Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
BRYAN YOUNG Preventative Maintenance Working With Safety.
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Accel Computerized Maintenance Management System.
The Basics of Information Systems
Joint Culinary Center of Excellence (JCCoE) US Army Quartermaster School Food Management Assistance Team (FMAT) Visit to Installation Management.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More than experience CERN – 3rd MAY 2011 – Kick-off meeting Maintenance Assessment Project – Kick-Off Meeting Arek Burnos, Tony Vaclavicek, Tom Pryslak.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
1 SPIRIT. 2 Silicon Prairie Initiative on Robotics in Information Technology A Typical Day in Engineering.
1 Chapter 1 Introduction To Purchasing IDIS 424 Spring 2004.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
Quality Assurance/Quality Control Policy
Development and Quality Plans
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
1 AMMW2013 workshop 13 d – 15 th of November, 2013 Asset management tools: use and improvement in SOLEIL – P. Betinelli Asset management tools: use and.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Trindel Insurance Fund
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
From Research Prototype to Production
Equipment Management Audience – Local lab responsibilities.
Hot Topic event Portsmouth – 26/3/08 Auditing, Benchmarking & Awards in maintenance departments Cosmas Vamvalis Implementations Manager ATLANTIS Engineering.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
ROLE This position reports to the Chef Service Prevention HSE Member of the IA Ops HSE Division. Provides Technical HSE support to all IA Ops Divisions.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
PSR at Training Reactor VR-1 Marek Sedlbauer Czech Technical University in Prague IAEA Workshop on Application of the Code.
Atlanta Area OAUG Meeting January 18, 2008 Using Oracle eAM to Support Asset Reliability.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
State of Georgia Release Management Training
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
TE-CRG Activities D. Delikaris, TE-CRG.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
World Health Organization
Implementation of Computer Maintenance Management system - CMMS
Maintenance Scheduling
How to Pass SMRP (Society of Maintenance
Equipment simplified model SMR UR safety
Instrument Maintenance
Configuration Management and Layout Database ELENA Project
د. حنان الداقيز خريف /28/2016 Software Quality Assurance ضمان جودة البرمجيات ITSE421 5 – The components of the SQA.
MAINTENANCE PLANNING AND SCHEDULING
FaciliWorks CMMS ®.
Infor EAM in the Handling Engineering Group at CERN
L&V Manpower Development Prepared by: HR department Mar, 2013
The Basics of Information Systems
Onsite Training at JLab
The Basics of Information Systems
Program Introductions Who we are, what and where Clients and Systems
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman, L. Weissman, A. Nagler Soreq NRC, Yavne, Israel WAO 2007 September 26 th, 2007

2 26/9/2007 SARAF Accelerator Building and InfrastructureCryogenicsRF

3 26/9/2007 SARAF Building and Infrastructure BuildingCHWHVACComp. AirCommunicationSafetyElectrical Supply and DistributionControl Systems

4 26/9/2007 Senior Engineering Team (SET) SET Members: oElectrical Engineer (Control Systems, Infrastructure, RF) oMechanical Engineer (Cryogenics, Vacuum) oPhysicist (Accelerator, Diagnostics, Beam lines) oIndustrial Engineer (Maintenance Management, Documentation) oSafety Specialist (“online” safety, procedures for present and future) oTwo accompanying part time technicians Responsibilities: oOperation oSystems Commissioning and Acceptance oMaintenance oEngineering and Technical Office oTraining

5 26/9/2007 Operation  Most infrastructure systems were accepted and serve accelerator installation and commissioning purposes  SET members ware trained up to supervisor level to operate the infrastructure systems

6 26/9/2007 Accelerator Systems Commissioning and Acceptance (1)  SET members are participating and assisting in accelerator installation, commissioning and acceptance tests  Effort is lead by the accelerator contractor personnel and is under their responsibility

