Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Spectrometer Solenoid Tech Board Schedule Discussion
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Magnets - Virostek 11 MICE Magnets Steve Virostek Engineering Division Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
Status of MICE Coupling Coil Magnets D. Li and M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory February 16, 2011 MICE CM29-Rutherford.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE CM35 RAL/Abingdon February 14, 2013 MICE CM35 RAL/Abingdon February 14, 2013

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL TopicsTopics Control system upgrade Control system upgrade Latest magnet training results Latest magnet training results Summary of 2nd magnet progress Summary of 2nd magnet progress Schedule Schedule Control system upgrade Control system upgrade Latest magnet training results Latest magnet training results Summary of 2nd magnet progress Summary of 2nd magnet progress Schedule Schedule

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Control System Upgrade A control system review was held at LBNL on December 11 th and 12 th, 2012 A control system review was held at LBNL on December 11 th and 12 th, 2012 The LBNL/MICE team has responded to the numerous recommendations from the review panel The LBNL/MICE team has responded to the numerous recommendations from the review panel The main goal was to move towards a more robust system capable of preventing a repeat of the ice blockage and other potential failures The main goal was to move towards a more robust system capable of preventing a repeat of the ice blockage and other potential failures A secondary goal was to move closer to the final system that will be operated in the MICE hall A secondary goal was to move closer to the final system that will be operated in the MICE hall A control system review was held at LBNL on December 11 th and 12 th, 2012 A control system review was held at LBNL on December 11 th and 12 th, 2012 The LBNL/MICE team has responded to the numerous recommendations from the review panel The LBNL/MICE team has responded to the numerous recommendations from the review panel The main goal was to move towards a more robust system capable of preventing a repeat of the ice blockage and other potential failures The main goal was to move towards a more robust system capable of preventing a repeat of the ice blockage and other potential failures A secondary goal was to move closer to the final system that will be operated in the MICE hall A secondary goal was to move closer to the final system that will be operated in the MICE hall

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Control System Upgrade Some of the more important upgrades: Incorporated a stand alone PID controller for the cold mass heater circuit w/current monitor Incorporated a stand alone PID controller for the cold mass heater circuit w/current monitor Added an alarm handler to the control software Added an alarm handler to the control software Installed a gas bottle backup system to prevent negative cold mass pressures; improved durability of pressure relief valves Installed a gas bottle backup system to prevent negative cold mass pressures; improved durability of pressure relief valves Added current shunts to directly measure the current going into the coils Added current shunts to directly measure the current going into the coils Some of the more important upgrades: Incorporated a stand alone PID controller for the cold mass heater circuit w/current monitor Incorporated a stand alone PID controller for the cold mass heater circuit w/current monitor Added an alarm handler to the control software Added an alarm handler to the control software Installed a gas bottle backup system to prevent negative cold mass pressures; improved durability of pressure relief valves Installed a gas bottle backup system to prevent negative cold mass pressures; improved durability of pressure relief valves Added current shunts to directly measure the current going into the coils Added current shunts to directly measure the current going into the coils

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Power Supplies and Control Power Supplies New 500 A supply for center and end coils New 500 A supply for center and end coils 5 supplies fully integrated 5 supplies fully integrated Tested both into a short and into the cold magnet Tested both into a short and into the cold magnet Control rack Many upgrades installed Many upgrades installed UPS added UPS added New heater control loop New heater control loop Power Supplies New 500 A supply for center and end coils New 500 A supply for center and end coils 5 supplies fully integrated 5 supplies fully integrated Tested both into a short and into the cold magnet Tested both into a short and into the cold magnet Control rack Many upgrades installed Many upgrades installed UPS added UPS added New heater control loop New heater control loop

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Recent Activity Lots of help – much appreciated!

