A PRESENTATION ON BICYCLE PROJECTS, PLANS, AND OPPORTUNITES FOR PUBLIC INVOLVEMENT BICYCLE/PEDESTRIAN PLANNING COMMITTEE presents.

Slides:



Advertisements
Similar presentations
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
Advertisements

LAKE COUNTY TRANSPORATION CONNECTIVITY PROJECT Connecting people with communities and schools; working via safe roads and alternative transportation corridors.
Louisiana Safe Routes To School Program
Cowlitz Regional Trails Plan. Introduction Cowlitz County Parks Facilities Plan Cowlitz County Parks Facilities Plan Cowlitz County Bikeway Plan Cowlitz.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Portland, Oregon: Smart Transportation Planning By: Eric Boucher Bryan Daupinais Andrew Hurczyn Matthew Pepin.
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Introducing Bicycle/Pedestrian Planning & School Travel Plans Presentation prepared for the 2010 Active Transportation Conference Jim Fisher, PhD, AICP.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
1 Item 9: (DRAFT) Briefing on the Draft Update of the Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell DTP Presentation to the.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
The SMART CHOICES PROGRAM and TRANSIT-ORIENTED DEVELOPMENT Presentation to ETS Annual Community Conference March 11, 2006.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
HILTON HEAD ISLAND’S BIKE AMBASSADORS Steve Alfred Chair, Biking Ambassadors Town of Hilton Head Island Bicycle Advisory Comm.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
City of Leawood Bicycle Friendly Community The Year in Review.
Nottingham’s Cycling Action Plan to 2015 Keith Morgan Transport Strategy Nottingham City Council.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Lompoc Community Assessments “What We Learned” Presented by Judy Taggart MS, CHES March 25, 2010.
Biking as Transportation Safely Today we will have a great and safe ride. We will use our bikes as transportation. We will ride in pods, following our.
Bicycling in Montgomery County Where we are and where we’re going Montgomery Bicycle Advocates (MoBike) – 5/14/11.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Traffic-Intolerant Bicyclists and Boston’s Greenway Network Peter G. Furth Professor Department of Civil & Environmental Engineering Northeastern University.
The Main Street Bike Lane Project LADOT Bike Program.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Grand Canalscape Phase I and II General Update October 30, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Complete Streets Training
Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Arizona Forward Update
What's in the 2009 MUTCD For Bicyclists?
Voorhees Town Center Vision
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Office of Greenways & Trails
The Central Avenue Connector Trail
US 92 Pedestrian Connectivity & Safety Assessment Study
Livability Committee Carmel Valley Community Planning Board
Cycling infrastructure spending 2017
District 3 Complete Streets Projects
Complete Streets Policy + Bicycle / Pedestrian Plan
Seattle Bike Map Update
STREETS & STORMWATER DEPARTMENT
US 92 Pedestrian Connectivity & Safety Assessment Study
Texas Department of Transportation
Citrus Park Drive Extension
Presented by BikeOCNJ bikeocnj.org August 22, 2018
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
City of Wilmington Bike Plan Update
Bicycle and Pedestrian Update to City Council
Emily Guenther Zach Olson Laura Scott Cameron Wein
“The North Crossing” Accessible Connection from Rideau Heights to Kingscourt and the Downtown.
MPO Board Presentation
PA ROUTE 6 ALLIANCE UPDATE March 19, 2019.
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Presentation transcript:

A PRESENTATION ON BICYCLE PROJECTS, PLANS, AND OPPORTUNITES FOR PUBLIC INVOLVEMENT BICYCLE/PEDESTRIAN PLANNING COMMITTEE presents

TABLE OF CONTENTS Background Background Bicycle Map Bicycle Map Front Side Map Front Side Map Back Side Information Back Side Information Prioritized Project List Prioritized Project List Path Forward Path Forward

BACKGROUND qGoal is network of high ease of use bicycle routes. +Bicycles are fast and convenient alternate to car commuting for moderate distances (less than 5 miles) in urban areas. +Cycling already popular in high ease of use, LSU, and Mid City areas for commuting and recreation. qMap publicizes existing network of streets and paths. qProjects address deficiencies (low ease of use) in existing streets network. qSign-marked routes (projects) link existing streets to facilitate longer distance destinations for casual and recreational riders.