7 26/9/2007 Accelerator Systems Commissioning and Acceptance (2)  Emphasis is on thorough learning and understanding of all systems and components  SET members spend about 40% of their time on these tasks

8 26/9/2007 Engineering and Technical Office  Engineering tasks and Technical Office responsibilities are entwined  Engineering  R&D of accelerator supplementary systems (Control, Diagnostics, infrastructure)  Writing maintenance and operating procedures  Technical Office  Documentation of engineering tasks  Updating of documentation and drawings  Archiving of engineering data  Maintenance schedule  Coordination among SARAF and external contractors and suppliers  Purchasing of spare parts and stock management

9 26/9/2007 Maintenance  Maintenance procedures concern operational and mechanical systems conditions  Currently, maintenance is mainly performed on  The building  Infrastructure systems  Cryogenics  Part of the accelerator vacuum and RF  The maintenance works are divided into:  Breakdown Maintenance (BM)  Preventive Maintenance (PM)  Predictive Maintenance (PdM)

10 26/9/2007 Breakdown Maintenance (BM)  Most of the systems are still in their warranty periods, so they are usually repaired by the system contractor  In urgent cases, breakdown maintenance is performed by SET members  The procedure for BM is 1.BM is requested in the commissioning logbook (if encountered during shifts) or in a PM form (if encountered during PM) 2.The BM Request is accepted and checked by the relevant SET member 3.A BM form is issued 4.BM is performed according to the procedures 3.A BM technical report is prepared 4.The BM technical report is checked and approved by the SET head 5.The data base of the Computerized Maintenance Management System (CMMS) is updated 6.The approved report is logged and stored in the BM archive

11 26/9/2007 Preventive Maintenance (PM)  For accepted systems PM procedures have been written and scheduled by the technical office  The procedures are based on the system contractor requests and maintenance timetables (with small deviations)  PM is performed either by SET members, the system contractor or other external contractors  The procedure for PM is 1.A PM procedure form is issued by the technical office 2.PM is performed and reported on the form 3.The PM report is checked and approved by the SET head 4.The data base of the CMMS is updated 5.The approved report is logged and stored in the PM archive

12 26/9/2007 Predictive Maintenance (PdM)  Predictive Maintenance (PdM) is an integral part of preventive maintenance  Measurements of systems parameters are performed routinely to observe patterns and predict equipment breakdowns or malfunctions  Typical measurements and operations include  Thermal imaging of electrical cabinets  Electric current measurements of motors and other equipment  Pressure and flow measurements of process cooling water systems  Gas and water analysis in relevant systems

13 26/9/2007 Computerized Maintenance Management System (CMMS)  For the abovementioned tasks we developed a Computerized Maintenance Management System (CMMS), which enables SET members to schedule and structure maintenance tasks  The SARAF CMMS is a Microsoft Access based maintenance database management system which includes 1. Assets Management 2. Preventive Maintenance Scheduling and Management 3. Report Generation

14 26/9/2007 CMMS – Asset Management Component Data Screen

15 26/9/2007 CMMS – Asset Management Service Providers Screen

16 26/9/2007 CMMS - PM Scheduling and Management Weekly Monthly Quarterly Semi-annual

17 26/9/2007 CMMS – Reports Generation The 2007 Annual BM report

18 26/9/2007 Workload during commissioning

19 26/9/2007 Conclusions  Development and assimilation of maintenance and engineering systems during accelerator installation and commissioning presents a big challenge for SARAF Senior Engineering Team.  Currently, the biggest effort is the accelerator installation and commissioning, so maintenance and engineering receive a smaller share of the workload  It is unequivocal that after the accelerator systems will be accepted, the maintenance load will grow accordingly. Therefore major SET tasks are:  Verified written procedures  A CMMS including all of the accepted systems  Appropriate training of SET members  Development of a maintenance culture

Thank You

21 26/9/2007 Breakdown Maintenance Report

22 26/9/2007 Printed request for PM procedure