PROPOSED EXPERIMENTAL PROTOCOLS AND ENHANCEMENTS OF THE EXISTING FACILITY Dr. ing. Ilinca Nastase – CAMBI Center.

Slides:



Advertisements
Similar presentations
Seminar CHAM Case Study – Building HVAC PHOENICS 2006 applied to Steady-state Simulations of the Internal Flow within a Multi-storey Building.
Advertisements

SPD cooling Test bench Preliminary results CERN (Geneva) A.Francescon Università & INFN Padova 1.
Containment Equipment and Facilities. Biocontainment The principle of holding or being capable of holding or including within a fixed limit or area The.
PowerPoint ® Presentation Chapter 15 Troubleshooting and Mitigating IAQ Problems Troubleshooting and Mitigating IAQ Problems Overview of Non-IAQ Problems.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
1 Trade Skills HVACR116 Fiberglass Duct Board and Insulation Material.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Heating, Ventilating, and Air-Conditioning
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Laboratory Ventilation. 2 Types of Laboratory Hoods  Constant Volume  Conventional  By-Pass  Auxiliary-Air  Reduced Air Volume  Variable Volume.
Chapter 5 – Series dc Circuits
Prepared by Farid Khalaf.  Protect the worker.  Protect the sample being analyzed.  Protect the environment.
Hydraulics.
MEDICAL GASES Manufacture, Storage, Transport + Delivery
Industrial Ventilation - A major control measure Dr. AA, UTM.
Passive House Seminar for the Professionals from the Building Sector.
Research Project ä Your chance to discover something new ä Develop your own research protocol ä Integrate: ä problem solving skills ä laboratory skills.
Static Electricity 1. Matter is made up of particles that have mass & volume. 2. Particles of matter also have a property called an electric charge. 3.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Actuators Fluid Mechanics Aerospace, Security, and Automation.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
Office Layout Techniques and Space Requirements
Chapter 10 – Facility Layout
HVACR416 - Design IAQ / Ventilation / Pathways. Ventilation Most air handling units distribute a mix of outdoor air and re-circulated indoor air. Some.
SOFTWARE DESIGN AND ARCHITECTURE LECTURE 07. Review Architectural Representation – Using UML – Using ADL.
Heating Systems.
PSC 4011 Electricity: What’s the connection?. PSC 4011: Series, Parallel & Combined circuits Series circuit: _One path for electric current. _All elements.
Copyright National Air Filtration Association 2006 Rev. 2 Clean Spaces.
The Renson Headquarters Renovation issue Renovation issue Major findings Major findings The RENSON- The RENSON- Headquarters More information... More information...
Maintain IAQ with Energy Recovery Ventilators (ERVs) A ENTERPRISE Visit us at INTRODUCTION TO ERV.
Lesson 8 Using Pneumatic Systems. Next Generation Science/Common Core Standards Addressed?  CCSS.ELA Literacy RST Cite specific textual evidence.
Lecture 1. Chemistry Code:5913 Md Kausher ahmed Instructor Electrical department.
The chemistry of life The nature of matter Section 2.1.
FILTERING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Scrubbers Colloquium N. Maximova and the class. Puu
Introduction to Energy Management. Week/Lesson 8 Air Cleaning Equipment.
V3 vs. v4 New Protocols for LEED Tommy Linstroth, Principal.
SERVICE ENTRANCE EQUIPMENT
FIGURE 6.1 Overfilled Pipette Cylinder. Pipettes protruding from a pipette cylinder as a result of attempted insertion of pipettes after the cylinder is.
Using Pneumatic Systems. Next Generation Science/Common Core Standards Addressed?  CCSS.ELA Literacy RST Cite specific textual evidence to support.
Turbulence Models Validation in a Ventilated Room by a Wall Jet Guangyu Cao Laboratory of Heating, Ventilating and Air-Conditioning,
Day 1 Part 4 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Sterile Products Lab PHT 434
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010 eere.energy.gov Duct Sealing and Insulation TRAIN THE TRAINER WEATHERIZATION.
Optimization of Graphene Conductivity Under Pressure Variations Robert W. Raines Introduction The purpose of this experiment was to see if the conductive.
Page 1 of 12 Design of a low pressure drop liquid metal cooling system M. S. Tillack with advice and assistance from X. R. Wang, S. Malang and others ARIES.
Prevention and Control of Influenza A (H1N1) in the Workplace Engr. Nelia G. Granadillos Chief, Environment Control Division Occupational Safety and Health.
Part 15 Technician’s Guide & Workbook for Duct Diagnostics and Repair.
Date of download: 9/25/2017 Copyright © ASME. All rights reserved.
Fire Study in Multiple Compartments
BUILDING HEATING AND COOLING
NEW PLASTIC MEDIA BLASTING FACILITY FOR AIRCRAFT FIGHTERS AND HELICOPTERS ADAPTIVE TO THE MOST STRINGENT SPECIFICATIONS FOR ENVIRONMENTAL PROTECTION WORLDWIDE.
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
Controlling the flow of Electricity
Conductors and Insulators
Lecture Objectives Review for exam Discuss midterm project
FBE03: Building Construction & Science
Professor of Architectural Engineering College of Engineering
Laboratory Ventilation
Disaster Site Worker Safety
Disaster Site Worker Safety
Batteries.
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

