Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with.

Slides:



Advertisements
Similar presentations
USC Viterbi School of Engineering. Automated Imbedding of Steel Reinforcement Mesh.
Advertisements

WOOD LIGHT FRAME CONSTRUCTION
Finishing Poured Concrete Surfaces
Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.
Trying to get the shingling finished in a snowstorm.
Czech Technical University in Prague Faculty of Civil Engineering Department of Microenvironmental and Building Services Engineering Czech Technical University.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Ground-Supported Slabs • Exterior Flatwork
Fire Behaviour Elements of Structure and Fire Development.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
ECOFLOOR TRAINING HEATING CABLE TYPES SINGLE-CORD CABLES*:DOUBLE-CORD CABLES**: - SCREEN PROTECTION: - WITHOUT SCREEN PROTECTION: - SCREEN PROTECTION:
Heating foil ECOFILM F Installation guide. ECOFILM F - OPTION Suitable for laminate floating floors: width(mm) input (W/m 2 ) F F (48V) 530.
KOECH KIPLANGAT JOSEPH ADM NO 2012/BC/25432 CLASS 2012BCBC1B.
Energy Efficient Through-holes Repository: Aho Hanna, Korpi Minna (edit) REALISATION OF AIR PROOF STRUCTURES AND CONNECTIONS IN RESIDENTAL BUILDING Techical.
CONSTRUCTION AND DETAILING 1
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
School of the Built Environment Construction Technology D19SC Unit 4 SUBSTRUCTURE DESIGN – WALLS FLOORS & BASEMENTS 1 Unit 4 SUBSTRUCTURE DESIGN - FLOORS,
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Energy Efficient Through-holes The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion.
Structural Drying Open enclosed areas (walls, floors) Drying may take several days or weeks.
Btec Construction Unit 5 Methods of construction for domestic buildings.
Ben Craig, Operations Director 25 April 2013 DECC Fuel Poverty Project The Delivery Experience.
Insulation Ashfield Direct Learning Tim Gregorczyk Your Photo Will go Here! Ks4 Energy.
Dry lining by direct bond – overview
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
Graphic Communication
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
Sustainable Construction Methods
Framing the House. Platform Framing Platform framing.
A Guide to Solid Wall Insulation INSTALLATION. Surveys Properties need to be fully surveyed Is substrate suitable for mechanical fix? Is there sufficient.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Notes taken from Gillette’s Designing with Light.
appseal ® STP Acrylic based elastomeric strip Areas of application: (A) Over Construction joints. (B) Over Expansion joints. 1.
Working with Resistive Heating Tape.
Installing a Backflow Cage. Verify the Backflow and Area.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Energy efficient connections in stone houses The sole responsibility for the content of this publication lies with the authors. It does not necessarily.
Certificate number: FS453/02 Application FS21 Firestop Panel is used to firestop mechanical and electrical services where they pass through fire rated.
Pipe Clips.
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
The reading is 7.38 mm. The reading is 7.72 mm.
Interest Free Energy Efficiency Loan Program Proposal for Improvements August 15, 2016.
VIA / TCU 4th semester workshop S2016 CASE 2: Multistory Building VIA University CollegeTCU-VIA Workshop – S20161 A Quick Discovery of Construction in.
Jolly Board is India's largest Fibre Board manufacturer. The company produces a wide range of Hard Boards and Soft Boards that strive to meet India's.
Weber Tile Fixing.
CONCRETE AND SUSPENDED TIMBER
CASE 2: Multistory Building
CHAPTER 1 -The pre-insulated air ducting panels
Types of ground floors.
Hazards in St Joseph high school Newry
Substructure Construction Sequence
Construction Technology
Finishing Dry Lining – Direct Bond
DAMP-PROOFING AND WATER-PROOFING COURSE
Progress Charts.
International Building Materials and components
PREPARATION FOR WINTER
Building Construction I Sofia Sebastian 1
Framing the House                                                                                                                   
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Floor screeding.
FINISHES (FLOOR, WALL & CEILING)
ચાલો માટી વિશે જાણીએ All About Soil.
Direct Bond – Dry Lining to Masonry Backgrounds
CASE 3: Multistory Building
Making a simple steady hand game
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Presentation transcript:

Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with 50mm duck tape) Under floor heating Insulation / Celotex – (Tape joints with 100mm foil tape) Under floor heating Edge Strip Fix the edge insulation continuously around all internal and external wall edges – including soil stacks and pipes

Concrete Over site 300mu DPM Floor finish 40mm Gvylon screed 250mu DPM Under floor heating Insulation / Celotex Electric Under floor heating Edge Strip Fix the edge insulation continuously around all internal and external wall edges – including soil stacks and pipes

Concrete Over site 300mu DPM Floor finish min 30mm Gvylon screed Standard floor Edge Strip Fix the edge insulation continuously around all internal and external wall edges – including soil stacks and pipes