CLWC Water System Improvement Project Overview. Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well.

Slides:



Advertisements
Similar presentations
Big Lagoon Small Lagoon 20,000 Gal Tank Flood lane Main Drain Separator Liquids form Solids Solid holding area Pump Station Licorice Lane Farms Heike Fry.
Advertisements

Duration CONSTRUCTION Opening Date EQUIP INSTALL. & TEST Incheon International Airport Control Tower Outcome Progress DESIGN & AWARD : AOR 36 MONTHS.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Capital Improvement Program (CIP) Overview Jim Herberg, P.E., BCEE June 14, 2012.
City of Black Hawk Water HammerSeptember 2002 Arber Water Hammer Travis Meyer, P.E. Richard P. Arber Associates.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
USACE TEAM APG APG/C4ISR BRAC UPDATE SAME-Regional Event LTC Thomas Tickner CPT BJ Kraemer.
FoamPro 1600 Series Fully automatic Class A foam ONLY
CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
Wind-to-Hydrogen in the Northern Great Plains Energy & Environmental Research Center University of North Dakota Basin Electric Power Cooperative.
Loudoun Water’s Potomac Water Supply Program RWI/PRWPS- Request for Qualifications Pre-submittal Conference– July 9, 2013.
R. S. Govindaraju, J. E. Alleman, T. J. Cooper, T. P. Chan, V. Jain School of Civil Engineering Purdue University (SPR-2455, SPR-2456, SPR-2487) I-70 Greenfield.
Phase Difference = Phase Difference = 0.05.
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
Sea Fukushima Dai-Ichi: Status before the Earthquake Units 1, 2, and 3 operate at full power. Steam produced by water boiling in the reactor vessel flows.
Herriman City Municipal Water PowerPoint Presentation March 10, 2011.
DELIVERY PROGRAMME Ian Hardwick Head of Engineering - Gallagher 28th January 2015.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
1 NSTAR TRANSMISSION RELIABILITY PROJECT ENVIRONMENTAL BUSINESS COUNCIL UPDATE APRIL 21, 2005.
Progress Review On Ongoing Construction Projects aimed at Budget Professor Ranjith Premalal De Silva Vice Chancellor Uva Wellassa University, Sri.
Water Chlorinator ENGR 493, Fall 2012 David Blyton, Kelly Helfrich, Brittany LaBadie, Marc Lubenetski.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
MIDDLE PLANTATION KEY WASTEWATER COLLECTION AND TRANSMISSION SYSTEM Village of Islands, Islamorada Residential Grinder Pump Program Pre-Construction Meeting.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
Webster Water System Board of Selectmen Public Hearing on Water Quality October 13, 2015 Doran Crouse, Webster Water Department Scott Charpentier, P.E.,
Air Quality Status Report October Current Attainment Status: Seminole State College, Seminole Co running average = 65 (increase of 1 point)
TOWN OF EDENTON NEW POLICE DEPARTMENT.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
WATER SYSTEM WORKSHOP February 27, 2012
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Set datePage 1Copyright © Infineon Technologies All rights reserved. ENT13: Serial# ; Year: Jul 1993.
Jan 2016 Solar Lunar Data.
IT Strategy Roadmap Template
Timeline Roadmap Template
Perris Water Filtration Plant Membrane Upgrade – Phase I
Construction Report March 25, 2010.
High Street Streetscape Improvement Project
May Jun Jul Aug Sep Oct Nov Dec Today Material Available
May Jun Jul Aug Sep Oct Nov Dec Material Available
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
This Presentation Pack is brought to you by
25th Avenue Grade Separation
25th Avenue Grade Separation
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.

Wireless Local Number Portability Timeline - Phase 2
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
The Big 6 Research Model Step 3: Location and Access
Analysis & Disclosure of customer complaints
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3


Omnibus IV Contract Overview Elieen Emond Contract Specialist
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Wireless Local Number Portability Timeline - Phase 2
ATEC BRAC Update 154 Days Remain To 109 Days Remain To Cleon Raynor
Proposed core price & service spec L1 product milestone 31 Dec 2019
Pilot of revised survey
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

CLWC Water System Improvement Project Overview

Project Elements Phase 1 Portable Generator Install Flowmeters New SCADA for Existing System New Well #7 Phase 2 New Well 7 house/pump station New Tank 1 (450,000 gal) New Tank 1 BPS New Tank 3 (450,000 gal) New Big Bend BPS Additional Hydrants Complete SCADA

Phase 1 Status Element Portable Generator Install Flowmeters New SCADA for Existing System New Well #7 Status Complete – in place Underway – 31 May Complete – operational Cased to 695’, water level at 590’ – pump test pending

Phase 2 Status Final Design near completion – Well 7 House/Pump Station design dependent upon pump test results Anticipate going to bid end of May – Award by end of Jun – Construction underway by end of Jul Project completion (including O&M manual) by Apr 2016