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Recent Effort by Many People Many people have come to Wang NMR to help with system preparation and training: Control system: Steve Griffiths, Ian Mullacrane, Adrian Oates (Daresbury) Control system: Steve Griffiths, Ian Mullacrane, Adrian Oates (Daresbury) Control software: Pierrick Hanlet (FNAL) Control software: Pierrick Hanlet (FNAL) Quench system: Roman Pilipenko (FNAL) Quench system: Roman Pilipenko (FNAL) Cooldown: Heng Pan, Tianhuan Luo, Allan DeMello, Andrew Lambert, Nanyang Li, Steve Virostek (LBNL) Cooldown: Heng Pan, Tianhuan Luo, Allan DeMello, Andrew Lambert, Nanyang Li, Steve Virostek (LBNL) Training: Linda Coney, Maria Leonova (FNAL); Heng Pan, Tianhuan Luo, Etienne Rochepault, Steve Virostek (LBNL) Training: Linda Coney, Maria Leonova (FNAL); Heng Pan, Tianhuan Luo, Etienne Rochepault, Steve Virostek (LBNL) And numerous others behind the scenes And numerous others behind the scenes Many people have come to Wang NMR to help with system preparation and training: Control system: Steve Griffiths, Ian Mullacrane, Adrian Oates (Daresbury) Control system: Steve Griffiths, Ian Mullacrane, Adrian Oates (Daresbury) Control software: Pierrick Hanlet (FNAL) Control software: Pierrick Hanlet (FNAL) Quench system: Roman Pilipenko (FNAL) Quench system: Roman Pilipenko (FNAL) Cooldown: Heng Pan, Tianhuan Luo, Allan DeMello, Andrew Lambert, Nanyang Li, Steve Virostek (LBNL) Cooldown: Heng Pan, Tianhuan Luo, Allan DeMello, Andrew Lambert, Nanyang Li, Steve Virostek (LBNL) Training: Linda Coney, Maria Leonova (FNAL); Heng Pan, Tianhuan Luo, Etienne Rochepault, Steve Virostek (LBNL) Training: Linda Coney, Maria Leonova (FNAL); Heng Pan, Tianhuan Luo, Etienne Rochepault, Steve Virostek (LBNL) And numerous others behind the scenes And numerous others behind the scenes

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Working on Both Magnets TrainingTraining AssemblyAssembly

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Current Progress Magnet has been successfully cooled down, and training is now under way Magnet has been successfully cooled down, and training is now under way All five power supplies are being used at various ramp rates and under computer control All five power supplies are being used at various ramp rates and under computer control New cold mass heater control loop working well New cold mass heater control loop working well Three training quenches are now complete Three training quenches are now complete Three unrelated issues have caused premature quenches during training: failed contactor relay, short circuit in charging circuit, trim supply control issue Three unrelated issues have caused premature quenches during training: failed contactor relay, short circuit in charging circuit, trim supply control issue These problems all appear to have been remedied These problems all appear to have been remedied Magnet has been successfully cooled down, and training is now under way Magnet has been successfully cooled down, and training is now under way All five power supplies are being used at various ramp rates and under computer control All five power supplies are being used at various ramp rates and under computer control New cold mass heater control loop working well New cold mass heater control loop working well Three training quenches are now complete Three training quenches are now complete Three unrelated issues have caused premature quenches during training: failed contactor relay, short circuit in charging circuit, trim supply control issue Three unrelated issues have caused premature quenches during training: failed contactor relay, short circuit in charging circuit, trim supply control issue These problems all appear to have been remedied These problems all appear to have been remedied

