Predict Remote Drill Rig Easy to handle Light weight Cost effective Predict Support Systems Pty Workshop No 10 Boch str Rustenburg Tel : 014 596 5304 Fax:

Slides:



Advertisements
Similar presentations
GUIDELINES FOR THE PACKAGING AND TRANSPORTATION OF INSERTS & SUPPLEMENTS The printer must ensure that all inserts are free from set-off and that the ink.
Advertisements

Sisonke Hydraulics & Engineering (Pty) Ltd is an accredited Parker repair centre and Distributor.
High School Part 1 /2 by SSL Technologies Physics Ex-44 Click PART-2 /2 THE INCLINED-PLANE The inclined-plane is a simple machine that multiplies the.
COMPANY PROFILE Mr. Emil Wentzel CEO Tel: (011)
L2B Hall-MEWP Training (November 12) Stage Crew L2 Hall-MEWP Training To enable: Use of Hall Genie AWP-36.
Mechanical Workshop Module 6
200 pt 300 pt 400 pt 500 pt 100 pt 200 pt 300 pt 400 pt 500 pt 100 pt 200pt 300 pt 400 pt 500 pt 100 pt 200 pt 300 pt 400 pt 500 pt 100 pt 200 pt 300 pt.
COPYRIGHT SILCA SpA 2005 Silca is a member of the Kaba Group.
COPYRIGHT SILCA SpA 2006 LeonardoSilca S.p.A. Leonardo.
Erected and ready for use within 5 minutes of arriving on site Simply wind to a maximum working height of 6.5m (21ft) No specific training qualifications.
MultiRail Horizontal Anchorage Device
© 2004 Incline Conveyor Operations (ICO). All Rights Reserved. Confidential and Proprietary. Incline Conveyor Operations – Conveyor Safety Specialists.
In the Cement Industry. Circle of Refractory Maintenance.
Using Simple Machines to do Work More Easy Devices that allow us to perform the same amount of work more easily.
Maintenance and Reliability Ross L. Fink. Maintenance  All activities involved in keeping a system’s equipment in working order.
UTM LIFTER PROJECT.
FCC layout: lifts & cranes Ingo Rühl / EN-HE FCC Infrastructure & Operation Meeting 17 December 2014.
Haico for Horses HAICO TREADMILL. Haico for Horses Haico Treadmill selection consists of three standard models: Haico Treadmill 3000 Haico Treadmill 4000.
Drilling Rig URB-10-2SH property of. 2 “INNCOR” Company Presents multipurpose drilling rig “Buran” URB-10-2SH, for the first time designed by the method.
Voice of the Engineer (VOE)
Vibration Technical Bulletin. Table of Contents Appearance Inspector Stamp.
Outcome 5 Safety requirements for using access equipment Unit 201: Health and safety in building services engineering.
Auridos Komercijawww.forge.lt1 Company presentation 2012 AURIDOS KOMERCIJA.
Advanced Design Applications Power and Energy © 2014 International Technology and Engineering Educators Association STEM  Center for Teaching and Learning™
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Fraunhofer Advisor: Dr. Michael Keefe Innovative Lifting.
BIKE TOOLS NEWS FOR YEAR REPAIR BIKE STAND  For home and professional use,  easy and quick mounting system,  rubber protected jaws to prevent.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Measurement Systems Analysis Introduce Measurement Systems Assess Measurement Systems Performance Understand Measurement System Variation.
IPC Vibration Design The design of printed boards that will be subjected to vibration while in service requires that special consideration be.
CO2 Car Specifications Rules and Regulations
Section 2 Work and Machines. Machines Do Work A machine is a device that changes a force. Machines make work easier to do. They change the size of a force.
New sliding gates gearmotor C721 (24 Vdc). Summary  Why a new 24Vdc operator?  USPs  Technical specifications.
Vertical XY Camera Rig P Problem The Metropolitan needs to create high resolution prints of Croome Court.
Presentation GEM Company 3000 sqmts covered area 25 years experience in lift sector Production Capacity > gearboxes/year more than 85% for.
Mechanization of Parts Handling. Parts Feeding Fabricated parts must be transported, selected, oriented properly, and positioned for assembly.
Strategic placement of compressors for future mine developments HG Brand August 2012.
Presentation of Drilling Rigs GBU-5M “Wasp” and GBU-7M “Colibri”
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
POWERFUL SOLUTIONS. GLOBAL FORCE. TQ700 Lightweight Torque Wrench Pump May, 2013.
E6xPage 1 Finn-Power E6x The perfect Machine tool for your first FINN-POWER.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
SpeedROC D30 Miguel Pereira, Product Manager
Sanitary Engineering Lecture 10 Revision
20/11/161 NEW E5 FINN-POWER e-technology - 14 years of excellence.
Concrete Block Making Machine The Concrete Block Making Machine is ideal for any construction site. They are easy to handle, install and also economical.This.
6: Lifting and Moving Patients
Session 2: Saws, Part 2; Other Power Tools
TARP (TSM) Introduction at Joel Mine
Falco AF 3009 ENG.
Clarkson University Electric Knights E54
A = Electrical Engine B = Electricity Generator C = Flywheel
MLM Software Development Company MLM Software Company MLM Software
FINN-POWER e-technology - 14 years of excellence
Garmin Software Update Support Call for
Garmin cycling devices map support service Call for
Leader in testing and maintenance of reserve power
ايمني لاستيكها و تايرهاي خودرو
Guide to Selling: Vertical Grinder
R&D Department.
TASKI swingo 4000 & 5000 swingo 4000 swingo 5000
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
The Low-Down on Ladder Safety:
FS ” Maximum Blade Capacity 9 HP Honda engine Weight – 141Lbs
Monkey Tower Scaffolding in 5 minutes
Enrobing+ wheelmachine 50Kg
LIFT,ESCALATOR AND MOVING WALKS
EURO FAN – 69 inch November 2014.
If you are looking for 24/7 technical support for your device, so that it could be secure from all types of malwares or any damage, etc. You are all round.
Presentation transcript:

