SYSTRA Proudly Presents…

Slides:



Advertisements
Similar presentations
Railways Systems: Applications HSI beyond DoD Dr. Jen Narkevicius Jenius LLC Dr. Jen Narkevicius Jenius LLC Human Systems Integration.
Advertisements

Prioritized Scheduling and Managing of All Utility Work Utility Characteristics Historical Concerns Improvement Goals Process Teams Implementation of.
Distributed Data Processing
Wallingford Software What’s New in InfoWorks CS v8.5 Andrew Walker.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
GIS-Based Rail Line Asset Viewer
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
Customized math instruction via the Internet All it took was a little effort … and the MCAS-Pass Learning Lab.
GIS and Transportation Planning
MTA - New York City Transit 1 New Technology Signals Program Project update to APTA June 13, 1995 T. J. Sullivan Director, New Technology Signals Division.
Energy Performance Analysis with RETScreen
ISecurity Complete Product Series For System i. About Raz-Lee Internationally renowned System i solutions provider Founded in 1983; 100% focused on System.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
February 28, 2005 NOAA / NOS / CO-OPS An Oceanographic Processing Environment: From System Design to Data Quality Chris Paternostro, Oceanographer NOAA,
Introduction to Systems Analysis and Design
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Washington Metropolitan Area Transit Authority Voliya Arakkal Sr.GIS Analyst GIS in Public Transportation Conference September 15, 2011 Linear Referencing.
BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013.
TrendReader Standard 2 This generation of TrendReader Standard software utilizes the more familiar Windows format (“tree”) views of functions and file.
Overview System modelling and holistic simulation :
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
© 2012 Autodesk AutoCAD ® Map 3D 2013 What’s New Lynda Sharkey Technical Marketing Manager.
Applied Transportation Analysis ITS Application SCATS.
Microsoft ® SQL Server ® 2008 and SQL Server 2008 R2 Infrastructure Planning and Design Published: February 2009 Updated: January 2012.
© 2008 Mass Transit Experience Contact: Curt Bailey, President (248)
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
Charles Hosken, General Manager Imperial Irrigation District
A Spatial Analysis of Orange Line Rider Demographics November 1, 2012By Tamar Sarkisian.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Emergency Management & HLS Solution Assessment and Pre-Planning Software.
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
1 Rail Infrastructure Spending Railroad investments to meet growing demands Brian Sweeney BNSF Railway International Legislators Forum Deadwood, SD June.
Montgomery County Maryland I-270 Integrated Corridor Management Project Tom Jacobs, University of Maryland Center for Advanced Transportation Technology.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Software Aspects of PQ in a DG Context By Dr. Siri Varadan.
material assembled from the web pages at
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
Service Transition & Planning Service Validation & Testing
Connectivity & Mobility
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
IO – CART Project Status Protocol Revision Subcommittee Update 06/22/06.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
Teaching and Learning with Technology to edit Master title style  Allyn and Bacon 2002 Teaching and Learning with Technology lick to edit Master title.
Systems Life Cycle A2 Module Heathcote Ch.38.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Michigan Tech. University Michigan Tech. University PhD Candidate.
Programmable Logic Training Course HDL Editor
The Chicago Transit Authority Sustainability Initiatives.
Authorized economic operator Minimizing risks, optimizing flows.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
A computer contains two major sets of tools, software and hardware. Software is generally divided into Systems software and Applications software. Systems.
Bringing together leading research institutions to advance electric ship concepts. Bringing together leading research institutions to advance.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
AEO COMPLIANCE PROGRAM Authorized Economic Operator Requirements.
Monica Bansal Department of Transportation Planning Presentation to the TPB CAC November 13, 2008 Progress on “CLRP Aspirations” & “What Would it Take?”
Engineered Security Systems, Inc. Access Control Systems CCTV Systems Asset Protection Systems Fire Alarm Systems Laptop Protection Systems Burglar Alarm.
READ ME FIRST Use this template to create your Partner datasheet for Azure Stack Foundation. The intent is that this document can be saved to PDF and provided.
Positive Train Control
AEO requires a compliance framework
AEO COMPLIANCE PROGRAM Authorized Economic Operator Requirements
Chicago Transit Authority Energy Initiatives
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
Equipment Compliment Module
Presentation transcript:

SYSTRA Proudly Presents… 8.1

The Industry-Leading Simulation Software Suite Enhanced to BETTER Help You…

Get Answers! Test Before You Invest How will PTC affect operations? …or infrastructure? How will PTC affect operations? …or train control? Do we need more substation capacity? Where are our capacity pinch points? Which operational alternative best suits our needs? How many are there? Which solution is best for us? How cost-effective is Regenerative Braking?… How can we centralize our infrastructure, operations, and signal logic data? Which rolling stock should we use/buy? Get Answers!

