CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT April 4, 2013 These materials have been prepared by the CASBO San Diego- Imperial Section Purchasing.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Prepared by Andrée M. Cohen, Purchasing Administrator CITY OF NEW ORLEANS 2012 PROCUREMENT & PURCHASING PROCESS TRAINING CITY OF NEW ORLEANS 2012 PROCUREMENT.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
APRIL 3-6, 2013, LONG BEACH, CA Cooperative Purchasing Programs APRIL 3-6, 2013, LONG BEACH, CA.
Historically Underutilized Business Program Texas Department of Insurance Special Deputy Receiver Program January 2008.
December 9, 2014 San Diego County Office of Education ESFG Meeting Tyree Dorward:Attorney, Best, Best, & Krieger Guiselle Carreon: Commercial Warrants.
TAUD UTILITY LEADERSHIP CONFERENCE The Law for Commissioners: Ignorance Is No Excuse.
Public Hospital Districts Public Works Web Conference Association of Washington Public Hospital Districts.
Bid Process/Purchasing
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Uniform Public Construction Cost Accounting (UPCCA) presented by: Kevin Cobb AIA/ARA, the Addington Partnership William Duncan IV, Taft College December.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Office of Purchasing and Contracts Procurement Outreach Training Level II – Module A Orders between $10,000 and $50,000.
JOHN DEIGHAN CHIEF PURCHASING OFFICER ALLEGHENY COUNTY DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING.
SB 854 – Public Works Contractor Registration Program
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Marcy Mealy Procurement Specialist CDBG Program
WELCOME! SBE Boot Camp LEARN HOW TO BID JOB ORDER CONTRACTS (JOC)
Presenters: John Finney, Contract Services Manager
For West Virginia Department of Education DISCLAIMER This PowerPoint presentation serves only as a snapshot of purchasing regulations. Please visit the.
PROCEDURES FOR SELECTING THE CONTRACTOR
Washington Metropolitan Area District Office SBA.
1 CDBG Procurement Requirements For Local Officials.
Purchasing Procedures By Susan Guastella March 18, 2008.
U.S. Small Business Administration
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Former Fort Ord Prevailing Wage Application and Enforcement Michael Houlemard Fort Ord Reuse Authority.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
School Budget Materials & Forms
Request For Proposals (RFP) Process Board of Directors Special Meeting January 29, 2014.
FISCAL RESPONSIBILITY IN TITLE III AND OTHER SPONSORED PROGRAMS AND GRANTS ADMINISTRATION Presented by Sharon S. Crews, M.Ac., CPA Vice President for Administrative.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
October 2015 Labor Compliance Department Boot Camp Presentation 1 Presented by: Jessica Tam.
Meet DES Curtis Pate Roland Orr Engineering & Architectural Services Delegated Contracting Authority.
UCB Accounting System Review Prepared by: T. Dobson 6/28/01.
Office of Procurement Services.  Vendor Application Website: 
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
Stockton University Purchasing and Grants 11/4/15.
Jack H. Jenkins, CPA, P.C.. Organization of board and employees – Assigned responsibilities Procedures for accounting functions – Recording and reporting.
Introduction to Procurement for Public Housing Authorities Alternatives to Procurement: Force Account Labor Unit 9.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
MAKING A SUCCESSFUL PURCHASE Prepared by the Contracts and Procurement Department of the Texas Juvenile Justice Department 2/24/2016.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Contractors Equipment Insurance A brief overview.
Introduction to Procurement for Public Housing Authorities Small Purchase Procedures Unit 4.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
A Schools Legal Service Tutorial
Discussion of the Differences Public Works Law and Bid Law
Metra Construction Contractor Prevailing Wage Workshop
Update on CUPCCAA and Conversation with a Commissioner
City of Norfolk Office of the Purchasing Agent
TENDERING PROCEDURE IT-3981/EN
Department of Community Development
2018 Clerks Summer Conference
The Office of Procurement PURCHASING TRAINING MAY 2018
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Kentucky County Treasurer’s
Purchasing Process Overview
Introduction to Procurement for Public Housing Authorities
2019 General Services Conference
Presentation transcript:

CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT April 4, 2013 These materials have been prepared by the CASBO San Diego- Imperial Section Purchasing Professional Council (or CASBO Associate Member). They have not been reviewed by State CASBO for approval, so therefore are not an official statement of CASBO

CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT Presented by Guiselle Carreon CASBO San Diego-Imperial Section Purchasing Professional Council

GENERAL INFORMATION: What is CUPCCAA? –The Uniform Public Construction Cost Accounting Act (Act), enacted in 1983 under Public Contract Code Section et seq., allows local agencies to perform public project work of up to $45,000 with their own workforces if the agencies elect to follow the cost accounting procedures set forth in the Cost Accounting Policies and Procedures Manual of the California Uniform Construction Cost Accounting Commission.

What is a Project? –A project is defined as the construction, reconstruction, erection, alteration, renovation, improvement, demolition and repair work involving any publicly owned, leased or operated facility. Painting or repainting of any publicly owned, leased or operated facility. –The Commission feels that all cost elements -- personnel, materials, supplies and subcontracts, equipment and overhead -- associated with a project must be recorded and reported at the project level.

What is Force Account? Force Account –A force account accurate for work performed on public projects using internal resources, including but not limited to labor, equipment, materials, supplies, and subcontracts of the public agency. Project costs for force account work include the following: Direct Costs: –Labor including all benefit costs –Equipment charged on an hourly rate including depreciation, insurance, maintenance/repair, fuel and oil, tires and grease, etc. –Cost of materials and supplies with a total unit value of $25 or more including discounts, tax, and shipping. Indirect Costs: –Other labor including inspection, clerical, and project supervisors. –Other expenses including utilities, telephone, temporary fencing, etc. Overhead Costs: –30% for school districts or the use of actual overhead rates.

ALTERNATIVE LIMITS Public projects of thirty thousand dollars ($45,000) or less may be performed by the employees of a public agency by force account, by negotiated contract, or by purchase order. Public projects of one hundred seventy-five thousand dollars ($175,000) or less may be let to contract by informal procedures as set forth in this article. Public projects of more than one hundred seventy-five thousand dollars ($175,000) shall, except as otherwise provided in this article, be let to contract by formal bidding procedure.

$45,000 or less: Work may be done by internal forces or by contract/purchase order. $45,000 to $175,000: Project must be let by competitive bid. All contractors on the list for the category of work being bid or all construction trade journals specified in Section 22036, or both all contractors on the list for the category of work being bid and all construction trade journals specified in Section 22036, shall be mailed a notice inviting informal bids unless the product or service is proprietary. $175,000 and up: Projects must be let by competitive bid using the formal competitive process. CONTRACTING PROCEDURES

Force Account / Work Done by Purchase Order/Contract When estimating for a project up to $45,000; keep in mind that all standard public contract and labor code requirements must be met including but not limited to the requirement to call for prevailing wages, payment bond for projects in excess of $25,000, fingerprinting, etc. Change orders are only permitted to a maximum contract total of $45,000. Best practices would include ensuring that you are getting the required scope of work for the best price; therefore, obtaining multiple quotes is desirable. When internal forces are also bidding on the work; keep in mind that the cost includes labor, materials, supplies, and equipment.

List of Qualified Contractors During November each year, each Public Agency which has elected to become subject to the Uniform Public Construction Cost Accounting Procedures shall mail a written notice to all construction trade journals designated for that Agency under Section 22036, inviting all licensed contractors to submit the name of their firm to the Agency for inclusion on the Agency's list of qualified bidders for the following calendar year. The notice should require the following information: Company name Contact name and mailing address Contact phone number, fax number, and address Type of work contractor is interested in performing Type of work contractor is licensed to perform Contractor's license class and number Districts are encouraged to include contractors that have submitted a bid in the 12 months prior to the effective date of the list. Contractors may also be added on an ongoing basis.

