I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Concrete Decks
Advertisements

Structural Steel Construction
Chapter-2 Parts of Steel Bridge.
RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
2013 Northcentral Region Construction Conference
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Characteristics of Three Bridge Types
Ying Tung, PhD Candidate
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
By : Prof.Dr.\Nabil Mahmoud
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
SHRP2 Project R04 Bridge Designs for ABC
Spliced Precast Girders
ENG-1010 Lecture 16 Bridge Design.
Chapter 34 Bridge Construction.
6TH ANNUAL CONFERENCE. The Use of Temporary Steel Barriers in Construction Zones By Don Pyde Product Manager Trinity Highway Products.
Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Reconstruction of the Eads Bridge Highway Deck
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
Project Description: The Stonelick-Williams Corner Road Covered Bridge Rehabilitation project proposes improvements to the existing structure to preserve.
Region One Bridge Design – Robert Jose Tovar “If I have seen further it is by standing upon the shoulders of giants” – Isaac Newton.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
EXAMPLE 9.3 – Part III PCI Bridge Design Manual
Concrete Construction
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Note: Moment Diagram Convention
Spliced Girders A Producer’s Perspective
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Introduction to a pit installation
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
“Get in, do it right, get out, and stay out.”
C. C. Fu, Ph.D., P.E. The BEST Center
Moment Connection Requires Bolts Outside the Flanges
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
A Load Rating of a 3 Span Continuous Deck-to- Through Truss Bridge in Br|R AASHTOWare BrDR 2013 User Group Meeting A Load Rating of a 3 Span Continuous.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Overview of New Practices & Policy Skewed Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Presented By: Marvin Burns, PE Janssen & Spaans Engineering, Inc.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Bridge disasters.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Posting Bridges for Specialized Single-Unit Trucks
Engineering Terms Bridge Unit.
Structural Considerations for Trusses
Project Purpose and Objective
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
Chapter-2 Parts of Steel Bridges.
Mitre III Building McLean VA Debra Schroeder Structural Option.
AASHTOWare Bridge Design & Rating (BrDR) 3D FEM Analysis Capabilities
Presentation transcript:

I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE

I-5, Skagit River Bridge Collapse Bridge collapses on May 23, 2013 Struck by over height truck I-5 the only N-S interstate in WA state w/ ADT = 71,000 $14 billion of US-Canada commerce passes thru I-5 annually Courtesy: WSDOT

Collapsed Bridge Courtesy: WSDOT

I-5, Skagit River Bridge Collapse Courtesy: WSDOT

First Steps 1.Within 24 hrs – Assembled team to evaluate replacement options 2.Within 24 hrs – Selected contractor (force acct.) to remove debris 3.Within 48 hrs – Options for temp. bridge alternatives evaluated – 30 day emergency contract executed 4.Within 72 hrs – Governor and Secretary of Transportation announce plans to install temp. span w/in 30 days and reopen I-5 Courtesy: WSDOT

Next Steps Coordination w/ NTSB investigation Inspection of remaining trusses & piers Repairs to remaining trusses ACROW temp bridge ordered and pier supports modified Courtesy: WSDOT

Temp. Span Details Acrow panels – arrived w/in 5 days Two temp. bridges placed side by side using launching technique Speed reduced to 40 mph Opened to traffic in 27 days Courtesy: WSDOT

Perm. Span Contract Details 1.Accelerated RFP Process 2.A+B+C = Best Value Approach A= # hours of total closure x $660K/day B= Days past Sept 4 th x $50K C= Price proposal 3.Two week proposal period – from RFP to award 4.Best value award $6.9M – Max J. Kuney & PB team 5.Anticipated opening of Sept 5 th w/ 12 hr. total closure Courtesy: WSDOT

Perm. Span Options 1.Precast, prestressed deck bulb tee girders (59” deep) 2.Lightweight concrete deck bulb tee girders (65” deep) 3.Steel girders (6’ deep) w/ 3.5” precast stay-in-place panels w/ 5” CIP concrete topping 4.Steel plate girders (5’-6” deep) with CIP slab 5.WSDOT obtained all environ. permits, ROW, detour permits, etc. Courtesy: WSDOT

Preferred Alternate Modified deck bulb tees (lightweight concrete) chosen for: 1.Shorter fabrication time 2.Greater schedule control 3.Conventional construction 4.Concrete wt. = 133pcf Challenges : 1.Concrete superstructure weight less than 915 tons 2.Weight for shipping and erection Courtesy: WSDOT

Girder Connection Details 1.Headed bars used between girders (first use in WA, based on NCHRP research); staggered between girders 2.Full moment connection Courtesy: WSDOT

Camber Challenges 1.Predicted camber – 5.5” 2.Vertical profile - 1.5” 3.Pre-cambered the girder forms ” 4.Used 1.5” modified concrete overlay Courtesy: WSDOT

Perm. Span Details Replacement Scheme – Lateral Slide Courtesy: WSDOT

Lateral Slide Details 1.Push & reset system 2.2 – 150 M-ton jacks one on each side for lateral move; 4 – 150 M-tons for vert. movement 3.Total lateral move – 75 ft 4.Skid beam w/ clad stainless steel sheets; support beams w/ Teflon surface Courtesy: WSDOT

Temp. Bents – Special Feature Special truss span = 77 ft. Courtesy: WSDOT

Skid Track Details Courtesy: WSDOT

Modified Concrete Overlay 17 1 ½” modified concrete overlay 42 hours cure time Deck temperature between F Courtesy: WSDOT

Placement Details Courtesy: WSDOT

Lowering Span To Final Position Courtesy: WSDOT

Bridge Move Summary 1.19 hours full road closure 2.Temp. span out in 25 minutes 3.Permanent span into place in 45 minutes 4.Superstructure lowering in 30 minutes Courtesy: WSDOT

NTSB’s Findings (failure mechanism) 21 1.Truck hits the sway brace 2.Vertical member L4-U4 is deformed 3.Upper chord U3-U5 pulled downward 4.Bucking failure in upper chord at node U4

NTSB’s Findings 1.Load 2” taller than permitted. 2.Pilot car distracted by cellphone (although hands-free); claimed that clearance pole never struck the bridge. 3.Insufficient distance between pilot car and truck (less than 1/2 of what it should be). 4.States should have better warnings for low-clearance bridges. 5.Provide lane specific guidance for bridge clearance.

Vertical Clearance Upgrade Courtesy: WSDOT