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Problem Fixes Contactor relay It appears the faulty relay had been cycling when the magnet was warm and eventually wore out It appears the faulty relay had been cycling when the magnet was warm and eventually wore out The unit was replaced by the Daresbury team, and there have been no problems since The unit was replaced by the Daresbury team, and there have been no problems since Charge/discharge circuits Short circuits were discovered in two of the units between the diodes and the heat sink block Short circuits were discovered in two of the units between the diodes and the heat sink block All four units were rebuilt: disassemble, contacts cleaned, replace Kapton film, reassemble, torque bolts, checkout All four units were rebuilt: disassemble, contacts cleaned, replace Kapton film, reassemble, torque bolts, checkout Trim supply control Control system reboot appears to have fixed problem Control system reboot appears to have fixed problem Contactor relay It appears the faulty relay had been cycling when the magnet was warm and eventually wore out It appears the faulty relay had been cycling when the magnet was warm and eventually wore out The unit was replaced by the Daresbury team, and there have been no problems since The unit was replaced by the Daresbury team, and there have been no problems since Charge/discharge circuits Short circuits were discovered in two of the units between the diodes and the heat sink block Short circuits were discovered in two of the units between the diodes and the heat sink block All four units were rebuilt: disassemble, contacts cleaned, replace Kapton film, reassemble, torque bolts, checkout All four units were rebuilt: disassemble, contacts cleaned, replace Kapton film, reassemble, torque bolts, checkout Trim supply control Control system reboot appears to have fixed problem Control system reboot appears to have fixed problem

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Charge/discharge Circuits

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL Recent Training Runs HTS lead failure After warmup, HTS lead replace and cooldown After warmup, control sys mods, and cooldown

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL 2 nd Magnet Progress The second cold mass/shield assembly is now complete - in the vacuum vessel, MLI wrapped The second cold mass/shield assembly is now complete - in the vacuum vessel, MLI wrapped Benchtop assembly of the vacuum vessel tower is nearing completion – delayed by availability of additional cryocooler sleeves Benchtop assembly of the vacuum vessel tower is nearing completion – delayed by availability of additional cryocooler sleeves LBNL mechanical technicians playing a key role in assembly – currently affected by ALS shutdown LBNL mechanical technicians playing a key role in assembly – currently affected by ALS shutdown Cryocooler tests are also under way – 4 coolers purchased by U. Miss., test of 2X length hoses Cryocooler tests are also under way – 4 coolers purchased by U. Miss., test of 2X length hoses The second cold mass/shield assembly is now complete - in the vacuum vessel, MLI wrapped The second cold mass/shield assembly is now complete - in the vacuum vessel, MLI wrapped Benchtop assembly of the vacuum vessel tower is nearing completion – delayed by availability of additional cryocooler sleeves Benchtop assembly of the vacuum vessel tower is nearing completion – delayed by availability of additional cryocooler sleeves LBNL mechanical technicians playing a key role in assembly – currently affected by ALS shutdown LBNL mechanical technicians playing a key role in assembly – currently affected by ALS shutdown Cryocooler tests are also under way – 4 coolers purchased by U. Miss., test of 2X length hoses Cryocooler tests are also under way – 4 coolers purchased by U. Miss., test of 2X length hoses

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL 2 nd Magnet Progress Cryocooler testing

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL 2 nd Magnet Progress Benchtop assembly of 2 nd magnet tower

LBNL MICE CM35 14 February Spectrometer Solenoid Update  Steve Gourlay  LBNL ScheduleSchedule Cooldown completed at the end of January Cooldown completed at the end of January Training and magnetic measurement likely continue into early March Training and magnetic measurement likely continue into early March 2 nd unit assembly expected to be complete in April – training to follow shortly after 2 nd unit assembly expected to be complete in April – training to follow shortly after Current schedule calls for both magnets to be delivered to RAL in early August ‘13 Current schedule calls for both magnets to be delivered to RAL in early August ‘13 2 nd magnet progress affected by 1 st magnet training and LBNL tech availability 2 nd magnet progress affected by 1 st magnet training and LBNL tech availability Cooldown completed at the end of January Cooldown completed at the end of January Training and magnetic measurement likely continue into early March Training and magnetic measurement likely continue into early March 2 nd unit assembly expected to be complete in April – training to follow shortly after 2 nd unit assembly expected to be complete in April – training to follow shortly after Current schedule calls for both magnets to be delivered to RAL in early August ‘13 Current schedule calls for both magnets to be delivered to RAL in early August ‘13 2 nd magnet progress affected by 1 st magnet training and LBNL tech availability 2 nd magnet progress affected by 1 st magnet training and LBNL tech availability