qStreets Rated for Ridability: +High ease of use (green) +Moderate ease of use (yellow) +Low ease of use (orange) +Bike Paths and Lanes (blue) qProject Routes (numbered) qOther Streets (light gray) qDestinations including: +Bike Facilities +Fire & Police Stations +Libraries +Schools +Points of Interest BICYCLE MAP FRONT INFORMATION

BICYCLE MAP FRONT SIDE

High Ease of Use

Moderate Ease of Use

Low Ease of Use

Marked Routes

BICYCLE MAP BACK SIDE

BICYCLE MAP BACK INFORMATION qSafety Tips qCycling Laws qIndex to Key Destinations qRegional Orientation Overview qDetail of Downtown and LSU Area qCommunity Participants in Map Development and Contacts for Follow-up

Detail of LSU Area

Bicycle Safety Tips

State and City Bicycle Laws

Source and Contacts

Brightside Drive Bike Route (Project A09) MarkMileInstructionFor 10.0 Brightside Dr at Nicholson, connect with existing Nicholson Path, continue on Brightside either with expanded 9ft wide one-side path, or add second 5 ft path on south side of Brightside 0.7 mi 20.7 Intersection with Heather stone 0.6 mi 31.3 Intersection with River bend 0.8 mi 42.1 At River Rd., Connect with future levee bike/ped path (north) and existing Bike training route (south) PROJECT EXAMPLE

LIST OF PRIORITIZED PROJECTS Pri. A,B,C0-9 TitleScopeJustificationCost $K Sum $K Resp. A01City Park - Broadmoor Route (#2) From City Park to Flannery Rd through subdivisions and bike lanes Uses existing quiet streets and bike lanes to publicize an available route $45 A02Connells Village-Vine St at Airline Highway Provide bike lane at intersection, with bike friendly traffic signal Marked access across busy road. Part of City Park - Broadmoor route. $15$60 A03Cyril Avenue to Independence Park/Library 7 Oaks Ave.(City Park-Broadmoor Route) to Library across canal & Goodwood Marked Access to Goodwood Library and Independence Park $120$180 A04Downtown to LSU Route (#1)From Vet School to Downtown via Dalrymple, 19th, and North/Main Sts. Marked Access to and from LSU and Downtown by trails & streets $30$210 A05LSU to Training Route via Farr Park (#3) Skip Bertman to training route loop Recognize existing marked bike routes to training area on River Road $45$255 A06Broadmoor to North Flannery (#4) Broadmoor to Flannery via Cortana and streets north of Florida Blvd. Marked Access from North of Florida to Cortana and Downtown connections $30$285 A07Downtown Levee Trail Connector Connect planned levee trail with downtown. Use Centroplex bridge Need safe access to levee trail across RR, and Front St. (ADA Accessible) $200$485 A08Nicholson Drive PathProvide street lights along existing bike/pedestrian path. Safe lighting on 24 hour use route between student apartments and LSU. $150$635 A09Brightside Dr.Improve existing bike path Nicholson to River Rd. 2-6ft wide or 1-9ft wide. Safe access on well used route shared with pedestrians $650$1,285 A10Revitalize Scotlandville ParkReplace bridge, provide lighting, and police bike patrols Safe use of existing park, provides access through Scotlandville. $50$1,335 A11Corporate BoulevardCollege Dr. to Old Hammond Hwy.Safe access to entertainment, shopping and adjacent residential $500$1,835 A12Cycling EducationElementary and Adult Education on Safe Cycling Practices 3 yr pilot program Improve cyclist and future driver's safety by leaning correct practices $2002,035

PROJECT STATUS  Low cost first projects identified  Route project funding not secured  Preliminary cost estimates based on unengineered scope.  Cycling education in progress with funding from BREC and DOTD.

 Review map and projects with state holders and public. CRPC Neighborhood Associations Parish Council Main Street Market (Saturday AM)  Maps Initial run funded by DPW and CRPC Distribution by: +Bike Shops +BREC +Culture Recreation & Tourism +Bike Clubs +CRPC +Website PATH FORWARD

  Projects Develop Route Projects depicted on Map, ASAP using local funds. Continue with education and roll from “Train the Trainer” to public education. Larger projects developed as possible, using matching funds. PATH FORWARD continued

CRPC METROPOLITAN PLANNING ORGANIZATION FOR THE BATON ROUGE AREA BICYCLE/PEDESTRIAN PLANNING COMMITTEE Thank You