Using functional analysis to determine the requirements for changes to critical systems: Railway level crossing case study Joe Silmon, Clive Roberts Centre.

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

Road Safety Considerations around a mine site By Richard Jois Transport Mining and Safety Leader.
How to stay safe on the road
1/47 Better infrastructure for motorcyclists Roadside barrier campaign Maurice Anderson BVDM Germany Member of the FEMA Board of Directors.
Traffic Safety Series How to Change a Tire Oklahoma Department of Corrections.
No pain, no gain? Preventing cycling injuries in a world of expanding waist-lines. Rob Benington Injury Prevention Manager, Avonsafe Co-ordinator NHS Bristol.
Functional Check Flights Presented by Wally Istchenko Chief Flight Test Transport Canada Functional Check Flight Symposium February 8-9, 2011 Vancouver,
Human Reliability Analysis: Accounting for Human Error on Light Rail Transportation Systems SYSM 6309 Advanced Requirements Engineering By: Michael Murphy.
Brief Overview of New ALCAM
Beckwithshaw CP School Safety and Safeguarding Road Safety (with an emphasis on pedestrian safety around our school) Parent Presentation and Discussion.
DRIVING TOO FAST FOR CONDITIONS A Collision Countermeasures Presentation.
EX-1 Intersections & Interchanges Improved Traffic Signal Control Ramp metering Intersection Collision Avoidance Systems Automated Enforcement.
Topic 4 - Risk Assessment Textbook pages 72–77. Learning outcomes By the end of the topic learners will have: Greater familiarity with risk assessment.
Railway Safety Plan and Its Status in Korea
Hazard and Incident Warning « Majority of events occurring on the road represent a danger for road users » By transmitting road events and road status.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Moving, Positioning and Falls Management of People The impact of legislation on the moving and positioning of people.
Railtrack PLC Safety & Standards Directorate Railway Safety: Analysing Risks and Causes Sally Brearley Railtrack Safety and Standards Directorate 8 December.
Human factor, road-rail safety policies, available technologies at level crossing. Towards a model to evaluate LCs risk. Emilio Cosciotti Massimo Costa.
OHS Risk Management - Overview Risk management is a system that allows workplaces to identify OHS issues and to methodically control them by the best means.
TRACECA PROJECT EVALUATION. LEVEL CROSSINGS ON GEORGIAN RAILWAY TRACECA ROUTE AUTOMATION OF 39 LEVEL CROSSINGS ON THE MAIN LINE FROM AZERBADJAN BORDER.
Consultation is the process of sharing of relevant information about occupational health, safety and welfare with staff. It gives staff the opportunity.
Athens Avenue / UPRR Grade Separation Feasibility Study Thunder Valley Casino.
OH&S Plant Regulations make Good Business Sense Robert Enchelmaier Capability By Design Peter Kohler Robert Enchelmaier.
Preventing Slips & Trips at Work
Software availability –the probability that a program is operating according to requirements at a given point in time. Availability = (MTTF/MTBF) x 100.
Around the Globe Fall 2015.
Damage Mitigation Braking System
Health and Safety Executive Shattered Lives Campaign 2008 Building and Plant Maintenance.
1 Review and Assessment of the Korea Rail ’ s Safety Performance using Risk Assessment Models International Railway Safety Conference 2009, Sweden Chan-Woo.
A European Commission funded Regional Programme since Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
Walking between home and school. Leaving home in the morning on your walk to school.
Mind the Gap – Human Factors and the Platform Train Interface
Transport Rail Safety & the Railway Safety Directive Frank Jost Single European Rail Area EU Commission 1.
Using functional analysis to determine the requirements for changes to critical systems: Railway level crossing case study Joe Silmon, Clive Roberts Centre.
Learning from incidents: Ufton LC Near Miss ES LXA PICOP.
Health and Safety Refresher Training
3D LEISURE - Health & Safety Refresher Training Manual.
Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and The principles behind.
1 Chapter 1 You Are the Driver. 2 Chapter 1 Overview Chapter 1 introduces you to the highway transportation system and the driving task. The chapter also.
Health & Safety in the Construction Industry
V9 Vehicle Manoeuvering. Fleet Operator Recognition Scheme (FORS) FORS is important to our company because.
D5 Health and safety. Fleet Operator Recognition Scheme (FORS) FORS is important to our company because.
HIGH SPEED RAIL ASSESSMENT NORGE
Traffic Management Rok Safety Seminar The statistics Why do accidents occur What is workplace transport The problems Possible solutions Worked examples.
Chris Feltham Head of Road Safety Engineering London Road Safety Unit Transport for London Road Safety Audit and Pedestrian Guardrailings.
השוואת תנאי עבודת עתקים ודרישות בטיחות נעשתה בהתאם לדו"ח מבקר 3/13. ISRAEL RAIL COMPANY General Overview Udi Kaplansky (MSc. Safety Engineering) VP Safety,
Work Place Transport. Members of the BPF Health & Safety Committee.
Warehousing and Storage Principles Session 9 – It’s a Risky Business Day 5 / AM.
1 Address: UIC Safety Database (SDB) System and Results.
HAZOP of a Level Crossing 陶维杰 s Content 1 、 What’s a level crossing 2 、 What’s HAZOP 3 、 HAZOP of a level crossing.
Level Crossing Safety Management Information System
Insert the title of your presentation here
Joint Police & Streets Committee
Safety in Product Design, Manufacture and Use.
Presented by Kevin Williams
Guide for the application of the CSM design targets (CSM-DT)
A Risk-based Approach to Training Paul Cheeseman & Kerry MacDonald
Rob Benington Injury Prevention Manager, Avonsafe Co-ordinator
Please click screen ONCE to begin presentation.
Risk Management Definition
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Rail Safety Summit 1st November 2018 Ian Prosser CBE
Working at Height.
How to Safely Approach and Pass Through an Intersection
Traffic Management Rok Safety Seminar 2007.
Risk Management Student Powerpoint
Likelihood 4 Allow 8 Mitigate 12 Avoid 16 3 Accept Severity
Presentation transcript:

