Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
Advertisements

Introduction to Safe Management of Plant
Mod 373 “Governance of NTS Connection Processes”
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Rushcliffe Borough Council Development Management Process Changes to Planning Legislation Andrew Pegram Service Manager, Communities February 2015.
Jerevan November Tailing dams inspection Juliane Knaul Legal Expert, Agency of Mining, Geology and Minerals of Brandenburg, Germany AGENCY.
1. European Commission Status GHS Implementation in the European Community Global Thematic Workshop on Strengthening Capacities to Implement the GHS Johannesburg.
Carbon Capture and Storage (CCS) Offshore Transport and Storage
BS9990 : 2015 Updates and/or Changes
Health and Safety Executive Carbon capture and storage: HSE perceptions Dr Gordon Newsholme Process safety corporate topic group.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Planning Permission Process and Procedures
WASTE MANAGEMENT I WASTE HIERARCHY EUROPEAN UNION FRAMEWORK WASTE DIRECTIVE DEFINITION OF WASTE + ASSOCIATED PROBLEMS 1 Environmental Law.
Comhairle Contae Maigh Eo Mayo County Council PERMITTING OF ENERGY PROJECTS A Local Authority Perspective Iain Douglas Senior Planner Engineers Ireland.
Estonian Environment Information Centre The FINAL SEMINAR OF PROJECT LIFETCY98/CY/167 “Integrated Control of Industrial Pollution and Chemical Substances.
Biofuels and (Waste) Legislation- Presentation to Funding and Legislation Workshop 29 th March 2011 Dave Gorman Head of Environmental Strategy Scottish.
Energy National Policy Statements Nick Cooper DECC.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
Environmental Permitting Regulations Tom Fowler – Environment Officer
Pravin Amar Development Planners 14 July 2005, Assagay Hotel, 5pm Applicant: EnviroServ Waste Management (Pty) Ltd. Environmental Consultants Pravin Amar.
The Saskatchewan Natural Gas Advantage Licensing of Wells and Facilities J. A. Brian Mathieson, Director Petroleum Development Branch.
The German Approach on Safety of Natural Gas Distribution Pipelines WORKSHOP ON THE PREVENTION OF ACCIDENTS OF GAS TRANSMISSION PIPELINES (The Hague, 8.
1 Safety Legislation Reform Information Session Presenter:Simon Ridge.
REVISED WASTE CLASSIFICATION AND MANAGEMENT SYSTEM FOR SOUTH AFRICA National Waste Classification and Management Regulations & Standards Stakeholder Workshop.
Regulation of Pipelines
Planning Act 2008 Strategic Planning and Housing Scrutiny Sub-Group Wednesday 8 April 2009.
Second Conference on Legal Challenges and Opportunities of Mexico’s Increased Global Interaction American Bar Association Los Cabos, Mexico, November 2013.
‘OHS - A Survival Kit’ State Library of Victoria Buildings & Facilities Division (OHS) Occupational Health & Safety ‘A Survival Kit’ February 2002 Presenter:
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Contaminated Land Regulations – Consolidated Review 21 September 2005 Craig Edwards.
TRP Chapter Chapter 3.1 Regulatory approaches.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
Corporate slide master With guidelines for corporate presentations The draft Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
1 Waste Duty of Care (The Environmental Protection Act 1990) To what kind of waste does the duty of care apply? –Controlled Waste (Directive Waste) - Includes:
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
1 The NEMA EIA Regulations & the cultivation of virgin soil Gerhard Gerber (DEA&DP) Fynbos Forum – August 2006.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
-EU Climate and Energy Package- Mihai Tomescu Policy Officer, Unit ‘Energy and Environment’ Directorate-General Environment European Commission Enabling.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
DRAFT Proposal for a European Directive on the Geological Storage of Carbon Dioxide Subject to modification on adoption by the Commission.
1 August 2010 Shell Upstream International - Europe Consenting Carbon Capture & Storage Scottish Government Workshop - Offshore Pipeline 11 August 2010.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Current state of regulation of shale gas regulation in the UK Dr Sanna 12 March
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
1 Proposed amendments to the National Environmental Management Act, 1998 (NEMA) October 2007 Presentation by Joanne Yawitch DDG EQP.
Environmental Impact Assessment in the Slovak republic.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Rookery South Resource Recovery Facility (RRF) Evolving List of Documents being prepared for submission to the Infrastructure Planning Commission Administration.
Parliamentary Portfolio Committee Presentation Annual Report 2012.
The Permitting Process under the Pollution Prevention and Control (Scotland) Regulations Ian Halliday Senior Policy Officer.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
Mosun Togun CCS Regulation Seminar U.I.O Oslo LLM Environmental Law15 th May, 2009.
Update on EU Issues 10 th March 2010 Manchester Conference Centre Health and Safety Executive Major Hazards Policy Team Paul Edwards.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Waste Management (End of Life Vehicles) Regulations, 2003 What is the current legal situation and how will these Regulations change things Legal Consultants.
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Instance of Article 6(1)(b) in England and Wales: small electric lines
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
Jerzy Jendrośka Transboundary procedures
Tree related planning legislation
Discussion of Isolated Small Scale Electrical Power Enterprise Regulations Nay Pyi Taw, March 2018 Jakob Schmidt-Reindahl.
Implementing the EU CO2 Storage Directive: Challenges and Opportunities 7 November 2011 Public Engagement in the UK Louise Barr, Head of Outreach.
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Regulatory Dry Run Workshop 2 Transport Session 1 - Onshore Transportation 11 th August 2010 Michael Jordin Principal Design Engineer

