Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.

Slides:



Advertisements
Similar presentations
Preparing the Big Bite Hadron Detector Package Gordon Lott, Virginia Tech Mentor: Douglas Higinbotham All the signals from the PMTs are sent via cable.
Advertisements

Intro to Digital Logic. What does Digital mean? A method of storing, processing and transmitting information through the use of distinct electronic or.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
Argonne Laser Test Stand and Fermilab Test Beam Facility Karen Byrum 8 March, 2007 Status of Argonne Laser Teststand (Joint ANL – UC program) Some first.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
1st of year Checkout 1.Powering up detector(s) 1 st in the DARK Ramping up voltages slowly in 50 v steps 2. Look for signals 3. Check rates 4. Light leak.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Laboratory 5: Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report / Presentation Closing.
Multichannel Analyzers A multichannel pulse-height analyzer (MCA) consists of an ADC, a histogramming memory, and a visual display of the histogram recorded.
Forward Detectors and Measurement of Proton-Antiproton Collision Rates by Zachary Einzig, Mentor Michele Gallinaro INTRODUCTION THE DETECTORS EXPERIMENTAL.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
 VIDEO CAPTURE USING FIREWIRE  VIDEO CAPTURE USING A VIDEO CARD  CAPTURING VIDEO CONNECTING EQUIPMENT AND CAPTURING DIGITAL VIDEO.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
S-2S memo WC Toshiyuki Gogami 24Apr2015.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
Calibration instructions for Quarknet Cosmic-Ray Detector How to Plateau the Counters A friendly guide for students and teachers Edited by Jeremy Paschke,
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Nuclear Instrumentation. CEU 2014 Waikoloa Resort Hawaii.
CALO Meeting–September 2 nd 2015 Calorimeter Upgrade Electronics: June 2015 Test Beam E. Picatoste Universitat de Barcelona, Institut de Ciències del Cosmos.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
Lorenzo Uplegger Scientific Computing Division PREP Manager PREP Modernization Plan A vision for bringing the equipment pool into the FPGA era.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
 A) Pulse Height Spectroscopy  Identify the equipment such as detector, electronics modules and NIM.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
Spanggaard BE-BI-EA(1)EA Lectures February, 2016 Introduction to Beam Instrumentation (in the Experimental Areas of the SPS, the PS and the AD)  EA -
Calibration Instructions for Quarknet Cosmic Ray Detector
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
2011/ 07/06 Jacqueline Yan IPBSM
Luminosity Monitor Status
EVLA MONITOR & CONTROL CDR
Presentation transcript:

Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand how and why the detectors are arranged as they are: – Upstream Cerenkov Detector – Upstream MT6SC1 Scintillator Counter – Upstream Time-of-Flight 1 Counter – Upstream T1017 Bubble Chamber Test Experiment (in pixel telescope) – Downstream T979 Timing Test Experiment (on motion table) – Downstream MWPC event chamber – Downstream MWPC Accelerator Division beam chamber – Downstream Time-of-Flight 2 counter – Downstream Lead Glass calorimeter The goal is to time in most of these signals into the Data Acquisition system in the main electronics room. Take your time and be safe. Use the ladders and stairs to make connections. Make sure no voltages are on when you make connections.

Conducting a Test Beam Experiment – Page 2 In the MT6 enclosure, connect signal cables from the four TOF-2 phototubes into one of the cable patch panels. Also connect high voltage cables from TOF-2. (The TOF-1 counter has already been setup for you.) Connect the lead glass calorimeter signal and HV to one of the patch panels. Plug the two ribbon cables into two electronic cards of the MWPC – your choice. Note the orientation and position of the cables. Inside the electronics room, find the corresponding HV and signal cables. Connect the HV cables to one (or more) of the Berkeley Zener diode distribution boxes (called a ‘cow’). Before you do this, make sure the supply voltage is off. Set the supply voltage to 2100 V and put the pins into the 600 V subtraction point. Turn on the supply voltage. All HV distribution out the back of the cow will now be at 1500 V.

Conducting a Test Beam Experiment – Page 3 Now you will be hooking up the signals and trying to read them out. At any time during this process, if the spokesman feels that the detectors need to be checked with a radioactive source, then you can ask to get one from the lock box. See if you can see background signals from the TOF-2 counters, using an oscilloscope. If not, use the pins to raise the voltage in 100 V steps until you do. See if you can see background signals from the lead glass calorimeter. Raise the voltage if needed. Plug the ribbon cables from the MWPC into a Lecroy 4616 ECL-NIM converter. Look at the NIM signals. Turn on the MWPC high voltage supply. Monitor the voltage and slowly raise the voltage to 2000V. Check to see if there is any current. There should be less than 100 nanoamps. Very slowly raise voltage to 2600V, keeping a close eye on the current. See if you can see any signals on the chamber now.

Conducting a Test Beam Experiment – Page 4 At some time during the morning the spokesman should call the Main Control Room (x3721) for a search and secure of the MTest beamline. When the crew comes, everyone must be out of the enclosure. Ask for 12 GeV beam from the MCR. Check the signals again with beam. Go to lunch at the appropriate time. Be sure to call MCR and ask beam to be shut off. Back from lunch. Ask for beam again. With an oscilloscope, look at the signal cables from TOF-2, the Lead Glass Calorimeter and the Cerenkov, and see if you can see the beam. Create a gate using the coincidence of MT6SC1 and the beam spill signal. Check the timing of this gate compared to the TOF-1, TOF-2, Lead Glass and Cerenkov signals. Adjust the delays accordingly with delay cables so that the TOF signals come after the start of the trigger, and that the Cerenkov and Lead Glass signals fit within the gate.

Conducting a Test Beam Experiment – Page 5 Plug the Lead Glass and Cerenkov signals into the CAMAC Lecroy 2249a Analog to Digital converter (ADC). Plug the eight TOF signals into the CAMAC Philips 7186 Time to Digital Converter (TDC). Plug the MWPC ribbon cables into the CAMAC Lecroy 4448 coincidence register. Plug copies of the trigger gate into the appropriate gate inputs on the CAMAC DAQ modules. Go to the EDIT user area on the FTBF DAQ computer (~mtbf_user/users/EDIT) Run the DAQ (./daq) Analyze the data