 Project Management Terms – VI  Stakeholder – Individuals or Organizations that will be Impacted by the Outcome of a Project.  OBS: An Organizational Chart Relating Work Packages to Organization Units.  Responsibility Matrix: Relates Organization Structure to WBS & Ensures that each Element of the Project’s Scope is Assigned to a Responsible Individual(s).

February 17, 2004 Pat A. Eigbe, PMP ® 10 Project Management: Relationship to Others Disciplines Project Management Knowledge and Practice General Management Knowledge and Practice Application Area Knowledge and Practice The PMBOK ™ Figure is conceptual and overlaps are NOT proportional

February 17, 2004 Pat A. Eigbe, PMP ® 11 Systems Engineering/PM Relationship – I  PM Needs SE for a Integrated PM System Design a Requirements for HW and SW Tools  SE Needs PM for a Planning and tracking a Managing Resources  PM System Designer Must Understand both  SE Not Necessary for PM Practitioners

February 17, 2004 Pat A. Eigbe, PMP ® 12 Systems Engineering/PM Relationship - II  Risk Management a PM - Schedule, Cost & Technical/Quality a SE – Compatibility of Components of a System or Sub-System  Quality Management a PM - Process for Producing the Product a SE - Ensure Product Meets the Quality Specifications

February 17, 2004 Pat A. Eigbe, PMP ® 13 Systems Engineering/PM Relationship - III  Configuration Management a PM - Ensure Integrity of Schedule and System for Schedule Management a SE - Ensure Integrity of the System as Designed  Change Management a PM - Changes to Project Scope a SE - Changes to System Requirement  Measurement a PM – Program cost & schedule performance a SE – Technical Performance

February 17, 2004 Pat A. Eigbe, PMP ® 14 PMI Certification  What is PMP ®  What PMP ® is not  PMP ® Value to Holder & Employer  PMP ® Certification Process link – visit 

February 17, 2004 Pat A. Eigbe, PMP ® 15 PM Process Groups Initiating Processes Planning Processes Control Processes Executing Processes Closing Processes Project Information Flow

February 17, 2004 Pat A. Eigbe, PMP ® 16 PM Process Flow

February 17, 2004 Pat A. Eigbe, PMP ® 17 Initiation Processes  Identify project and sponsor  Appoint Project Manager  Train team on a Project Management Process a Project Plan (PMIP)  Develop Program Directive to Include a WBS that Covers the Scope a High-level Milestones a Budget resources

February 17, 2004 Pat A. Eigbe, PMP ® 18 Planning Processes I  Identify Life Cycle approach a Evolutionary (AMS 6101, Section 2.2) a Incremental a Waterfall  Risk Management plan

February 17, 2004 Pat A. Eigbe, PMP ® 19 Planning Processes II  Get approval for Program Directive  Identify quality standards - use specs, IEEE, ISO, PMBOK ®  Organizational structure  Communications - who needs, what  Acquire human resources for projects

February 17, 2004 Pat A. Eigbe, PMP ® 20 Planning Processes III (Schedule Development)  Update & Decompose WBS  Identify activities  Sequence  Estimate duration  Estimate cost  Allocate resources to work packages  Baseline schedule

February 17, 2004 Pat A. Eigbe, PMP ® 21 Planning Processes IV  Risk management detail: a Identification a Analysis a Response a Procurement

February 17, 2004 Pat A. Eigbe, PMP ® 22 Implementation/Execution Processes  Use the PMIP to execute project activities  Assess Technical Performance to assure product acceptance  Distribute project information  Make purchases  Develop team skills/competencies  Develop a Change Management plan

February 17, 2004 Pat A. Eigbe, PMP ® 23 Performance Measurement Tools  Variances  Performance Indices a Schedule performance Index (SPI) a Cost performance Index (CPI)  Earned Value Management System (EVMS)

February 17, 2004 Pat A. Eigbe, PMP ® 24 Earned Value Management System Highlights  What is EVMS  Planning for EVMS  Tracking & Analysis  Elements of EV Analysis  Project Cost & Schedule Forecasting  EV Reporting

February 17, 2004 Pat A. Eigbe, PMP ® 25 Earned Value Management System (EVMS) - I  EV - Tool for Measuring Project Performance  Integrates Cost, Scope & Schedule measurements  Compares work actually accomplished to work planned  EV is an Early Warning System  Helps management make proactive decisions to keep projects on course

February 17, 2004 Pat A. Eigbe, PMP ® 26 Earned Value Management System (EVMS) - II  Involves Calculating 3 key Elements a Budget - BCWS a Actual Cost - ACWP a Earned Value/Physical Progress - BCWP  Basis for variance analysis