Predict Remote Drill Rig Easy to handle Light weight Cost effective Predict Support Systems Pty Workshop No 10 Boch str Rustenburg Tel : Fax: & E mail :

Predict rig - Height Specifications Rig sizeClamping ext range Min stoping width Max stoping width 750mm1.250m m 1m1.90m1.20m1.90m 1.3m2.50m1.50m2.50m 1.7m3.30m2.0m3.30m 2.2m4.30m2.10m4.30m

Predict rig - Weight Specifications Rig sizeMass excl drill incl control kg Typical mass incl std drill kg Mass of controls 750mm39 kg62 kg6.5 kg 1m42 kg65 kg6.5 kg 1.3m49 kg72 kg6.5 kg 1.7m52 kg75 kg6.5 kg 2.20m58 kg81 kg6.5 kg

Predict rig – specifications Rig sizeDrill moveWheelsSafety slingCollaring device Drill typeLifting Cylinder force at 400kpa Clamping cylinder force at 400kpa 750mmYes8inch1m - 2mOptionalAny178kg or 125kg 125 kg 1mYes8inch1m - 2mOptionalAny178kg or 125kg 125kg 1.3Yes8 inch / 10 inch 1m -2mOptionalAny178kg or 125kg 125kg 1.7Yes 10 inch1m - 2mOptionalAny178kg or 125kg 125kg 2.2Yes 10 inch1m - 3moptionalAny178kg or 125kg 125kg

Predict Rig Safety Aspects Built-in drill rig jack Remote drilling operation as far as 5 m away No vibration of machine on operator Operator’s remote controls under supported roof Light weight – easy to move around

Predict Drill Rigs – “the solution” One man operation Accurate drilling due to proper clamping of machine Can use any drill type i.e.: Board range or Compair Light weight Easy to handle with wheels on unit Reliable unit Cost effective Low repair cost Same rig can be used in areas from 900mm higher than the rig size, no larger rigs necessary

Training Technical demonstrators to be involved during the roll faze. Experienced sales team will oversee the roll out process. Instructor will made available.

Current users of Predict Rigs Anglo Platinum RPM – Paardekraal, Townlands and Union Mine Xstrata Platinum and Chrome International Ferro Metals Lonmin – Saffy, Hossy and Newman Shafts Aquarius Kroondal Platinum RPM Union Section New Trial : Impala Platinum

Repair and Maintenance We have a workshop situated in Rustenburg. Rigs can be collected daily to be repaired Turn around time is 3 working days maximum after official purchase order is received Repair cost to be kept to a minimum – depending on the severity of any structural damage Repairs done on following bases : – strip and quote basis – fixed repair cost. Technical demonstrators to assist with training. Service exchange rigs available for emergency breakdowns