Installation Law Briefing

Slides:



Advertisements
Similar presentations
UDC Inspector Seminar 2007 Understanding Manufactured Home Installation Standards.
Advertisements

Module Floor Systems.
1 Manufactured Home Installer Course Introduction to Manufactured Housing.
Stairway Construction
7 | Means of Egress (Life Safety Code)
House Construction (Foundation Plans)
Grounding Electrodes.
Floor-Plan Dimensions and Notes
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Step-by-step guide to prevent falls
Chp12- Footings.
Parts of typical slab formwork
Residential Foundations © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture He who has not first laid his foundations may be able with.
Architectural Drawing
FOUNDATIONS. Components Footings Trench Formed Keyway Stepped Fireplace.
Manufactured Home Installer CE Course Approved by the Department of Safety & Professional Services – Approval # Presented by the Wisconsin Housing Alliance.
Copyright 2006 Assurance Check, LLC ICC Boot Camp Instructor Greg Bell Greg Bell.
What you need to about building your own home! Yes, Some day you might have to build something!!!
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
MH Installers On-Line Continuing Education. Contents of this Course Installation Standard applicable to Pre- April 1, 2007 homes Requirements for steps.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Oklahoma Uniform Building Code Commission IRC Building Subcommittee Presentation to Commission November 17, 2010.
PowerPoint Presentation
EDT 51-Floor Plan Design1 Weekend Cabin Retreat Project Basements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
Foundation Systems.
Chapter 33 Foundation Systems.
Foundation Systems.
Commercial Foundations
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Chapter 19 Floors.
Floor Systems and Foundation Support
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Chapter 18 Foundations.
Building Foundations Foundation Walls.
SITE & GRADING PLANS CHAPTER 6. PART II CHAPTER 9 FOUNDATION PLANS.
CONSTRUCTING A FIVE CABIN LATRINE
Foundation Engineering CE 483
Commercial Foundations
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
Chapter 2b Foundations Shallow & Deep Foundations.
Balloon Frame North-American invention, 1833
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Reading Structural Drawings
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Building a Deck. What must my Deck be built of??  All lumber used must be southern pine grade #2 or better  Lumber grades are bases off of the number.
Foundation Systems. Introduction u All structures require a foundation u Foundations provide a base to distribute the weight of the building to the soil.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
FRAMING SEMINARS 2012 PRESENTED BY KW ENGINEERING 1.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
Competency: Design and Draw Foundation Plans
BUILDING CONSTRUCTION
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Foundation Failure. Foundation movement may result from a wide range of factors, which can include: Shrinking or swelling of clays caused by changes in.
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
APPLICATIONS OF TECHNOLOGY
Foundation Systems.
Components of Construction
Concrete A structural material made by combining cement, sand, aggregate, and water.
Competency: Design and Draw Foundation Plans
Competency: Design and Draw Foundation Plans
Information related to Chapter 7 in the textbook
Presentation transcript:

Installation Law Briefing

Licensing Trigger is installing a home on a foundation Anchoring – no Grading – no Excavation – no Pouring basement – no The person supervising the home going on the foundation - yes

Licensing General supervision – installer does not need to be on the job site Homeowner is exempt from licensing but if other people are hired they would then need a license (no way around the law)

Application $100 license fee plus one time $10 application fee for 4 year license Take 12 hour qualifying class

Renewal Renewal requires 12 hours of continuing education over the 4 year period Also must not have been found responsible for breaking the rule or defrauding a customer

Wisconsin Installation Standard Act 45 authorized adoption of standards Manufactured Housing Code Council - recommended rule adopted draft federal rule Council is attached to the Dept of Safety & Professional Services Published in Administrative Register

SPS 321.40 – Homes built prior to April 1 Formerly Comm 27.18 Now a part of the UDC Applies to homes built before April 1, 2007

SPS 321.40 - Homes built prior to April 1 Ground sets permitted – no frost protection No footing on unprepared fill. All organic matter must be removed. Soil bearing test using pocket penetrometer Grade site to drain water away for minimum of 5 ft from home A footing for every pier, nominal 16” by 16” Consult the manufacturer, engineer or architect if soil is less than 2000 psi

SPS 321.40 Footings one 4 by 16 by 16 solid blocks or two 4 by 8 by 16 solid blocks. 16 by 16 ABS pad rated at not less than 6000 lbs 18 inch diameter hole bored below the frost line or to unfractured bedrock and filled with poured concrete Other materials or systems approved by Department of Safety & Professional Service

SPS 321.40 Piers - Homes built prior to April 1 Concrete blocks, manufactured steel stands or manufactured concrete stands Single stack piers limited to 36 inches Single stack piers loads limited to 8,000 lbs 36 to 80 inch piers – double blocked (layered in opposing layers) 80 inch or more – double blocked laid in concrete mortar, cores filled with mortar and ½ inch steel reinforcing rod

SPS 321.40 Concrete Blocks 2 core design, construction grade 8x8x16 Cores placed with cores open vertically Block nearest main frame shall be perpendicular to the linear direction of frame No block may contact the frame

SPS 321.40 – Pier Spacing No more than 7 feet on center No more than 3 feet from exterior side of each end wall Can be varied to follow manufacturer tables Piers under clear-span openings of 4 feet or more in mating walls Piers must be plumb and centered under point of support

SPS 321.40 - Caps Solid concrete block or solid wood block having nominal thickness of at least 2 inches Cap must be same width and length as top of pier No more than 2 pieces – 2 piece caps positioned with joint perpendicular to frame if used

SPS 321.40 - Shims Where used, driven from opposing sides and be no less than 4” by 8” Wood caps and shims at least equal to #2 spruce pine fir with min bending stress rating of 1200 psi. All wood caps must be of same species of wood. All shims must be of same species of wood.

SPS 321.40 – Height limits Combination of nominal 2 inch solid concrete block or wood cap plus shims must not exceed 3 ½ inches Minimum clearance under home of 12 inches between lowest point of main frame in area of utility connections. Min clearance of 12 inches for 75% of home. Remainder may be less than 12 inches but cannot touch ground

Federal Installation Standard Applies to homes built on or after April 1 Modified by Department of Department of Safety & Professional Service

The Standards 3280 – HUD Construction Standards for the home 3285 – HUD Model Installation Standards The following must be AT LEAST AS STRINGENT as the federal model State Standards Manufacturer Manuals

Understanding Part 3285 Code is available from the front page of the Alliance website It includes “wisconsin-isms”

Application These standards apply to HUD Code manufactured Homes not modulars.

Major Differences Must be a frost protected foundation system Monolithic Slab (not runners) Cylindrical Concrete Footings bored to 48" Min. Depth Insulated foundation system Drainage 10 away verses 5 feet No Ground Sets! All of home must be no less than 12” above grade

Major Differences Concrete blocks must meet ASTM C90 Piers may be 10 ft apart verses 7 ft Double blocking required above 36” and all corner blocks Piers no more than 2 ft from ends verses 3 ft from ends More specifics on permitted woods

“Wisconsin-isms” Entire state is 48” frost depth Anchors to be driven to full depth but need not be more than 30” Fire separation must also conform to SPS 326

Things to Watch! Permits required Inspections required Setbacks Fire protection Steps & decks Enforcement may not be uniform for awhile but that doesn’t mean it’s not coming

AC Inspections Alternative Construction (AC) Inspections WILL NOT be part of Department of Safety & Professional Service’s UDC Inspector Program! ( a "HUDism" per Leroy Stublaski) Remember to reserve "separate" inspection fees for HUD Homes requiring AC inspection(s). Contact "Home Manufacturer" for approved inspector contacts.