2 Aim of the presentation  To assess the regulatory framework for the onshore transportation of CO 2 by cross country pipeline  To cover the following 3 regulatory areas: 1. Planning 2. Environment 3. Safety

3 Onshore Transportation Components of the Application  Construction of 20km of new pipeline  Conversion of 40km of existing National Transmission System pipeline currently used to convey natural gas, for the conveyance of carbon dioxide  Modifications to existing block valves and above ground installations on the NTS pipeline to allow for the conveyance of carbon dioxide instead of natural gas  Construction of a new compressor facility Assumptions  The CO 2 will be transported in gaseous phase (35 barg operating pressure)  The compression facility will comprise two 50% electric drive compressor units and one 50% gas drive standby generator. To allow two stage compression  CO 2 will be transported offshore in dense phase (120 barg operating pressure)

4 (Pure) CO 2 Pressure – Temperature diagram Pressure (barg) 10,000 1, Temperature ( o C) Solid Melting line Vapour (gas) Critical point (73.9 bar 31.1 o C) Triple point (5.1 bar o C) Saturation line Sublimation line Dense phase (liquid) Super critical fluid Typical pipeline temperature operating range Approx. area of 2 phase fluid 38 barg 150 barg NOTE - Diagrammatic - Not To Scale

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Planning

6 Planning – New Pipeline (20km) Pipe-lines Act 1962 – Pipeline Construction Authorisation  Application for Pipeline Construction Authorisation (PCA) under Section 1 of the Pipe-lines Act 1962 to be submitted to the Scottish Government  The Pipe-lines Act relates to on-shore cross country pipelines (except those of public gas transporter, the government or water companies) which are more than 10 miles ( km) long  Pipe-lines Act applies to pipelines for the conveyance of anything other than air, water, water vapour or steam  Under Section 5 of the Act the Scottish Ministers can direct that works authorised by the PCA are deemed to be granted permission under Town and Country Planning

7 Planning – New Pipeline (20km) cont. Pipe-lines Act 1962 – Compulsory purchase In the event of an objection by a landowner to permit the construction of the pipeline across their land:  Under Section 11 of the Act the developer can apply for a compulsory purchase order made by the Scottish Ministers to purchase compulsorily land which is required as the site of any of the works.  Under Section 12 of the Act the developer can apply for compulsory rights order made by the Scottish Ministers to acquire rights over land for pipeline construction and maintenance  Such applications are subject to Parliamentary procedure

8 Planning – Existing Pipeline (40km) cont.  40km of existing NTS natural gas pipeline to be converted for the transmission of carbon dioxide  The existing pipeline will have been constructed under the provisions of the Gas Acts and deemed planning consent under the terms of the General Permitted Development (Scotland) Order  Compulsory purchase powers for the obtaining of servitude rights were available under the Gas Acts  The pipeline will be transferred from the statutory undertaker regulated under the Gas Acts to a non-regulated business  No legal mechanisms have been identified for the transfer of consents which attach to the pipeline  New servitude rights may need to be negotiated with landowners for the use of the pipeline for the conveyance of CO 2

9 Planning – Existing Pipeline (40km) cont.  Consenting options: Change of Use application under the Town & Country Planning (Scotland) Act 1997  Land Rights Electricity Act 1989? Offshore Petroleum Development (Scotland) Act 1975?