Notification of Contractors Informal Bids: All contractors on the list for the category of work being bid or all construction trade journals specified in Section 22036, or both all contractors on the list for the category of work being bid and all construction trade journals specified in Section 22036, shall be mailed a notice inviting informal bids unless the product or service is proprietary. Notification must be made at least 10 days prior to the bid opening. Formal Bids: The notice inviting formal bids shall be mailed to all construction trade journals specified in Section The notice shall be mailed at least 15 calendar days before the date of opening the bids. In addition to notice required by this section, the public agency may give such other notice as it deems proper.

INFORMAL BIDDING Projects between $45,000 and $175,000 shall be let as follows: –All contractors on the list for the category of work being bid or all construction trade journals specified in Section 22036, or both all contractors on the list for the category of work being bid and all construction trade journals specified in Section 22036, shall be mailed a notice inviting informal bids unless the product or service is proprietary. –The notice shall be sent at least 10 days prior to bid opening. –All standard public contract and labor code requirements must be met including but not limited to prevailing wages, payment bond for projects in excess of $25,000, fingerprinting, escrow agreement, DVBE, labor compliance, etc. –The authority to award informal contracts may be delegated. –Contracts may be awarded up to $175,000. Effective January 1, 2012, bids received above $175,000 may be awarded up to $187,500.

Formal Bids Formal bids are let using the standard bid process as outlined in Public Contract Code with the exception that a 15- day notice shall be sent to all contractors on the qualified bidders list or the mandated trade journals, or both.

Emergency Contracts In cases of emergency when repair or replacements are necessary, the governing board may proceed at once to replace or repair any public facility without adopting plans, specifications, strain sheets, or working details, or giving notice for bids to let contracts. The work may be done by day labor under the direction of the governing board, by contractor, or by a combination of the two. By a four-fifths vote of the governing board, may repair or replace a public facility, take any directly related and immediate action required by that emergency, and procure the necessary equipment, services, and supplies for those purposes, without giving notice for bids to let contracts. By a four-fifths vote of the governing board, the authority to enter emergency contracts may be delegated as long as the designee takes the action to the governing board within 7 days or at its next regularly scheduled meeting which shall be no more than 14 days after the action was taken. The designee must report at each following meeting until the action is terminated (contract completed). Code is in conflict with boards that meet on a monthly basis.

Opting in to the CUPCCAA The governing board must elect by resolution to become subject to the California Uniform Public Construction Cost Accounting Act. The district must notify the State Controller in writing of its election to become subject to the uniform cost accounting procedures and forward a copy of the resolution. The district must adopt a policy outlining informal bidding procedures. Once a district has opted in, it must conform to the uniform cost accounting procedures until the district opts out of the Act by adopting a resolution opting out and forwarding said resolution to the State Controller.

Using the Standard Accounting Code Structure to Track Projects The tracking of projects completed by Force Account is much less daunting that it appears. Since SACS allows districts to account by fund, resource, program, and object code; tracking can be done by the use of standard accounting practices. For example by using the Resource, Program, or other portion of SACS, project tracking can be done within the financial system: Labor: Fund Sub-Fd Resource Goal Function Object Loc. Prog. Resp. Proj. Yr XXXX XXX Equipment: Fund Sub-Fd Resource Goal Function Object Loc. Prog. Resp. Proj. Yr XXXX XXX Materials & Supplies: Fund Sub-Fd Resource Goal Function Object Loc. Prog. Resp. Proj. Yr XXXX XXX

Questions: For any questions please call: Guiselle Carreon (619) 644–8051 Commissioner: Small School (ADA<25,000) Director of Purchasing Grossmont Union High School District Josie H. Ripoly (951) ext Commissioner: Large Schools (ADA>25,000) Purchasing Director Moreno Valley Unified School District