WorldFIP optical repeaters 1 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the.

Slides:



Advertisements
Similar presentations
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Advertisements

Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Compressor status AWAKE Technical Board meeting 19 May 2015.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
` $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Radar Development Status Report S. Gogineni, C. Allen, J. Ledford, K. Marathe, V. Jara, S. Raghunathan and M. A. Hameed.
TECHNICAL INSTALLATION RADWG - 2 APRIL /03/20091J.Lendaro EN/STI/ECE.
06/02/02CERN - LARG meeting1 CALIBRATION BOARD STATUS  Status of the DMILL chips used on the calib. boards  Low Offset Op Amps: Offset measurements 
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
Coursework. Deadline: 20 th December 2013  The marks for Background and analysis lock down on 20 th Dec and are sent to the board. After this date changes.
Review of MPE activities during LS1 and outlook for LS2/LS3 View from BE/CO V.Baggiolini, M.Vanden Eynden On behalf of the BE/CO APS, DA, DO and FE Sections.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
WIMAX UCLA Giovanni Pau UCLA
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
WorldFIP Infrastructure E.Gousou | BE-CO |15 Oct 2014 | R2E | Maintenance | Availability.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Monitoring and Diagnostics infrastructure & SW for LHC QPS WorldFIP first analysis Michel Arruat, Frank Locci, Julien Palluel BE/CO1.
` $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
ELENA installation progress F. Butin / ELENA collaboration.
DCFEB Production for LS2
Deployment timelines LHCb CMS ATLAS 2007 Dec Nov Oct Sep Aug Jul Jun
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Jan 2016 Solar Lunar Data.
COMPUTER INTEGRATED MANUFACTURING
11 T Dipole Integration & Plans M. Karppinen
BACK SOLUTION:

EVLA M/C Software PDR, 14 May 2002
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
CMX scope and functionalities
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Background Information P.Napier

Presentation transcript:

WorldFIP optical repeaters 1 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the repeaters needed for QPS LS1 tests Doubling of QPS WorldFIP infrastructure -> Increased need for repeaters

WorldFIP optical repeaters 2 | status Feb 2013: 66 repeaters ordered to HLP; never delivered Feb 2014: HLP announced eminent closure Jun 2014: 40 of the repeaters needed for QPS LS1 tests Doubling of QPS WorldFIP infrastructure -> Increased need for repeaters fiber

3 Purchased 110 PCBs from HLP and all the components Built and validated 2 prototypes by hand at CERN Mar 2014: Purchased HLP design files May 2014: Expecting 40 units WorldFIP optical repeaters | status Jun 2014: Installation

4 Discussed alternative for LS1 QPS tests Removal of repeaters; gateway directly in the tunnel WorldFIP optical repeaters | status

5 Discussed alternative for LS1 QPS tests Removal of repeaters; gateway directly in the tunnel Solution validated, but will not be needed WorldFIP optical repeaters | status

6 WorldFIP optical repeaters | status Production Order 40 boards delivered First Installation No expected delay to the LS1 schedule