10 Planning – Existing Pipeline (40km) cont. Town & Country Planning (Scotland) Act 1997 – Change of Use  Change of Use application to the Local Planning Authorities to cover:  Change of use from conveyance of natural gas to conveyance of CO 2  Modifications to existing block valves and above ground installations to accommodate the conversion  More than one application required CPO Provision  No provision for the developer to apply for CPO, reliant on LPA using their powers under Section 189 of the Act subject to various conditions and obtaining the approval of the Scottish Ministers  Section 189 does not confer a right for local authorities to acquire compulsorily a new servitude

11 Planning – Existing Pipeline (40km) cont. Pipe-lines Act 1962 – Pipeline Diversion  If new sections of pipeline are required to accommodate change of use of the existing NTS pipeline then the works could be undertaken as a diversion of a PCA pipeline under Section 1(A) of the Act.  This assumes the following:  The existing pipeline has PCA consent under Section 1 of the Act  The new pipeline and converted existing pipeline are considered one pipeline for the conveyance of CO 2  Holistic approach, one application to the Scottish Government for the new and existing pipelines  Modifications to existing block valves and above ground installations to accommodate the conversion would be included in the consent.

12 Planning – Existing Pipeline (40km) cont. Pipe-lines Act 1962 – Pipeline Diversion Compulsory Purchase Provision  Provisions for the developer to apply for CPO/Compulsory Rights Order, under Sections 11 and 12 of the Act THESE PROPOSALS REQUIRE CONSULTATION WITH SCOTTISH GOVERNMENT

13 Planning – Existing Pipeline (40km) cont. Electricity Act 1989 – Land Rights  Potential to make use of provisions for compulsory purchase powers on servitudes available under the Electricity Act 1989?  This assumes that:  CO 2 is produced as part of energy production  Prior to conveyance CO 2 is cooled  Generation licence in terms of the Electricity Act 1989  Scottish Ministers may authorise a licence holder to compulsorily acquire land required for activities for which he is authorised by his generation licence to carry on.  This would include acquisition of new rights including servitudes.

14 Planning – Existing Pipeline (40km) cont. Offshore Petroleum Development (Scotland) Act 1975? – Land Rights  Enables the Secretary of State (DECC) to compulsorily acquire land in Scotland  For purposes relating to exploration/exploitation of offshore petroleum and purposes connected therewith  Act includes for the provision of pipelines and associated apparatus or works for conveying gas to or from the places in or under the sea bed where it is stored or to be stored. (added by Oil and Gas (Enterprise) Act 1982 which extended the original purpose of the 1975 Act)  Under the Act “gas” appears not to be limited to natural gas

15 Planning –New AGIs & Compressor Town and Country Planning (Scotland) Act 1997  New above ground installations to be constructed on the new and existing pipeline and the new compressor facility will require planning consent under the T&CP Act (unless consented by the Pipelines Act consent))  Applications to be submitted to the relevant Local Planning Authority

Environmental

17 Environmental Impact Assessment – Pipelines Act Pipeline Works (Environmental Impact Assessment) Regulations 2000  The Pipeline Work (Environmental Impact Assessment) Regulations 2000 apply to applications for Pipeline Construction Authorisation under Section 1 of the Pipelines Act 1962  Any pipeline which is intended to convey oil or gas or any pipeline exceeding 40 kilometres in length and 800 mm in diameter which is intended to convey chemicals require an Environmental Statement to be submitted or a request to the Secretary of State for direction that no Environmental Statement need be prepared (determination)