Using functional analysis to determine the requirements for changes to critical systems: Railway level crossing case study Joe Silmon, Clive Roberts Centre for Railway Research and Education, Gisbert Kapp Building, University of Birmingham B15 2TT, UK Reliability Engineering and System Safety 95 (2010)

Level crossings -> Components of railway networks with the greatest risk of collusion and possibly derailment. Analysis of functional interactions will inform the choices of asset owners wishing to upgrade their existing systems. OverviewOverview

Level crossing -> a weak point in terms of railway safety The onus has always been on the railway operator to reduce the risk of collusion at level crossings. In this paper: The factors affecting risk at level crossings are reviewed. The case of the automatic half-barrier level crossing (AHB) is examined in detail. A hypothetical obstacle detection system is introduced. How functional analysis can be used to better understand the operation of the AHB and determine the best points to improve the system? A case study -> To provide an example of how functional analysis creates a framework for through examination of a system. The Objective of the Research

Hazards: Something which can cause harm. Risk: The likelihood that a hazard will cause harm, together with a measure of the severity of the harm caused. The hazards presented by a level crossing are: Collision between trains and road vehicles Collision between trains and pedestrians Collision between road vehicles and level crossing equipment Slips, trips, and falls by pedestrians Collision between pedestrians and level crossing equipment. Review of hazards, risk and mitigation at level crossings

According to the British Safety Risk Model, level crossings account for 11.8 “fatalities and weighted injuries (FWI)” per year, comprising 8.4% of the total system risk for the railway network....Review of hazards, risk and mitigation at level crossings

The figure shows the sources of risk for train accidents at level crossings, i.e. collusions between road and rail vehicles....Review of hazards, risk and mitigation at level crossings

AHB was introduced accross Europe in the 1950s and the 1960s. It was designed to improve the flow of road traffic by minimising the time the road is closed, and to be more economical by dispensing with manually operated crossing gates. Description of the system: Operation is triggered by the approach of a train. A warning sequence starts and is soon followed by the lowering of barriers which extend accross half of the carriageway only, allowing vehicles already on the crossing to exit. Case study: The automatic half-barrier level crossing

AHB history: In Great Britain, the AHB crossing was installed from the mid 1960s. Initially, the time between strike-in and the arrival of a train was designed to be 24 s. Case study: The automatic half-barrier level crossing

The recommendations were carried out, and signage has been improved continuously over the past 35 years. Case study: The automatic half-barrier level crossing

It is desirable to have a means of instructing trains to stop when they are approaching a level crossing which is obstructed. -> The introduction of extra equipment for this function will have a negative impact on the overall reliability of the level crossing system, if the system is configured to depend on the new equipment -> Because no equipment can be 100% reliable. However, the system will also have a positive effect on safety, because it will reduce the chances of a collision occuring when a road vehicle becomes struct on the crossing. -> The system is assumed to be intelligent enough to tell the difference between a car moving slowly and one that is stationary. -> There are no circumstances under which a car should stop on a level crossing, any stationary vehicle on the crossing can be assumed to be in trouble. This system is called the future obstacle detection system (FODS). The future obstacle detection system

The functional modelling of the level crossing begins by defining its function as a whole. Its function: To manage the road-rail interface in a safe and expedient manner. Then, the functional model is refined by decomposing this function into smaller functions which interact together to give the desired effect. Functional decomposition

...Functional decomposition