Environmental System Science November 18, 2009 Identifying Energy Conservation Measures. Tailoring Retro-commissioning to meet your needs.

Slides:



Advertisements
Similar presentations
Emerado Public School: Energy Audit & Energy Conservation Alternatives Undergraduate Thesis Mechanical Engineering Kristin McKenzie March 15th, 2007.
Advertisements

Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
High Performance Buildings Congressional Caucus Coalition April 11, 2012 Washington, DC Bruce D. Hunn ASHRAE.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
DANIEL SELIGMAN Policy Manager, Maryland Energy Administration NICHELE PARKER Program Manager, Maryland Energy Administration.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
HVAC Test and Balance And The Lodging Industry. Source: Florida Power.
District Energy Initiatives 1/23/2012
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Variable Frequency Drives VFD Basics
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Energy Audits for Water and Wastewater Utilities US EPA Region 1 New England MA DEP-DOER-EOEEA.
Performance Contracting The Honeywell One Source Solution.
Need for a Professional Approach in Building Energy Audit Pradeep Kumar Sr. Technical Specialist.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Rachel Weaver Program Manager Maryland Energy Administration
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
Genesis Solar Module Brochure ™
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
STAFFORD COUNTY PUBLIC SCHOOLS ENERGY MANAGEMENT PROGRAM 2009 UPDATE Bob Randall CEM,,BEP, CBCP Energy Manager Energy Manager.
Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Managing Energy Consumption ENERGY SAVING IS ONLY GOOD IF IT SAVES YOU MONEY. ENERGY SAVING IS BETTER IF IT MAKES YOU MONEY.
“Development of Dairy Cluster in Gujarat under BEE -SME Program "
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
GREEN FIEND ENERGY & ENVIRONMENT Energy Conservation.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Does Your Building Need an Upgrade?. The common signs that your building would benefit from a mechanical/control upgrade.
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group.
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: Rafael Friedmann, PG&E Kris Bradley & Christie Torok, Quantum Consulting 2003 Statewide.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
HARVESTING LOW HANGING FRUIT EASY STEPS ANYONE CAN DO Broward College Energy Conservation Program Presented by Susyn Stecchi Broward College Energy Conservation.
Continuous Improvement Building Design Marissa Caldwell – HVAC Engineer.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Energy Conservation Building Upgrades Alma School District.
Reduce Your Operating Expenses, Increase Your Profits a Story of Energy Efficiency.
Absolute Energy Savings LLC First and foremost a service company Types of customers Customized energy savings programs Quick payback projects to detailed.
Data Analytics – A Cost Effective Approach to Reducing Operating Costs Automatically “find what matters” in the data from building equipment systems and.
PROPOSED FIVE YEAR STRATEGIC FACILITY PLAN PROGRAMS FOR 2010 TO 2015 ENGR. ROBERTO G. ROSALES, msme FACILITIES MANAGER, Member – ASHRAE Member – PSVARE.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
Robert Greenwald, P.Eng, MBA February 26, 2004
Fort Stanwix National Monument Energy Audit Contract
AEE Utility Rebates – Great River Energy
Seminar On Energy Audit Submitted To: Submitted By:
Mark Hydeman, PE of Taylor Engineering
EnMS Management Review
Lecture Objectives: Discuss Final Project
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Section 1.0 — Fundamentals and General
SALIENT ASPECTS OF ENERGY AUDIT
2018 Retro-Commissioning (RCx) Program
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

Environmental System Science November 18, 2009 Identifying Energy Conservation Measures. Tailoring Retro-commissioning to meet your needs

- What is an Energy Conservation Measure (ECM) - Developing your Scope of Work for a Retro-commissioning - Energy Audits – the basics - When to use an audit or a retrocommissioning - How to achieve your desired outcome. Overview

What is an energy conservation measure? A defined action you can take that will reduce the energy use in a building, examples: –Using the BMS to put in schedules for major equipment and lighting. –Installing a variable frequency drive (VFD) on electrical motors. –Testing, Adjusting and Balancing (TAB) if equipment found to be performing out of current specifications.

ECM: improve BMS in order to increase ability to schedule equipment. Est cost: $500,000 Est utility savings: $187,000/ year Simple Payback: 2.67 years Example of findings from RCx

1. Heating and cooling systems 2. Air handling/air distribution systems 3. Hydronics distribution systems 4. Ventilation and exhaust systems 5. Automatic temperature controls integrated with the MEP Systems 6. Coordination and functionality with the Building Management Controls System 7. Domestic Hot Water Heaters and distribution. 8. Switchgear 9. Electrical distribution 10. Lighting *You may chose to not put all these systems in the scope of work. You can tailor this process to the results you want. What will an RCxA look at?

Be specific about your deliverables. Be specific about what you already know – SOPs, current drawings, etc. Make sure their submission matches your SOW and expectations. Beware of the additional costs- are you expecting your consultant to make re-design recommendations, provide energy models? If you are not specific in your SOW of work you are likely to get a proposal based on the standard commissioning process, which probably won’t give you the results you want. Your RCx Scope of Work (SOW)?

Level I – one day walk through, quick review of energy bills, find low hanging fruit. Level II – walk through and system performance testing, also takes into account the people factor and maintenance procedures. Results in a list of ECMs for the owner and identifies capital projects that require a Level III audit. Level III – looks in detail, including possible risks, at any capital project being considered for energy efficiency or conservation reasons. Results in an intensive engineering and economic analysis of the project/. Energy Audits

Things to consider: - cost - complexity of the building - desired outcomes: low hanging fruit versus more complex solutions. If you want to bring the whole building back into operating specs and identify all building systems issues, including total range of ECMS, go for the RCx. If you want to quickly identify easily implemented ECMs only or want to assess a proposed capital project, go for the appropriate level of audit. Audit or Retro-comminsioning?

Getting the results you want? Prepare Research Question React

Questions and Discussion!