Train Performance Calculator (TPC) The 1-train simulator that helps you examine: Train trip times Line capacity — identify pinch points and test resolution alternatives Train power/energy consumption/demand Rolling stock alternatives/ retrofits Rail alignment alternatives …and more! Useful for: All Departments Introducing Personnel to simulation concepts

RAILSIM Editor (RE) One-stop database development Store all departments’ design/simulation data in a single repository including Infrastructure Signals / Train Control Operations Equipment Useful for: All Departments Design/Engineering/Planning/Operations Personnel

RAILSIM Editor Track Profile Generator Design and Analytical tool so you can Isolate the train routes you need to edit / analyze Define purpose- specific engineering drawing templates …and export those drawings to CAD-compatible files as needed! Useful for: ALL Departments ALL Engineering/Design Personnel

Network Simulator Full model simulator so you can Identify and quantify operational issues and test alternatives Evaluate peak period construction outages Analyze infrastructure and train control and operational alternatives Test operations and capacity under new signal and infrastructure designs …and more! Useful for: All Departments All Design/Engineering/Planning/Operations Personnel

Network Simulator Click this image to view a video clip showing a RAILSIM Network Simulator session in progress. Here, the user has specified that a train's display color indicates its on-time performance (and specified 3 OTP categories: green for early and on-time; yellow for slightly late; red for excessive lateness). Click outside the image to proceed to the next slide.

Load Flow Analyzer – DC and AC Versions The electrical simulator that helps you Predict power consumption costs Examine your rail network’s electrical loads and potential Analyze the effects of regenerative braking Useful for: Traction Power and Planning Departments Electrical Engineers

Supporting Modules Headway Calculator to assist your line capacity analyses Safe Braking Calculator to assist your signal design efforts Control Line Generator to facilitate your train control designs Useful for: All Departments Introducing Personnel to simulation concepts

NEW Highlights in RAILSIM 8.1 Network Simulator Reorganized display options Run-time comprehensive conflict detection and resolution Cab and wayside signaling (and wayside with cab) fully supported New approach to defining Train Lateness Classes True multi-threaded architecture for processing efficiency Advanced interlocking processing

NEW Highlights in RAILSIM 8.1 Safe Braking Calculations (in RE) Support for Maximum Attainable Speed computations, with consideration of: Default centering of train within platform Support for starting from car stop markers Support for different train starting speeds at different platforms

NEW Highlights in RAILSIM 8.1 Track Profile Generator Move signals and Add/Edit/Delete other model data without having to exit back to the main Editor Easier and more flexible engineering drawing support Engineering drawings can include tabulated data Enhanced wayside signal symbols User-defined engineering drawing templates! …and MUCH MORE!

Helping the Rail Industry Get Answers (RAILSIM Since 1991) and Helping the Rail Industry Get Answers (RAILSIM Since 1991) MTA Long Island Rail Road MTA Metro-North Railroad MTA New York City Transit MTA Staten Island Railway

LACMTA Westside Extension Transit Corridor DEIS/R and ACE Los Angeles, CA Alternatives analysis for upgrades to the LACMTA’s existing Metro Red Line and Purple Line to support desired operations and maximize/increase capacity. In conjunction with this project, LACMTA is obtaining its first RAILSIM license, along with a week-long training program for their personnel.

Washington Metropolitan Area Transit Authority (Metro) Outer F Washington, D.C. As part of the WMATA Outer-F Contract, SYSTRA provided the RAILSIM® Simulation Software Suite to WMATA in 1999, including software licensing, training, user support and database development for the 7 route-miles of the Outer-F Line (Anacostia to Branch Avenue Stations). After WMATA reviewed the power of the RAILSIM software for operations analysis, SYSTRA was awarded follow-on work for an additional 97 route-miles, thereby creating a single database for the entire “full build” 104 route-mile network. Metro System in RAILSIM 6.5

Washington Metropolitan Area Transit Authority (Metro) RAILSIM License Upgrade, Expansion and Software Enhancements Washington, D.C. Metro currently is upgrading its RAILSIM site license and expanding it to include custom software enhancements, plus RAILSIM Load Flow Analyzer SYSTRA Rail operations analysts are performing a full calibration of the upgraded model, using field observations to determine what adjustments must be made in the database to achieve a baseline simulation that accurately depicts ‘a day in the life’ of Metro’s rail operations Metro System converted to RAILSIM 8.1

SFMTA/MUNI Rail Core Capacity and Reliability Study San Francisco, California SYSTRA is providing capacity analyses of the core area of San Francisco MTA’s (SFMTA) rail network, and also analyzing the system’s capability of recovering from various unplanned incidents, including testing a series of remedial measures to address identified issues. As part of this project, SYSTRA is also developing a RAILSIM simulation model of SFMTA’s entire rail network, and will deliver the software, database, and training to SFMTA. Finally, SYSTRA remains on-call to SFMTA to perform additional analyses using the RAILSIM model and software.