Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
PHENIX WEEKLY PLANNING 4/20/06 Don Lynch. Safety We have lost a whole week of running because of a violation of procedure and not because of the accident.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
PHENIX PLANNING Technical Support Plan for 2006 Don Lynch (updated 3/24/06)
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
M. Bianco On behalf of the ATLAS Collaboration
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
PNPI R&D on based detector for MUCH central part (supported by INTAS ) E. Chernyshova, V.Evseev, V. Ivanov, A. Khanzadeev, B. Komkov, L.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
CLAS12 Drift Chamber Prototyping
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Plan for the installation of the TAMU screen
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
First of all we will remind some numbers:
Hawkeye Mechanical Design Snapshot
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Additional Upstream Coil Shielding
After service guide for changing PCB
Presentation transcript:

Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch

Don Lynch 9/15/05 HBD Safety Review 2 HBD General Features –Detector surrounds beampipe in Central Region –Gas tight enclosure using CF 4. –SS gas piping for high gas purity routes through sill. –Transparency monitor in cabinet under South stairs. Continuous gas monitoring –Alignment –Precision:X, Y, Z : +/- 1.0 mm pitch, roll, yaw : +/- 1.0 mrad –Repeatability: X, Y, Z : +/- 1.0 mm pitch, roll, yaw : +/- 1.0 mrad –Stability:X, Y, Z : +/-.05 mm pitch, roll, yaw : +/-.05 mrad –Install in Tight Position…move to retracted position when VTX is installed –12 detector modules per arm –48 HV cables from rack on Bridge to distribution boxes 168 shorter cables from dist box to detectors (21 each for north/south, up/down, east west) –24 LV & 2304 coax pair signal cables to old MVD rack distributed along the north and south arcs for the east and west arms to the 24 panels

Don Lynch 9/15/05 HBD Safety Review 3 Materials of Construction Per Detector Enclosure: Mylar coated with Al ("Sheldahl")0.02 kg Stainless Steel Mesh0.19 kg GEM detectors ("CERN“, Cu coated Kapton) 0.50 kg PCB ("CERN“, Cu coated Kapton) 0.23 kg FR4 (Gem frames, inserts, enclosure frames)8.20 kg Aramid Fiber Honeycomb (“Plascore”)1.27 kg Plastic screws0.14 kg Delryn Screws0.05 kg “Swagelok” Stainless gas connectors0.32 kg SHV connectors (“Huber-Suhner”)1.76 kg Internal HV wire (“Huber-Suhner”) 0.42 kg Internal signal wire (“Huber-Suhner”) 0.12 kg Banana connectors Total per detector enclosure0.08 kg SMD HV resistors (“Welwyn Components”)0.20 kg Voltage Divider resistors and Connectors0.20 kg Total per enclosure kg Additional assembly wt kg Total for entire detector assembly kg (82.3 lb)

Don Lynch 9/15/05 HBD Safety Review 4 HBD final design Z= mm Clearance +/- 3 mm Gas out 2x21 HV connectors serving 2x3 detector modules Removable window FR4 frame all around the cover

Don Lynch 9/15/05 HBD Safety Review 5 HBD exploded view Window & Frame Detector Modules HV Connectors Framing Honeycomb

Don Lynch 9/15/05 HBD Safety Review 6 Panel construction The detector vessel has a polygonal shape formed by panels glued together The panels behind the HBD active area consist of a 0.25 mm thick FR4 sheet and a 0.5 mm multilayer motherboard glued under vacuum to a ¾” thick honeycomb core The other panels, outside the active area, are made of honeycomb sandwiched between two 0.25 mm thick FR4 facesheets

Don Lynch 9/15/05 HBD Safety Review 7 Installation HV Rack on Bridge 12 inch cable tray below bridge divided for HV and signal LV and signal cables to Lower Rack in former MVD rack location I beams to support HBD and later VTX. Also support plastic/aluminum cable trays to detectors (Gas supply lines run up south pole face to I-beams then to horizontally to detector connections)

Don Lynch 9/15/05 HBD Safety Review 8 Four (4) 3 inch Aluminum I-beams, 2 below and 2 above for mounting & structural support for utilities. 3 brackets from each detector hemisphere, 2 each to upper beam and 1 to lower beam with 3 point adjustment for alignment. Set y, z, roll pitch and yaw with hemisphere away from beampipe, then adjust x position radially inward. Connect gas supply and return lines Attach arched cable management to beams and pole face and back to existing MVD cable tray or up to Bridge cable tray. Attach LV, HV and signal cables Installation

Don Lynch 9/15/05 HBD Safety Review 9 Stainless Steel pipe routed to and from mixing house into AH to gas monitoring (cabinet under stairs), over labyrinth, down below tracks through sill to CM region and up CM south pole face to i-beams Gas Pipe Routing