PROPOSED EXPERIMENTAL PROTOCOLS AND ENHANCEMENTS OF THE EXISTING FACILITY Dr. ing. Ilinca Nastase – CAMBI Center

Schema of the experimental apartment with air diffusers and air distribution system

First idea of the experimental set-up:

If the first version is retained, different enhancement of the existing experimental set-up must be done: Replacement of the existing battery of filters from the air handling unit This operation should allow a prefiltration of the air directed to the experimental apartment.

If the first version is retained, different enhancement of the existing experimental set-up must be done: Introduction of a special battery of filters on the air introduction (only for Air diffuser 3 or for the entire air distribution system – in order to allow all combinations of air diffusers). This equipment should be composed of a metallic filter for retaining large dust particles, that should be followed by a pockets filter for smaller particles and an active carbon filter for gaseous pollutants. The active carbon filter is necessary in order to purify the introduced air in the controlled polluted zone (Hallway 1) – from the point of view of gaseous pollutants. In the same time the other two filters are needed to purify the same air from the point of view of particulate matter pollution as this could affect the carbon filter and the other equipment. Several manufacturers of filters have been contacted in order to decide which combination has to be chosen.

If the first version is retained, different enhancement of the existing experimental set-up must be done: Introduction of a distribution circuit for the pollutant generator. This circuit has to be equipment with a high precision gas flowmeter in order to control the pollutant flow rate. This should be a flowmeter similar to the ones used in medical applications, which are dedicated to high precision measurement of small flow rates of gaz.

If the first version is retained, different enhancement of the existing experimental set-up must be done: Introduction of a dedicated flow meter on the air distribution system Sealing and resealing of the test cell walls and non used air diffusers. This procedure should be correlated with permeability tests using the existing Blower Door Equipment

Some ideas and remarks about the first version of experimental set-up: The experimental facility is composed by an existing experimental apartment from our laboratory having four distinctive enclosures as presented in a schematized form in Figure 1. The apartment has an air distribution system connected with a real air handling unit presented in Figure 2. Air can be introduced through various air diffusers numbered from 1 to 4 in Figure 1. They can be used together or separately since all the supplying pipes are equipped with dampers (see previous description of the existing facility). Air is extracted through exhaust grilles numbered with 5 and 6. In the same way these extraction grilles can be decoupled. During the present study, as explained previously, the idea is to use Test Room 1 and Test Room 2) in order to simulate an indoor environment and the Hall ways 1 and 2 should be used to simulate a controlled polluted outdoor environment. In this case only the air diffuser 3 will be used. The possibility of using several other configurations by combining all air diffusers in order to create different pressure regimes would be possible also. Problem : The pollutant flow should be too important, much too important for the existing O3 generator

Second idea of the experimental set-up:

Some ideas and remarks about the secondversion of experimental set-up: Problem : one door (and a corresponding space) should be condemned !? This second version has the advantage that is decoupled from the existing air distribution system allowing parallel studies in the new air diffusion cell It is much easier to apply and control