ULTRASONIC TRANSMITTER Amanda Helberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson.

Slides:



Advertisements
Similar presentations
Experimental User Interfaces ME-E4200 Lecture X - Project January 2015.
Advertisements

Arduino Guitar Pedal Ian Andal IME 458 Dr. Pan.
Resistor Circuit Symbol
Project Management Techniques.
Four Channel Ultrasonic Receiver Presented by: Chen Jia Team members: Brian Markus Danny Viselman.
Problem 17: “Greedy Shapers” T3 T4 CPU2 T1 T2 CPU1 S Stream S1: P = 100 J = 1000 D = 1 Stream S2: P = 10 J = 10 D = 1 Stream S3: P = 10 J = 0 D = 0 Stream.
Distributed Voltage Controlled Oscillator Team Members: Dane StiversTodd Beyer Tim MacShaneMonica Studnicki Advisor: Dr. Prasad N. Shastry Funded By: Electrical.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Project Management Summer Meeting Students’ Educational Needs Learning Meeting the Community Organizations’ Needs Progress Purdue University Greater.
Arduino Week 3 Lab ECE 1020 Prof. Ahmadi. Objective Data acquisition (DAQ) is the process of measuring an electrical or physical phenomenon such as voltage,
ULTRASONIC TRANSMITTER Amanda Hellberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson TEAM B-CDR.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Critical Design Review Wind Turbine with Gearbox
General Licensing Class G7A – G7C Practical Circuits Your organization and dates here.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
1 Development of a Programmable Ultrasonic Receiver Chris Allen
R.O.M. System Team: RISC Takers Team Members: Paul Banks, Yorick Robinson, Evan Tu, & Hans Weggeman Louisiana State University – Senior Design October.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.
Project Status Report Presenter Name Presentation Date.
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
Resistance to Frequency Converter Amol Mupid Andrew Ricketts.
Project battLEDship MELODY KIDD KELLY MCFARLANE SCOTT MATSUO RAPHAEL RAMOS TEAM GAY AVENUE.
Senior Design Team Team: Ryan Williams (EE) Jonathan Wolff (EE) Damon Soto (EE) Jason Meyer (EE) Advisor: Helena Silva (ECE)
Design of Digital-to-Analog Converter Qin Chen Yong Wang Dept. of Electrical Engineering Mar. 14th, 2006 EE597G Presentation:
FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
Questions on IFPAC_SCHEMATIC. Signal Chain Preamplifier Compensation Capacitor should go to –Vs, not GND Where is resistor For compensation Network? Does.
Arduino Uno Team 9: Adam Desouky & Keith Kaiser. Arduino Hardware Digital Pins Analog Pins Power Connect to Computer.
High-Performance FPGA-Controlled Amplifier Phase IV May April 27 th, 2005.
Work Breakdown Schedule. Components Research and find all components  Pressure Sensor  Micro controller  LED Display  Operational Amplifier Order.
Incoming Power Grid Monitor TEAM #3: JAMES MCCORMICK, ZHIHOUG QIAN, JACOB JEBB, VICTOR EZENWOKO, ALEX LANGE FACILITATOR: DR. ASLAM SPONSOR: GREAT LAKES.
Meteor Receiver Andrew Thoni Charlie Hunter Greg Watkins Nick Nicholson Will Marshall.
(Project) RISK MANAGEMENT PROCESS SEPTEMBER 5, 2008.
Milestones  Receiving all parts for the design(Feb 4th)  Microcontroller, LCD, and ADC work (March 26th)  Coding (April 10th)  Combined interface.
Aircraft Carrier Draft Measurement
Ultrasonic InSAR System Brandon Ravenscroft 12/04/2015.
Plasma Sense Amplifier
Preliminary Design Review Noise Cancelation Device Peter Gordon, Zach Rohde, Aman Sanghera, Andrew Taylor, and Tanner Brunhoeber.
PROJECT BATTLEDSHIP TEAM GAY AVENUE MELODY KIDD (FALL TEAM LEADER) SCOTT MATSUO KELLY MCFARLANE (WEB TRAINEE) RAPHAEL RAMOS.
Group: CCM Project 2.5. EMERSON Emerson is a diversified global manufacturing company.  Provides innovative solutions to customers in the following areas:
Milestones  Receiving all parts for the design(Feb 4th)  Microcontroller, LCD, and ADC work (March 26th)  Coding (April 10th)  Combined interface.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Nathan Gibbs – EE Adnan Kapadia.
Matthew Lurie & Kyle Spesard Team 18 TA: Lydia Majure.
Arduino Week 3 Lab ECE 1020 Prof. Ahmadi. Objective Data acquisition (DAQ) is the process of measuring an electrical or physical phenomenon such as voltage,
Static Relays contains electronic circuitry (Diodes, transistors, zener diodes, thyristors,logic gates …etc) ICs are widely being used in place of transistors.
ARDUINO UNO The Arduino uno is a microcontroller board based on the ATmega328. It has 14 digital Input / Output pins (of which 6 can be used as PWM outputs),
Quiz: Determining a SAR ADC’s Linear Range when using Instrumentation Amplifiers TIPL 4102 TI Precision Labs – ADC Hello, and welcome to the TI Precision.
CSU-1 Project Updates Mechanical:
CSU-Pueblo Team: Paul Rael, Shae Anderson, Atilla Turkoz, Yudhi Paudel
Optical Gigabit Ethernet
“Plan the work. Work the plan.” ~ Old Saying
WINDMILL (NO GEARBOX): CDR
WELCOME.
Ultrasonic Transmitter
Programmable Ultrasonic Transmitter
General Licensing Class
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Project GabE ECE 135 – Spring 2005
Team 3 Piano Glove PCB Design Narrative Carolyn McMican Daniel Stein
Project Sublimity Audio Stereo Class-D Audio Amplifier
Analysis of RF Circuit Degradation to Ensure Circuit Security
TUTORIAL An inverting amplifier circuit using Op-amp 741 IC, a feedback resistor, Rf = 95 kΩ and input resistance, Rin is used in a feedback oscillator.
Lancaster ISD 2015 Bond Program Update
Project Management.
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Project GabE ECE 135 – Spring 2005 Week 9
Presentation transcript:

ULTRASONIC TRANSMITTER Amanda Helberg, Brandon Ravenscroft, Jonathan Owen, and Kai Gustafson

LEVEL 0: BEACON SYSTEM Arduino Uno Programmable Oscillator Buffer Matching Network Transducer

LEVEL 0: RADAR SYSTEM Programmable Amplifier Buffer Amplifier Impedance Matching Network Transducer On-board RCVR Arduino DUE DAC ADC Test Point Echo from chirp Output Chirp Test Point

SCHEMATIC: RADAR SYSTEM

16-ELEMENT ULTRASONIC TRANSMITTER

HOW TO ACCOMPLISH THIS

PROJECT MANAGEMENT

PROGRESS

RISKS Input Power to Arduino Due Risk: The Arduino Due can only have an input of 3.3 V unlike the Arduino Uno having 5 V.  Mitigation: Zener diode limiter (clamping circuit.) Collaboration with Team Receiver Risk: Improper co-location with Receiver Team.  Mitigation: Keep in close contact with Receiver team upon design of final board. Scheduling Risk: Not having the code and/or board complete by deadlines.  Mitigation: Sticking to Gantt chart schedule to ensure project components are completed on time. Risk: Manufacturing company lead times being inaccurate.  Mitigation: Board design submitted two weeks early in event of delay. Test Points Risk: Having a completed faulty board and no way to connect to certain areas to test.  Mitigation: Insert appropriate test points in design.

QUESTIONS?

BACK UP SLIDE-ALLOCATIONS