Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: November 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

TECH PROJECT COMPANY X DOCUMENTATION PLAN ANALYZE PHASE November 13, 2013 Stephanie Sachs & Shane Hatchett.
Reducing False Failures in Metrology TECH 581: Measure Phase John R. Ulrich Fall 2013.
Patient Admission from ED to Acute Care Tech 581: Analyze Presentation November 11, 2008 xxxxxx Sound Removed.
TECH Project Bank Card Procurement Process Measure Phase Date: Oct 29, 2014 Dave Shoffner.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
TECH Project Healthcare IT Asset Management Analyze Phase Date: 11/13/2013 Team members: Angela Hutson.
Domestic workers – situation in the Czech Republic.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
TECH Project Title Payroll Fund Analysis Phase Date:12 Nov, 2013 Team members: Matt Unger.
Map the current process
Degree and Graduation Seminar Scope Management
TECH581 Fall 2013 Measure Presentation October 23, 2013 Alex Garcia.
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: October 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Root Cause Analysis Procedure (IMSP525) Training
Six Sigma Quality Engineering
Misr For Central Clearing, Depository & Registry Dr. Tarek Abdel Bary Managing Director Corporate Actions Automation to reduce risk Presentation AMEDA.
TECH581 Fall 2013 Measure Presentation November 11, 2013 Alex Garcia.
Tech 50800: Champion/Define Presentation Summary of project  Sycamore companies are collecting information on cars from three different locations to.
TECH Project Measure Phase QC Throughput Rate Improvement.
TECH Project Change Management Process Improvement Analyze Phase Date:11/7/2014 Team members: Matt Kirchhoff.
Pam Sakamoto, Sr. Public Health Nurse, CCS Program Cynthia Coutee, Office Assistant III, TB Control Program May 1, 2012 The Phases of Continuous Quality.
Overview of NIATx & Process Improvement Process Improvement Overview and Basic Training 2008.
Release & Deployment ITIL Version 3
Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH
Use of OCAN in Crisis Intervention Webinar October, 2014.
IAOD Evaluation Seminar “Demystifying Evaluation in WIPO- Best Practices from Initial Evaluations” Geneva November, Validation of Program Performance.
Introduction to Design of Experiments
1 E-911 Services Board Meeting General Business Meeting May 08,
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
TECH Project Bank Card Procurement Process Analyze Phase Date: 11/19/2014 Dave Shoffner.
Establishing a baseline of the seven day services clinical standards in acute care ‘A how to guide’ To activate the links in this slide set please view.
“How to fail in project management without really trying” –J. K
NICNE Development Workshop DEVELOPING A BUSINESS PLAN Jeff Fahrenwald, AVP Graduate and Community Education.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
TECH581 Fall 2008 Measure Presentation Date: 10/24/08 Team members: xxxxx Sound Removed.
Improving Patient Bed Wait time in Healthcare DATE: 19 NOVEMBER 2014 TEAM MEMBERS: PRIYANKA PRIYANKA. AHMAD ALMATROOD. TECH Analyze Phase.
Different approaches an analysis might use when investigating a system including: – Questionnaires – Interviews – Document gathering and analysis.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
The Essentials of Grant Writing Mena Gainpaulsingh International Fundraising Consultancy
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Understanding Monitoring & Indicators. What is Monitoring?  A continuing function that uses systematic collection of data on specified indicators to.
Improving a TPL Billing System John Greenawalt, LPC Director of Quality Management TERROS April 12, 2011.
The Cutting Edge Training Your Art Museum Volunteers Need Group A – Curriculum Design Professionals  William LaFave  Maria Mancha  Frank Jaquez  Kendra.
Team-Based Development ISYS321 Managing the Information Systems Project.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Fishbone Diagrams Clinical Microsystems Training.
Six Steps To Problem Solving A simple systematic approach to problems and issues faced by students By MK NKWANE g15N7271 TUESDAY GROUP.
Session 6: Data Flow, Data Management, and Data Quality.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
DEC. 11, 2015 DAVID SCHIPPNICK TECH PROJECT STREAMLINE ORDERING IMPROVE/CONTROL.
Tech 50800: Champion/Define Phases DATE: PRESENTER: DARON SAUNDERS.
Cindy Tumbarello, RN, MSN, DHA September 22, 2011.
STREAMLINE PRODUCT ORDERING PROCESS TECH PROJECT CHAMPION/DEFINE PHASE.
Cowlitz County, WA Accounting Function Review
ASK MBSAQIP Agenda ASK MBSAQIP November 10, 2016 Time (CST)
Developing Community Assessments
EMERGENCY OPERATIONS PLANS
Final Report: Analysis of Room Turnover Processes for EP and Cath Labs
Resource Family Approval
DMAIC Project Template
Adopting a patient pre-registration process
QUALITY ASSURANCE “Go High or Go Home!”.
Adopting a patient pre-registration process
2/16/ :01 PM Driver Diagrams.
Finance & Planning Committee of the San Francisco Health Commission
Presentation transcript:

Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: November 2013 LSA Team members: Escobar, Luis Johansen, Shahpar Rammohan, Akhila

Agenda  Business Case  Problem Statement  Project Objective and Scope  Goal Statement and Deliverables  CTQ Tree  Data collection Plan  Fishbone Diagram  KPIV’s and KPOV’s  SWOT Analysis  Conclusions

Business Case: Improve the Data Management at The Caring Center The aim of this process is to improve the current data management system and help track the progress of The Caring Center Clients once they leave the system or if they return for more help. This data management tracking improvement will help The Caring Center their long term goal “Zero by 2020” which is ending Childhood Hunger In Boone County by year By improving and tracking The Caring Center’s current system, the clients can be identified and serviced more efficiently. The consequences of not improving the efficiency of this process are  Loss of data.  Lack of clarity on data.  Delay in the process of admission.  Unable to track progress over time.

Problem Statement Problem Statement: The unclear system of admitting the clients into The Caring Center is resulting in a vast amount of unmanageable data being accumulated. In addition, the gathered data is unable to generate any statistical information. The problem impacts the organization in the following ways:  Unable to generate statistical information from the gathered data  Loss of past data leading to inability of tracking progress.  Unable to inform The Caring Center’s donors of their progress and ultimate goal.  The current process does not show the relevant information required to obtain government and private grants for The Caring Center.

Project Objective & Scope Objective:  Minimize the loss of data for The Caring Center.  Increase the performance of data collection to generate statistical information in the next period of time 4 months.  Decrease the current 45 minutes admission process to under 15 minutes. Scope: The admission process starts with the client filling out the Client Intake Form. The Caring Center, upon further approval from the Executive Director admits the client and generates a unique ID number. The ID number is used by staff member to feed the data into an excel spreadsheet.

Goal Statement & Deliverables Goal Statement: Develop an efficient admission process to minimize the loss of data to 0% using a robust database software, and reduce the current waiting period to under 15 minutes. Provide guidelines to allow The Caring Center to gather relevant tracking information to reach their long term goal of “Zero by 2020”. Deliverables (long-term, end results of project):  To develop a database of the information to track progress.  To develop a new admission process  To reduce the waiting time for the clients

CTQ Tree

Data Collection Plan  The current process is measured in minutes.  The process begins with the admission in the front desk.  All the stages are measured.  We try to identify the step where the process is delayed.  We try to identify the reasons for these delays.  The real data collection was made in 5 labor days.  We input fake data for statistical purposes and we generate graphics with this fake data.  The last step was under the permission from Professor Rennels.

Fishbone Diagram Tracking Problem Time Consuming People Office Small work space Noise environment Wrong software Long Term Tracking Caring Centers’ Staff Clients Don’t follow the existing procedures Not enough staffing during peak times Mostly undereducated Potentially give wrong ID Not enough training Workflow design problems Procedures Equipment

KPIV’s and KPOV’s

SWOT Analysis

Conclusions 1.The fishbone diagram was used to identify the main causes of the problem from The Caring Center. 2.We have observed three main causes and ten secondary causes. 3.The final effect of this step is observed too. It is known as Tracking Problem Time Consuming. 4.The new process map will permit us to create the baseline for the new KPIV and KPOV. 5.The new process map will lead us to minimize the loss of data, increase the performance of data collection, generate statistical information, and decrease time admission process.

Thank you