18 Environmental Impact Assessment – Pipelines Act Pipeline Works (Environmental Impact Assessment) Regulations 2000 Query  Clarification is required as to whether CO 2 constitutes a ‘gas’ or ‘chemical’ in terms of the Pipeline Works (EIA) Regulations  Provisions of the CCS Directive (2009/31/EC) which amends the EIA Directive 85/337/EEC to include pipelines for the transport of carbon dioxide streams for the purpose of geological storage needs to be transposed into UK legislation

19 Environmental Impact Assessment – Planning Environmental Impact Assessment (Scotland) Regulations 1999  The Environmental Impact Assessment (Scotland) Regulations 1999 apply to applications under the Town & Country Planning (Scotland) Act  The regulations do not currently include development for the transport of CO 2 for the purpose of geological storage.

20 Environmental Impact Assessment – Planning Environmental Impact Assessment (Scotland) Regulations 1999 Queries:  Would EIA Regulations apply to Change of Use applications?  Provisions of the CCS Directive (2009/31/EC) which amends the EIA Directive 85/337/EEC :  Annex 1 to include “Pipelines with a diameter of more than 800mm and a length of more than 40km ……… for the transport of carbon dioxide streams for the purpose of geological storage, including associated booster stations”  Annex 11 “Oil and gas pipeline installations and pipelines for the transport of CO 2 streams for the purposes of geological storage (projects not included in Annex I)” needs to be transposed into UK legislation  Schedule 2 of the regulations needs to be amended to include industrial / pipeline installations for carrying CO 2 for the purpose of geological storage

21 Other Environmental Consents  Consent under the Water Environment (Controlled Activities) (Scotland) Regulations 2005 (CAR) - Works in or near water  Licences for the disturbance of Badgers under the Protection of Badgers Act 1992  Registration as a Carrier of Controlled Waste – the CCS Directive (2009/31/EC) amended the Waste Framework Directive so that CO 2 captured and transported for geological storage is not a waste – this needs to be transposed into UK legislation  Permits under Pollution Prevention and Control (Scotland) Regulations – compressor site emissions

Safety

23 Safety Consents  Health and Safety at Work etc. Act – Major accident prevention document  Pipeline Safety Regulations (PSR) 1996 Regulations 20 – 6 months notice of commencement of construction submitted to HSE  Pipeline Safety Regulations (PSR) 1996 Regulation 22(2) – notification of change of use of existing pipeline submitted to HSE  Construction (Design and Management) (CDM) Regulations 2007 Sections 7.1 and 7.3 – notice of commencement of construction submitted to HSE  Control Of Major Accident Hazard (COMAH) Regulations 1999 – Major accident prevention policy  Control Of Substances Hazardous to Health (COSHH) Regulations 2002  Gas Safety (Management) Regulations (GS(M)R)  Pressure Systems Safety Regulations (PSSR)

24 Safety Consents  Pipeline Safety Regulations (PSR) 1996 Regulation 22(2) – de-notification of existing pipeline submitted to HSE  CO2 does not currently fall in the "dangerous fluid" category under Schedule 2 of the regulations but the HSE is currently progressing amendments to PSR which will include reclassification of CO2 as a dangerous fluid. The amendments are expected to be published in October 2010  Pipeline Safety Regulations (PSR) 1996 Regulation 21 – re-validation notification of existing pipeline submitted to HSE  14 days’ prior notification of the intention to bring a MAHI pipeline into use so it has the opportunity of a final inspection before a dangerous fluid is first introduced into the pipeline.  Control Of Major Accident Hazards (COMAH) Regulations 2005 – COMAH Licence for Compressor Site  Dependent up on the classification of CO2 under the COMAH Regulations.

Consents Timescale

26 EIA Consents – Timescales  Screening (to determine EIA requirements – EIA Regs)  Scoping (2 months)  EIA/ES (15 months) (key stakeholders consultation)  Public consultation  Submit Planning Application to Local Authority (T&CP Application) and/or ‘Pipe-line construction authorisation’ to Scottish Government (PCA Application)

27 Land Rights Strategy  Early discussion with National Farmers Union Scotland / Scottish Rural Properties and Business Association  Legislation to be used will affect use of compulsory powers and provisions for deeds of servitude  CPO Process – estimated 9 months

28 Any questions or other issues