McDonald’s Heated Landing Zone

Slides:



Advertisements
Similar presentations
How to check close-to-the-line arrows F E D E R A T I O N I T N E R N A T I O N A L E D E T I R A L ' A R C a b TOP VIEW FRONT VIEW a b c d e c d e.
Advertisements

Selling Inoculants Module One – How are your Cows?
Zebra® 105SL™ * Removing and Installing Printhead
Circulating Water System
WIRED TYPE MULTI ZONE FANCOIL CONTROL SYSTEM MODEL : WSF- 700 SYSTEM
Digital Non-Programmable Thermostat. Digital screen Setpoint indicator- Appears when the Setpoint temperature is displayed Low battery warning Temperature.
VIDEOCON SBS REF. Display panel Water dispenser Castors REF Compartment Door handle FRZ Compartment.
Optical Manufacturing Solutions 1 Probe Assembly.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
AUDIO VISUAL TRAINING University Center. BLACK BOX EQUIPMENT IN CLASS University Center LCD Projector/Built In Screen Laptop Connection (VGA Cord) Control.
Heating Control Devices
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
2G BBULBE PASS Instructions-4 Replacement of bubble generator.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Head jig usage procedure RKC London Office. Set the head jig 2) Put two screws with loose condition 3) Lock the plate 4) Tighten two head jig screws 5)
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Programming CMIII SELP Select button to program SensitivitySet between 0-9; 0 essentially turns off feature Cook TimeSelect cooking time for product Pressing.
Trevor Thompson Senior Project II Vermont Technical College Spring 2011.
© 2012 Rinnai America Corporation Rinnai Circ-Logic (RCL)
Engineer Training Electrical System Overview and Requirements.
Usage Guidelines Throughout this template you will find tip-boxes to the left of the slides. To remove this box from the final presentation, simply click.
After Receiving this error code, Follow these steps to correct the problem… Click for next slide.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Using the 100B Computer. McDonald’s 100B Controls ON/OFF, left side in split pot. ON/OFF, right side in split pot. Displays oil temperature When lit,
PPE Use Standard (SSP-0011) Y Full Face Shield / Goggles Hood Clothing—Chemical Protection Gloves—Chemical Personal Fall Protection Respirator / Filter.
2 Who Is Carter-Hoffmann? 3 Carter-Hoffmann n Holding n Transporting n Rethermalizing n Serving.
1 PRINCE CASTLE (For Reference Use Only). 2 Prince Castle Universal Rapid Toaster.
RO400FC Forced convection hot air reflow oven. In a flexible production, what do you need for soldering of  Complex PCB’s  Soldering of fine pitch on.
Maintenance Course Preventive Maintenance Course.
Smile training Smile_training_engl. Sept.02.ppt Honeywell Proprietary Jan. 31st, Smile Controller Family.
Settings & Adjustments. Settings & Adjustments.
Setting up the Ricoh C305 Press F5 to start the Presentation
Introducing the UHC-HD for McDonald’s
Vacuum system.
Engineer Training Pneumatic System Overview. Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
1 THE VICTOR READER WAVE ● Plays DAISY books as well as music and books on MP3 or audio CD ● Powerful navigation features ● Go directly to any page number.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
MODEL : EDF-102 SERIES 1. APPLICATION The EDF-102 thermostat is designed to provide temperature control of heating or cooling systems in villas, hotels.
2G BBULBE PASS Instructions-5 Replacement of Heater.
1. Chapter 3 Aligning and Indenting Paragraphs 3 Paragraphs in Word A paragraph in Word is any amount of text followed by the press of the Enter key.
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
Digital Temperature Switches The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
User Interface – Switch Panel 6 Gang Switch Panel Configuration guide RS485 Terminal Fixing hole Bayonet Front ViewBack View.
Service Section Technical Training December 2005.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Initialization 1Turn the power switches to both the heater controller and the viscometer on (up). 2On heater controller turn C/F toggle switch to F (degrees.
Multifunctional LCD Panel HDL-MPL8.48. LCD Panel Description The HDL-MPL8.48 series is a new generation of wall mounted switch, with a total of 8 metal.
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Unit 1: “Move!”. NXT Functions NXT Functions can be found under “NXT I/O” on the functions palette in an instance targeting the NXT.
Last updated: 6/6/2016www.alto-shaam.com Halo Heat Training Cook & Hold OvensHolding Cabinets.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Last updated: 6/28/2016www.alto-shaam.com Rotisserie Training Rotisserie.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
Easy Reach 7.0 Honda Element 2003
Date of download: 3/4/2018 Copyright © ASME. All rights reserved.
T400 Motor Replacement.
6. Disassembly & Reassembly
Front panel wiring PICO 155
3000CIV 21/2”-10”.
Assembling/Dismanteling Method of the Socket
2000CIV 2½ ”-10”.
4000CIV 21/2”-10”.
Replacing TrueAir Thermostat with Ecobee SI
709 2½ ”-10”.
Presentation transcript:

McDonald’s Heated Landing Zone The HLZ is designed to hold wrapped sandwiches while the meal order is completed

Five screws on the bottom of the unit secure the controller tower.

Nuts holding the air tower diffuser in place should be loosened, not removed when dismantling the unit.

The sealant on the seam of the heater plate must be cut prior to prying the plate off of its adhesive backing. Remove the plate when the unit is hot; the adhesive will be more pliable.

Air RTD Air Thermocouple Relays Fuses

Blower Assembly

Air Heater

Check temp. of heater plate / adjust setpoint Check temp. of air heater / adjust setpoint ON/OFF Programming switch Adjust setpoint

The setpoint for the plate and the air heater can be changed: With the unit off, press the Check button and then buttons marked 1,2,3,3 in that sequence.

SET will be displayed. Press 1 to adjust heater plate; press 4 to adjust air temp. Use UP (2) and DOWN (3) arrow keys to adjust setpoint.

Press Check to lock in changes.

The reliability of the HLZ’s temperature readouts can be checked The reliability of the HLZ’s temperature readouts can be checked. Test ports are positioned on the unit’s front panel, which allow independent measurement of the heater plate and air heater’s temperature. A variance of ± 50F between readout and meter is acceptable.

HLZ Wiring Diagram 12V LOAD COM 208/240V FUSE BLOCK POWER CORD WHT BLK GRN/Y 240V OPTION (CAP UNUSED WIRE W/MALE PUSH-ON) PLATE HEATER AIR HEATER GRN RED BLOWER TOP PLATE THERMOCOUPLE (TYPE K) BOTTOM AIR HEAT RELAY PLATE HYPOT TEST POINT + LATCH 1 8 6 4 2 AIR THERMOCOUPLE (TYPE K) COMPUTER TEST RED WIRE NEGATIVE PLUGS 7 9 12 3 5 14 11 13 15 10 BRN RTD AIR RTD 208V OPTION

The blower should be oiled twice annually in these ports.