CHEDS Experiment Title…… o Experimental Staff & Affiliation:  Principal Investigator (PI)  Co-PI  Post Doc  Graduate Students  Undergraduate Students.

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

Standard Operating Procedures Guidelines and Support.
Welcome to Online OHS All your OH&S needs in one easy to follow database system.
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
Environmental Health and Safety Oklahoma State University Hazard Communication Your “Right to Know”
CE En 112 Engineering Drawing with CAD Application
Design Project MAK112E Computer Aided Technical Drawing Dr C Erdem – 9.30 Project work (meeting) Search in internet, patents and standards.
Laboratory Fume Hoods In accordance with Title 8 CCR Section , Ventilation Requirements for Laboratory-Type Hood Operations. California State University.
1 FUME HOOD SAFETY Environmental Energy Technologies Division Safety Topic July 12, 2012.
Overview of Phase 4 Performance Validation Methods and Techniques.
D-ES-x-xxx Rev A 5/17/10 1 of 21 (Title) – Final Design Review (FDR) (name) PI (name) PA Date of Review First Use Acknowledgements Image of diagnostic.
University of Michigan Commitments for a Sustainable Office Environment Terry Alexander, Executive Director Office of Campus Sustainability October 21,
PRESENTED BY ABC TEXAS GULF COAST CHAPTER
APPLIED LOGISTICS The Productivity Improvement Program for Warehousing and Transportation.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Laser Registration and Inspection Based on a building-wide inventory Judi Reilly and Meg Himmel.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
WHS Management Plans.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
Jim Page, 2007 Chapter 5: Mishap Photography MINA Handbook.
Documenting Network Design
Visual 7.1 Common Responsibilities Version 2.0 Unit 7: Common Responsibilities.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Civil Contractors Federation ‘2012 Earth Awards’ Submission Template CATEGORY 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the companies.
Authorization and Inspection of Cyclotron Facilities Inspections.
Facilities ESR Electronic Service Request. Use the ESR to do the following: Submit a service request electronically to the facilities department Submit.
ISO OPERATIONAL CONTROL
Planning & Writing Laboratory Reports A Brief Review of the Scientific Method.
EFFECTS OF THE VENUS GROUND AMBIENT ENVIRONMENT ON MATERIALS Principal Investigator: Linda Del Castillo Co-Investigators: James Polk, Michael Pauken, Elizabeth.
Application Training — Letters and Reports. Welcome Introduction Slide 2 Tell us… Your name Your department or area of work Number of years you have completed.
Writing an Effective Lab Report
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
CIP Quality System for Genebank ISO 17025
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
CHEDS Experiment Title…… o Experimental Staff and contact information: Example:  Principal Investigator (PI)  Co-PI  Staff Scientist  Post Doc  Graduate.
1 15 quality goals for requirements  Justified  Correct  Complete  Consistent  Unambiguous  Feasible  Abstract  Traceable  Delimited  Interfaced.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
J.P. Hornak, , 2004 Research Practices http://
Compliance Suite™ Compliance Suite™ is Physical Plant’s software program for regulatory compliance and training tracking.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 4. Principles of Dimensioning This week you will learn dimensioning. The steps to follow are: Functional & Non-functional Dimensions Principles of Dimensioning.
Objectives Understand Corrective, Perfective and Preventive maintenance Discuss the general concepts of software configuration management.
UC Berkeley Extension Classroom Canvas Training
Today’s lab: 1. Reports due in 1 week 2. Statistics Practice.
COMPETENCY AND PROFICIENCY ASSESSMENT OF ANIMAL CARE TRAINING PROGRAMS IN ACADEMIC INSTITUTIONS Elizabeth Dodemaide B.V.Sc., M.A. Associate Director, Laboratory.
A Relevant and Descriptive Title Your Name and Your Partner’s Name Mrs. Ouellette, Honors Biology Licking Heights High School A Relevant and Descriptive.
Aspect 1 Defining the problem - Problem: The design context will normally offer a variety of potential problems to solve. A focused problem and need is.
EMResource Reports Procedures Update. To retrieve the status information associated to your facility, there are two reports that you will need. Status.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
Scientific data storage: How are computers involved in the following?
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
AP Transpiration Lab Write up requirements Title your Lab: AP Lab Investigation #11 - Transpiration Write Down the guiding question (top of page S135)
Special Device Review (Device Name)
Introduction to New Product Development (Specifications)
Yr 10 Candle Holder.
Software Requirements
A Relevant and Descriptive Title
A Road Map to Food Safety
CHME 590/690 Jett Hall Lab Researcher Commissioning
Findings and Recommendations of the Student/Postdoc Panel:
Chemical Safety & Security Standard Operating Procedures
Chemical Safety and Security Plan
Accident Investigation
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Presentation transcript:

CHEDS Experiment Title…… o Experimental Staff & Affiliation:  Principal Investigator (PI)  Co-PI  Post Doc  Graduate Students  Undergraduate Students o Run Date: mm/dd/yyyy - mm/dd/yyyy o Travel logistics: o Arrival day/time for all staff o Duration of stay for each staff o Hotel information o Contact information while in Austin

CHEDS Experimental Objectives List and explain in detail the scientific objectives of the experimental run

CHEDS Experimental Concept Explain in detail the concept for achieving the experimental objectives

CHEDS Experimental Concept Figure o Update the experimental concept as necessary For example:

CHEDS F/3 Detailed experimental diagram and setup o If your experiment uses the F/3 chamber, show a drawing of the target chamber with your overall layout using the drawing below. Include all measurement instruments (inside or outside chamber) to scale. NOTE: The following TPW Chamber drawing formats are available upon request: eDrawing, 3D PDF, SolidWorks, ProE, Inventor, Inventor.prt,.its,.stp,.sat,.stl,.dxf, jpeg, pdf, psd, tiff, bmp

CHEDS F/40 Detailed experimental diagram and setup o If your experiment uses the F/40 chamber, show a drawing of the target chamber with your overall layout using the drawing below. Include all measurement instruments (inside or outside chamber) to scale. NOTE: The following TPW Chamber drawing formats are available upon request: eDrawing, 3D PDF, SolidWorks, ProE, Inventor, Inventor.prt,.its,.stp,.sat,.stl,.dxf, jpeg, pdf, psd, tiff, bmp

CHEDS Equipment & resource lists o Complete the following table of experimental diagnostics o Include delivery dates of all hardware being shipped to TPW. o Update list of equipment supplied by TPW that the experiment requires. Use additional pages as needed NameTypeLocation (inside, on flange or outside chamber) Status

CHEDS Target alignment Provide a sketch or photograph of your mounted targets Explain how the target will be aligned to the laser, note in particular: Tolerances up/down and left/right (size of target region) Tolerance and preferred position in the laser propagation direction (z) Fiducial points on the target to aid with target positioning, their dimensions and locations relative to the main target, and how they are intended to be used Constraints imposed by alignment to an experimental instrument Features on the front side of the target that may obstruct the clear view of the laser focus on the target surface, such as an indentation or built-in shielding. Give the dimensions of each such feature.

CHEDS Experimental plan & shot requests o List all measurements required to achieve experimental objectives. Include equipment required to make those measurements o Describe in detail your shot procedure: (example) o vent chamber (6 minutes) o install target (5 minutes) o switch out film in electron spectrometers (5 minutes) o Pump down (30 minutes) o Align single target to best focus (10 minutes) o Shoot a single target

CHEDS Experimental plan & shot requests o Describe daily shot plan assume 4-5 shots per day in the f/3 chamber and 5-6 shots/day in the f/40 chamber: o Number and type of shots and target configuration anticipated on each day Day#/S hot# Target Type and configuration Laser Energy Pulse Duration Focal Spot Target Location Use additional pages as necessary

CHEDS Experimental plan & shot requests (continued) o Describe experimental direction. As far as you can anticipate, how will your shot plan change depending on what you see? How critical are specific pulse parameters, and how will you adapt the experiment if laser parameters are not exactly as requested ?

CHEDS Safety Training Matrix UT EHS Safety Training Record for Texas Petawatt Laser OH Name UT EID (Optional) * (Optional) * Note: Training history can be verified in TXClass ( A valid EID is required. Additional information about EHS training is available at The University requires documentation that all laboratory employees have been trained in: 1. General Hazard Communication Training (OH available online and as lecture) 2. Site-Specific Hazard Communication Training (OH provided by workplace supervisor) The Principal Investigator/Lab Supervisor is responsible for insuring that Site-Specific training is provided to new employees and whenever the potential for exposure to hazardous chemicals increases significantly to when new or significant hazard information is received. 3. General Laboratory Safety (OH available online) 4. Hazardous Waste Management (OH available online) *Optional = Requirement only for Users that generate hazardous waste 5 Laser Safety (OH 304 – available online) 6. X-ray Safety (OH available as lecture) *Optional = Requirement only for Users that work with x-ray equipment o Fill out the training matrix below: