Topics OATS Overview, Rules and Reporting Obligations Order Reports

Slides:



Advertisements
Similar presentations
Electronic Data Submissions Washington, DC June 10, 2004 Presenter: Ujjval Shukla U.S. EPA.
Advertisements

Course Material Overview of Process Safety Compliance with Standards
Web Based Free Clinics PROCESS OVERVIEW March 13, 2013.
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
LeadManager™- Internet Marketing Lead Management Solution May, 2009.
Page 1 of 7 The Transfers program is an online service that will enable clients to submit electronically, the transfer of registered interest in Crown.
1 Introduction General Accounting is responsible for managing the University’s general ledger accounting system. The General Accounting office’s main goal.
Internet Applications Update Internet Rechartering August 26, 2009.
NASFAA 2003: Reconnecting With Students!. 2 eZ-Audit – Electronic Submissions of Financial Statements and Compliance Audits Session #105.
Windsor Solutions, Inc. State and Local Emissions Inventory System (SLEIS) WV DEP Regulated Community Training Tuesday, December 4 th 2012.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Outside Business Activities and Selling Away
Online Withdrawal Requests - Students Requesting a Withdrawal Themselves.
Page 1 of 23 The FMT system utilizes Roles to determine ownership and levels of responsibility within the FMT system. The Well Licensee/Unit Operator is.
TELLEFSEN AND COMPANY, L.L.C. SEC Regulation SCI and Automation Review Policy Compliance March 2013 Proprietary and Confidential.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Lecture slides prepared for “Business Data Communications”, 7/e, by William Stallings and Tom Case, Chapter 8 “TCP/IP”.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
ACRIN 6698 Diffusion-weighted MRI Biomarkers for Assessment of Breast Cancer Response to Neoadjuvant Treatment: An I-SPY 2 Trial Substudy Presented by:
Electronically approve and create Suppliers in Oracle Financials using a combination of APEX and Oracle Workflow. NZOUG Conference 2010 Brad Sayer Team.
GEORGIA ELECTRONIC CONVICTION PROCESSING SYSTEM 1 Georgia Electronic Conviction Processing System (GECPS)
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
1 29thNovember 2010 Restructuring Events Anglo Irish TIW Support DTCC Deriv/SERV A. Byatt.
AQS Web Quick Reference Guide Changing Raw Data Values Using Maintenance 1. From Main Menu, click Maintenance, Sample Values, Raw Data 2. Enter monitor.
VSoft Technologies – Confidential Cheque Image Processing Technology Outsourcing Opportunity.
Trade Software Developer Technical Seminar Document Imaging System March 7, 2012.
Btec National Diploma Level 31 IT Systems Troubleshooting and Repair Identify and select remedies.
Division of AIDS Data Interchange. Division of AIDS Data Interchange Agenda.
SEC Regulation SCI Automation Review Policy Compliance December 2014 Proprietary.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
Revenue Management System. Agenda An Overview of  RMS Features  DSW in RMS context.
© CME Group Index Services LLC All rights reserved. Overview: Pro Forma Index Review Files Dow Jones Indexes Operations Team.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
On-line data submission training California Partnership for Achieving Student Success.
Warehouse Report. Log into EDS using your Address/User Id and Password. If you have forgotten your password, click on the Forgot Password? link.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
© 2006 Cisco Systems, Inc. All rights reserved.1 Connection 7.0 Serviceability Reports Todd Blaisdell.
NCLB Monitoring September 19, 2012 Webinar.
A State Perspective Mentoring Conference New Orleans, LA 2/28/2005 RCRAInfo Network Exchange.
Taxpaid Cigarette Wholesale Dealer’s Report (CWD).
Division of AIDS Data Interchange DAIDS Adverse Experience Reporting System (DAERS) New User Introductory Training Teleconferencing Details: US Toll Free:
SWIS Digital Inspections Project Chris Allen, Information Management Branch California Integrated Waste Management Board August 22, 2008.
Standard Unique Health Identifier for Health Care Providers April 9, th Annual HIPAA Summit Gail Kocher Highmark.
Software Configuration Management SEII-Lecture 21
Put the EZ in eZ-Audit Ti Baker Session What is eZ-Audit? eZ-Audit is a web-based application that allows you to submit your financial statements.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
Electronic claim file 21 May 2008 ADAM STAFFORD. © Lloyd’sELECTRONIC CLAIM FILE UPDATE January Aim of the Electronic Claims File Improve service.
1 Addendum FALL 2004 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. November 2004.
1 Unauthorized Trading. 2 Definition  Executing a buy or sell transaction in a customer account without their knowledge and not agreed to by the customer.
PSD2 and W3C Impact for account and payment processing.
CSRP: Post-bind Submission (PbS) On-line Submission Portal High Level Design July 2015.
IIS Project and Contact Management Systems (CMS): An Efficient Comprehensive Management Approach to IIS Recruitment, Training and EHR Integration IIS Community.
American Diploma Project Administrative Site Training.
1 © Charles Schwab & Co., Inc. All rights reserved. Member SIPC ( ). Electronic Trading The Charles Schwab Corporation (Schwab) provides services.
American Diploma Project Administrative Site Training New Jersey.
Lynne Hamp and Alicia Stansbury October 6, 2016
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall.
To the ETS – Transfer Overview Online Training Course
Vendor Webinar November 15, 2017 Annette Antos, AQI Registry Manager
Customer Contract Management Scenario Overview
Order-to-Cash (Project-Based Services) Scenario Overview
Customer Contract Management Scenario Overview
Order-to-Cash (Project-Based Services) Scenario Overview
To the ETS – Transfer Overview Online Training Course
ETS – Air Data submission Training
e-Invoicing – e-Ordering 20/11/2008
Presentation transcript:

Order Audit Trail System (OATS) OATS Basics

Topics OATS Overview, Rules and Reporting Obligations Order Reports OATS Data Processing Order Lifecycle Creation Firm Responsibilities Resources 1

OATS Overview What is OATS? Why OATS? FINRA role Firm role OATS is FINRA’s Order Audit Trail System. It is designed to capture all of the events in the lifecycle of an order from origination or receipt through execution and/or cancellation. Why OATS? OATS was developed by FINRA in response to the August 1996 settlement with the Securities and Exchange Commission (SEC). It is part of an integrated audit trail of order, trade and quote information used in FINRA’s surveillance activities. FINRA role To collect, process and provide feedback on a daily basis and to incorporate the data into the surveillance programs. Firm role To record and report data in an electronic format on a daily basis. 2

Rules FINRA Rule 7410 - Definitions FINRA Rule 7420 - Applicability FINRA Rule 7430 - Synchronization of Business Clocks FINRA Rule 7440 - Recording Order Information FINRA Rule 7450 - Order Data Transmission Requirements FINRA Rule 7460 - Violation of OATS Rules FINRA Rule 7470 - Exemption from Recording 3

Overview of OATS Current Scope: All orders: received by FINRA member firms, in NMS and OTC listed equity securities, whether received manually or electronically, are currently reportable to OATS. Proprietary orders generated in the normal course of a firm’s market making activities are not reportable to OATS. All other proprietary orders are reportable. 4

Reporting Obligations FINRA Rule 7440 Record data elements immediately following receipt or origination of an order Express all times in hours, minutes and seconds (military time) Record OATS information in electronic form Retain information 5

Reporting Obligations Third-party reporting Written Agreement must be in place Must coordinate submissions from multiple reporting parties Make clear who is responsible for repairs Supervise 6

Order Reports *Also Combined Order / Execution (COE); Events Receipt or Origination Modification Cancellation Routing to another Desk Execution Routing to another firm Report New Order (NW)*# Cancel / Replace (CR) Cancel (CL) (can be added to NW or COR) Desk (DS) (can be added to NW, OR, OE) Execution (EX)* Route (RT)# *Also Combined Order / Execution (COE); #Combined Order / Route (COR) 7

Overview of OATS Processing Member Firm Transmits Files Member Firm Assembles Records into Files Member Firm Records Order Events FINRA Generates Feedback and Analyzes Data 8

OATS Data Processing Data Receipt Individual reports are packaged into files called FOREs (File of Order Reportable Events) FOREs are transmitted on a daily basis via: FTP (File Transfer Protocol) IFT (Internet File Transfer) Web submission FORE Status (accepted / rejected) available within an hour via medium of submission or via the web FORE Status is retained online for 90 calendar days 9

