TECH 50800 Project Change Management Process Improvement Analyze Phase Date:11/7/2014 Team members: Matt Kirchhoff.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Dr. Denise Bannan, Mr. Jeff Chapko, Dr. Jill Langen This presentation outlines what steps would have been beneficial, along with deploying some CQIlean.
TECH PROJECT COMPANY X DOCUMENTATION PLAN ANALYZE PHASE November 13, 2013 Stephanie Sachs & Shane Hatchett.
Presentation Instructions
Title: What you are talking about. Background Current Situation Goal Analysis Recommendations Plan Follow - up Why are you talking about it? Where do we.
©2014 IDBS, Confidential Statistical Process Control Workshop An Introduction to the Principles behind SPC Ilca Croufer.
TECH Project Healthcare IT Asset Management Analyze Phase Date: 11/13/2013 Team members: Angela Hutson.
TECH A Look at Software Development Analyze Phase Date: 11/13/2013 Team members: Travis W. Gillison.
Real Estate Hurricane Response Tech 581 Analyze Presentation Laban Zurowski November 13, 2013.
TECH Project Title Payroll Fund Measure Phase Date:20 Oct, 2013 Team members: Matt Unger.
TECH Project Title Payroll Fund Analysis Phase Date:12 Nov, 2013 Team members: Matt Unger.
How will this benefit your organisation? More problems will be solved! Fewer escalations of issues to managers as people gain confidence to address problems.
TECH581 Fall 2013 Measure Presentation October 23, 2013 Alex Garcia.
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: October 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
Project Storyboard Template
Total Quality Management Tools
PHD Performance Management Program Matt Gilman Spencer Soderlind Brieshon D’Agostini October 19, 2011 PDCA Training Series 2 DO 1.
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Root Cause Analysis Procedure (IMSP525) Training
Roberto lopez LSSMBB DMAIC project template.
A3 PROJECT CHARTER: Date: Sponsor: VISION OF SUCCESS What outcomes or results do you want to see? What does success look like for our customer? What does.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
TECH Project Title: Customer service management in automotive industries Analyze Phase Date: 11/19/2014 Team member: Ponnappa Bheemaiah.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
TECH581 Fall 2013 Measure Presentation November 11, 2013 Alex Garcia.
TECH Project Title : Customer service management in automotive industries Measure Phase Date:29/10/2014 Team member: Ponnappa Bheemaiah.
TECH Project Design and Manufacturing Control Process for Formula SAE Analyze Phase Date: 11/19/2014 Team members: Chris Lawrence.
Tech 50800: Champion/Define Presentation Summary of project  Sycamore companies are collecting information on cars from three different locations to.
Software Defects Defect Prevention and Removal 1.
TECH581 Improve/Control Presentation Fall 2008 Date: 12/09/08 Team Members: xxxxx xxxxx Sound Removed.
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: November 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
TECH Project Title:Customer Service management in automotive industries Improve Phase Date: Team member: Ponnappa Bheemaiah.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH
Black Belt Project Storyboard Template
Project Title Team Leadname Team MembersMember names Process Ownername Championname Insert your company logo here.
TECH581 Analyze Presentation Fall 2008 Date: 11/11/08 Team Members: xxxxx xxxxx Sound Removed.
PRINCIPLES 4 PRINCIPLES OF TQM : 1.DELIGHT THE CUSTOMER 2.MANAGEMENT THE FACT 3.PEOPLE-BASED MANAGEMENT 4.CONTINOUS IMPROVEMENT.
TECH581 Fall 2008 Measure Presentation Date: 10/24/08 Team members: xxxxx Sound Removed.
Improving Patient Bed Wait time in Healthcare DATE: 19 NOVEMBER 2014 TEAM MEMBERS: PRIYANKA PRIYANKA. AHMAD ALMATROOD. TECH Analyze Phase.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
1 Value Techniques Experiences Attitude Keep walking.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
TECH Project Title: Improving operation of Goodwill retail store Managers and abiding FLSA(Fair labor Standard Acts) for Over Time. Analyze Phase.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
CPI Event / Project Tollgate Template

The DMAIC Method
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Lean Six Sigma DMAIC Improvement Story
Participant and Leader Training
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Lean Six Sigma DMAIC Improvement Story
Lean Six Sigma DMAIC Improvement Story
Director, Quality and Accreditation
GHSP Problem Solving Team Champion: Team Members: Team Mentor:
LEAN SIX SIGMA PROJECT TEMPLATE
Student name Student ID Degree program Area of specialization
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
The 7 Basic Quality Tools ~ The DMAIC Process
Student name Student ID Degree program
Six Sigma Project Place the team photograph here Organization Name
Quality Improvement Mid-Point Progress Update 18 October 2018
Student name Student ID Degree program Area of specialization
Sepsis Program Development
CPI Event / Project Tollgate Template
Presentation transcript:

TECH Project Change Management Process Improvement Analyze Phase Date:11/7/2014 Team members: Matt Kirchhoff

Brief Review of Project Charter At least half of all major IT system changes are not completed successfully and almost none are tracked/documented consistently. This problem exists within the IT Management Team, who coordinate all systems changes Goal of process is to greatly improve efficiency and cost performance of IT system changes To significantly reduce IT change inefficiencies and ensure that 100% of all major IT changes are managed formally The scope of this process is limited to changes proposed and enacted by the IT Management Team, beginning with a change proposed by a Manager and approved/denied by the Director

CTQ Tree(s)

Data Collection Data collection to this point has been historical (and ongoing) collection of Process Checksheet information Change information is not discrete, so Checksheet record is the best method for collection For future analyses, Pareto Chart may be the best graphical view into root problems

Data Collection

Fishbone Diagram

Graphs

TECH508 Conclusions Likely eliminate “Change Not Completed” as KPIV, as only a few were not completed. Other KPIVs much more influential Pareto analysis of Process Checksheet quickly reveals most problematic process failures Biggest areas of concern are reasons why changes are not completed in a timely fashion and why they are not completed correctly Further analysis of above two with respect to Current Process Map should lead into possible solutions