Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.

Slides:



Advertisements
Similar presentations
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Advertisements

ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Low Emittance RF Gun Developments for PAL-XFEL
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov Project Management.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
ERHIC design status V.Ptitsyn for the eRHIC design team.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Bob Lambiase May 21, The purpose of eRHIC is to have the capability to collide heavy ions with leptons, such as electrons and polarized electrons.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
ApEx needs for CeC PoP Experiment December 11, 2015.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
Meeting Minutes: LEReC DC Gun, Transport Lines, and Dump Installation 2016, May 26, 2016 D. Kayran, A. Fedotov, T. Miller, D. Gassner, D. Weiss, G. Mahler,
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Testing Advanced Cooling Techniques 1 Vladimir N. Litvinenko for Coherent electron Cooling team Supported by BNL (LDRDs & PD), C-AD AR&DD, and NP DoE office.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
Report Technical Director Storage-Ring-Installation Completed
CERN – Zanon discussions
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Test of Optical Stochastic Cooling in CESR
Overview of LERF Status, Plans and Goals
XFEL Vacuum System Commissioning
DC Injector and Space Charge Simulation Status
Injector Performance Requirements Conventional Facilities Update
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
Cryomodule Assembly Plan
UITF Conduct of Operations Review
Experience with the 112 MHz 4K SRF Gun for CeC PoP at RHIC
Presentation transcript:

Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF Gun System and Commission low energy e beam “Summer” Shutdown Priorities: 1.Stochastic Cooling New Longitudinal Kickers 2.eLens Magnet Measurement – Complete Installation 3.EBIS Laser Ion Source 4.56 MHz SCRF Cavity Installation 5.ERL installations/VTF testing 6.CeC PoP Installation 7.RHIC New Transverse Dampers CeC PoP Maintenance Day Installations RHIC 02:00 IP

RHIC 02:00 CeC PoP Maintenance Day Installations RHIC 02:00 IP

Phase I Major Operating systems needed for e beam commissioning. (4.5K cold) SCRF 112 MHz cavity for 2.5 MeV electron beam 112 MHz cavity support systems: cryogenic system, insulating vacuum, beamline vacuum and water cooling system for cathode, FPC, buncher cavity Laser system: laser, laser transport fiberoptic, laser alignment, window and mirror. Cathode insertion system Fundamental Power Coupler (FPC) system with RF and moveable tuner controls 500 MHz buncher cavities with tuners and support systems Beam line magnets and power supplies Beam line instrumentation components Controls and MPS for electron beam line components Access controls and approval to operate

Maintenance Day Installations VJP for cryogenic system welding The 500 MHz cavity water systems Cathode Cart prep and installation 112 MHz Cavity clean room survey 112 MHz Cavity Fundamental Power Coupler installation 112 MHz Cavity beam line and insulating vacuum, cryo controls 112 MHz Cavity water cooling system 112 MHz Laser cross and fiber optic install Cryogenic system QHS instrut./vacuum Install beam instrumentation components Install beam line vacuum Survey magnets, instrumentation, chambers Cable pulling for all (when the snow melts) Cable terminations for all

CeC PoP Outside Installations Systems Installation & Commissioning Laser Trailer: Power, laser, cable tray, fiber optic conduit, installation Cryogenic warm return compressor power and test 1002A ODH System Access controls interlocks for RF Systems testing PS, RF, Instrumentation, Cryogenic, etc. rack installation 1002A and 1002B Cable pulling and terminations for all Communications and programming for Controls and MPS Component system commissioning

Phase II Summer 2014 Installation 5 Cell SCRF (2 K) accelerating cavity (22 MeV electrons) RHIC interaction beamlines: 45 o dipole magnets, quadrupoles, correctors, vacuum, PS, etc. designed for pA! FEL Wiggler Magnets – In fabrication at BINP Beam line instrumentation for electron and RHIC beams. 8 MW beam dump