OATS Data Processing Rejection Processing Records from accepted files are sent to “Processor” to run through syntax and context validations. Syntax validations - ensure records are submitted according to the OATS Technical Specifications (i.e., required fields are populated, symbols are valid etc…). Syntax rejections are available within 4 hours of submission. Context validations - ensure records are submitted in proper context. A Route Report will reject if it is not linked to an accepted New Order. Context rejections are available within 24 hours of submission. Rejections are available online for 90 calendar days 10

Order Lifecycle Within a Firm Linking Reports Within a Firm Use 3-part key: MPID (Market Participant Identifier), Order Received Date and Firm Order ID Must be the same on each order event for the reports to link Secondary reports (RT, CL, EX) are rejected if they can not match to a New Order type (NW, COR, CR) 11

OATS Data Processing Matching Data meeting validations then gets moved to “matcher” which matches Orders to Trades (Order / Trade Matching) Routes to NASDAQ and NYSE Exchanges (Exchange / Route Matching) Routes to other firms New Orders (Interfirm Route Matching) Unmatched statistics are available online for 90 calendar days Unmatched details are available online for 90 calendar days 12

Order Lifecycle Creation: Matching Interfirm Route Matching Primary matching criteria: MPID Routed Order ID Issue Symbol Date Order/Route Matching – Links Route Reports to Exchange Data Primary Matching Criteria: Exchange Participant ID Routed Order ID Date Symbol 13

Order Lifecycle Creation: Matching Order / Trade Matching - Links order executions to trades in the TRFs (Trade Reporting Facilities): NASDAQ (FINRA / NASDAQ) NYSE (FINRA / New York Stock Exchange) ADF OTC Trade Reporting Facility Market Center ID must reflect proper trade reporting facility Match on: Branch / Sequence Number Execution Timestamp Issue Symbol Firm MPID 14

Firm Responsibilities: Synchronize Business Clocks Who? - Any FINRA member firms required under FINRA and/or NASDAQ Rules to record the date and time of any market event What? - Synchronize clocks within three seconds of designated source, with to-the-second granularity Where? - National Institute of Standards and Technology Atomic Clock When? - Daily, prior to market open; check for drift throughout day and re-synchronize time as necessary How? - Internet, software, radio waves 15

Firm Responsibilities: Submission Deadlines OATS Business Day Begins after the close of the NASDAQ Stock Exchange on one market day (16:00:01 ET) Ends at the close of the NASDAQ Stock Exchange on the next market day (16:00:00 ET) OATS Reporting Day Events occurring during an OATS Business Day must be submitted to OATS by 08:00:00 ET the next calendar day or be considered late by FINRA Please note: late validation looks at the time the individual record was submitted in relation to its event timestamp. OATS does not consider in late processing if the FORE was submitted timely. 16

Firm Responsibilities: ROE Reject Repair Who? - Any Reporting Member, or member firm having data submitted on their behalf, to FINRA What? - Any records rejected by OATS for syntax, semantic or context errors Where? - https://firms.finra.org When? - On a daily basis; rejects are available within 24 hours of processing; Syntax rejections available within 4 hours How? - Through the Web Interface, FTP or IFT 17

Firm Responsibilities: Review of Web Site Monitor the OATS Web Interface on a Daily Basis: FORE Status Notification: Available within 1 hour of submission Firm Reporting Statistics: Usually available within 24 hours of processing. Rejections- Firms may view their rejections by: FORE, Summary, Rejection Type or in Group Symbol Repair Order / Trade Match Statistics and Order / Route and Interfirm matching Statistics: Usually available for firms within 72 hours View Announcements if no status available 18

Firm Responsibilities: Supervision What should be included in OATS Written Supervisory Procedures: Who is responsible for supervising OATS reporting? How will they conduct reviews for OATS reporting? When or how often will they conduct the supervisory reviews? How will they evidence their supervisory reviews in writing? Use Supervisory Logs Members should refer to NASD Notice to Members 98-65, 99-45 and 02-29 as well as the OATS Reports on Supervision for additional guidance. 19

OATS Resources The following resources are available to help members answer questions regarding OATS: www.finra.org/oats OATS Frequently Asked Questions OATS Reporting Technical Specifications OATS Subscriber Manual OATS Report Index OATS Registration Page OATS for OTC Page Report Cards OATS Helpdesk 1-800-321-6273 20