Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.

Slides:



Advertisements
Similar presentations
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Advertisements

ISIS Electrical Engineering Group
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Trieste (IT), 20 may 2008POPCA A novel 60 MW Pulsed Power System based on Capacitive Energy Storage for CERN PS machine Jean-Paul BURNET CERN, European.
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Details of space charge calculations for J-PARC rings.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Frithiof Andreas Jensen Notes from: “Green Technologies developed at Research Infrastructures”
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Power Supply System for DRFS
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Chinese Academy of Sciences Institute of High Energy Physics Accelerator Center Power Supply Group Status of BEPCII and CSNS Power Supply System Qi Xin.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
ICFA mini-Workshop on Beam Commissioning for High Intensity Accelerators Yasuhiro Watanabe (J-PARC / JAEA) Tracking between bending and quadrupole families.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
The Survey of the Power Supply Reliability at SSRF
High power beam operation at J-PARC: status and future
KEK Marx-Modulator R&D
J-PARC main ring lattice An overview
Development of new power supplies for J-PARC MR upgrade
Junji Urakawa (KEK) for ATF International Collaboration
Klystron Power Supplies for ILC
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
Beam dynamics requirements after LS2
SLHC-PP kick-off meeting, CERN 9 April 2008
Explanation of the Basic Principles and Goals
CEBAF Pulsed Operation for JLEIC Electron Injection
JLEIC Ion Integration Goals
Presentation transcript:

Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group

Contents About J-PARC Main Ring and Upgrade Requirement for New Power Supply Design of the New Power Supply Capacitive Energy Storage Development of the Capacitors Next Step and Summary

J-PARC Main Ring (MR) The current intensity is up to 250 kW (Fast Extraction) Fast Extraction : Long baseline neutrino oscillation experiment (T2K) Slow Extraction : Hadron and Nuclear physics experiments Proton beam is provided by 2 different extraction modes Circumference1568 m Injection Energy3 GeV Extraction Energy30 GeV Repetition Rate0.4 Hz RF Frequency MHz Number of bunches8 Synchrotron tune Betatron tune22.4, 20.75

Upgrade toward 750 kW Operation Increasing Repetition Rate from 0.4 Hz to 1 Hz Current PSNew PS Output Voltage3 kV6 kV Output Current1560 A Output Power5 MW10 MW Rep. Period2.5 s1.0 s Requirement for new Power Supply

Energy Storage Output Power of the PS for one Bending magnet family for all Bending Families not allowed at main !! Output Power Variation = 96 MVA Current Power Supply Only one converter between load and main (current-type converter) No Energy Storage Output Power = Power at main Output Power 1 Hz Operation 16 MVA Need Energy Storage

Basic Design of new power supply PS For Large Magnets ( B and Large Q ) PS For Small Magnets ( Small Q and Sext.) Large capacitive energy storage to reduce power variation at main grid Choppers in series for higher output voltage (shorter ramp up time) Low noise digital feedback system for precise current control Design Concept for 1 Hz Operation

Effect of Capacitive Energy Storage Input Power (Red) with capacitive energy storage Input Power can be reduce by 70 % Simulation for one bending magnet family Magnetic Energy flow Loss Compensation All magnetic energy (~10 MJ for 1 bending family ) is provided from the capacitor energy storage Only loss is compensated from the main

Capacitive Energy Storage 1 s have longer than 10 years lifetime ( ~ 10 8 charge-discharge cycles ) not be shorted internally (for safety) The capacitor should Dry-type film Capacitor Long lifetime No internal short by self-healing structure smaller and cheaper by recent technology progress Used for many applications such as shinkansen, hybird car and so on

Self-Healing Structure Many small pixel capacitors connect with each other A pixel capacitor with weak part is isolated by over current As a result, the capacitance decreases by 1/10000 The lifetime is defined as the time until capacitance decreases by 5 % Internal Structure of Film Capacitor More pixels = Safer

AC or DC ? For DC voltage For AC voltage (50/60 Hz) Many (small) pixels Higher voltage (200 V/  m) fewer (Large) pixels to reduce discharge at the surroundings of pixels due to voltage change Lower voltage (<100 V/  m) Bigger Our application (Not 50/60 Hz but only 1 Hz) is the middle of DC and AC DC Capacitor- based development !!

Lifetime test with DC capacitor Material C is selected Extrapolated lifetime (5 % capacitance drop) = 4.5 ×10 8 pulses Difference of the electrode material 60 Hz (accelerating test by factor 60) Capacitance Drop (%) material A material B material C Capacitor design was fixed !! Single capacitor : 2mF 2.5 kV kg Time (h)

Next Step number of capacitors in one unit bank ? type of containers selection of fuse type of tests (short test with fuse ?) We are currently working on those issue Things to do for Capacitor bank design Ex. PS Bending families (Most of capacitors are there ) 2kV mF capacitors a few tons ×12 (# bending families)

Summary Upgrade for 750 kW is planed in J-PARC MR by increasing the repetition rate from 0.4 Hz to 1.0 Hz Power supplies with energy storage is needed for the 1 Hz operation due to reduce the power variaton at main grid Capacitive energy storage is the 1 st candidate Capacitor development have been completed Designing of the capacitor bank is the next step

10 -6 Other R&Ds - Low Noise Digital Feedback System- 24 bit A/D board and DSP board was developed in KEK Frequency (Hz) Test of the developed system using the PS for Sextupole Test of the developed system using the PS for Sextupole Current 200 A The output current can be controlled at ppm level The result will be published A/D Board DSP Board