February 17, 2004 Pat A. Eigbe, PMP ® 27 Planning for EVMS - I  Create a work breakdown structure  Organize work into discrete work packages and activities  Allocate a budget to each of the activities  Develop a schedule and Assign resources  Must include all project work in the schedule  Establish the Project Baseline

February 17, 2004 Pat A. Eigbe, PMP ® 28 Planning for EVMS - II  Award performance credit for physical % complete:  a Short duration tasks < 160 hours a EV is Zero until activity is complete  a Duration less than 600 hours a 50% at start of activity & 50% at completion

February 17, 2004 Pat A. Eigbe, PMP ® 29 Planning for EVMS - III  Interim milestone; a Duration less than 600 hours a Based on completed milestone for task  Level of Effort (LOE) a Long duration & consistent tasks a Difficult to measure - no tangible deliverables a Measured by duration of time used e.g. 10 weeks support is 50% complete at 5 weeks

February 17, 2004 Pat A. Eigbe, PMP ® 30 Tracking & Analysis  Each update cycle/Reporting Period: a Obtain physical % complete for each task a Calculate EV for each task a Sum up EV for all tasks as project EV a Calculate actual expenditure for actual work completed during the period a Compare the Cumulative EV to Actual expenditure

February 17, 2004 Pat A. Eigbe, PMP ® 31 Elements of EV Analysis - I  Performance indices relate value of work performed to dollar spent. e.g. CPI = 0.65 means that for every dollar spent, actual value of the work performed is $0.65.  Cumulative CPI used to forecast project cost at completion  Cumulative SPI used to forecast project completion date

February 17, 2004 Pat A. Eigbe, PMP ® 32 Elements of EV Analysis - II  Cost Variance - Difference between budgeted cost of an activity & actual cost of that activity a CV = EV - ACWP  Schedule Variance - Difference between scheduled completion & actual completion of an activity a SV = EV - BCWS

February 17, 2004 Pat A. Eigbe, PMP ® 33 Elements of EV Analysis - III  SPI – EV/Planned Value  SPI => 1.0, Project Schedule performing as planned or better  SPI < 1.0, Project not performing as planned - needs help

February 17, 2004 Pat A. Eigbe, PMP ® 34 Elements of EV Analysis - IV  CPI – EV/Actual Cost  CPI => 1.0, Project Cost performing as planned or better  CPI < 1.0, Project Cost not performing as planned - needs help  % Over/Under Budget = CAC - BCWS

February 17, 2004 Pat A. Eigbe, PMP ® 35 Project Cost & Schedule Forecast Methods  Estimate at Completion (EAC) is total cost to complete an activity, work package, or a project expressed as: a EAC = Actuals-to-date + Estimate to complete (ETC)  Cost EAC = BAC/CPI

February 17, 2004 Pat A. Eigbe, PMP ® 36 EV Reporting  Interpret the output of EV calculations  Take corrective action as necessary  Recommend or take corrective action as necessary

February 17, 2004 Pat A. Eigbe, PMP ® 37 Control Processes I  Coordinate and control changes to project a scope/requirements a schedule a budget  Monitor and manage product quality  Measure progress and report performance

February 17, 2004 Pat A. Eigbe, PMP ® 38 Control Processes II  Monitor and control risks a keep track of identified risks a monitor residual risks a identify new risks a ensure execution of risk plans a assess effectiveness in reducing risk

February 17, 2004 Pat A. Eigbe, PMP ® 39 Closing Processes  Close out contracts  Resolve any outstanding issues  Document lessons learned  Evaluate project  Archive all project documents

February 17, 2004 Pat A. Eigbe, PMP ® 40 Conclusion  Defined Frequently used PM Terminologies  Discussed Objectives of Adopting Project Management Principles.  Discussed PM Processes, Tools & Techniques  Discussed EVMS Overview  Questions

February 17, 2004 Pat A. Eigbe, PMP ® 41 References  Project Management Institute (PMI), A Guide to the Project Management Body of Knowledge (the PMBOK ® Guide)  Stratton R. W., Improving SPI and CPI Calculations on LOE Heavy Programs, Proceedings of the 30th Annual PMI Seminars & Symposium  Fleming and Koppeman, Earned Value Project Management.  Ibbs W & Reginato J., Quantifying the Value of Project Management  Kerzner H, Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 

February 17, 2004 Pat A. Eigbe, PMP ® 42 Questions/Need Help? Pat A. Eigbe, PMP ® Ext