ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,

Slides:



Advertisements
Similar presentations
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains S. Bally, O. Beltramello, I. Bergstrom, N. De Bortoli, H.Vincke,
Advertisements

Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
IEFC Workshop February 2010 H. Vincke for DGS/RP 1.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Company "ECO" Services (ТОВ “ЕКО”) Company "ECO" (ТОВ “ЕКО”)
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
Radiation Protection in LS2 D. Forkel-Wirth, P. Carbonez, Y. Donjoux, G. Dumont, A. Goehring-Crinon, S. Roesler, C.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Status of the Design Study Richard Catherall EN-STI-RBS.
INFRASTRUCTURE CHANGES AND UPGRADES Presented by: Fernando Baltasar dos Santos Pedrosa in the name of the four LHC experiments.
Survey Meeting John Osborne, CERN 8 February 2016
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
TE-CRG Activities D. Delikaris, TE-CRG.
Radiation Protection computing tools Gérald Dumont HSE/RP.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains O. Beltramello, H. Vincke, G. Corti on behalf of the Working.
R&D per l’LHC upgrade di fase 2 1 Iniziative verso la fase 2 : USA: Snowmass, (Jul 29 - Aug 6, 2013) HL-LHC Experiment ECFA Workshop, Aix-les-Bains Oct.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LIU / HL-LHC Cost and Schedule Review
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Cabling for LHCb Upgrade
Space Management and Logistics during LS2
Safety in Construction and Upgrade Phases
ATLAS Safety EP-ADO Meeting EDMS: 11 July 2017.
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Accelerator and Experiment Interface Session: LS2, LS3
Upgrade Strategy for the Experimental Vacuum Systems
Radiation Protection Handbook
Presentation transcript:

ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer, O. Beltramello

Workshop Organization 2 main talks (plus discussions) * What are the main issues addressed in this working group * Organizational issues : working group mandate, member list and working plan We will consult within CERN to prepare the workshop with : Other GLIMOs, RP group, Experiments TCs, LHC...

Activation calculation and Radiation Protection 1. Need of additional RP calculations/ estimation for HL-LHC for : * New detectors / equipments calculations * Air activation calculation Assessment of the impact on: - Short access conditions - Ventilation system (Air circulation) - Service caverns shielding - Experimental caverns boundaries ? 2. Contamination assessment (dust, liquids,..): * Amplitude of the problem * Required infrastructure and equipments * Need of instrumentation and sampling * Impact on activities * Destructive work in undergrounds 3. Waste/Operational zoning and management for HL-LHC: * Operational and waste zoning calculation * Cool down areas and storage space requirements * Radioactive workshops requirements

Activation calculation and Radiation Protection 4. Dosimetry Delivery system of operational dosimeters linked to the Access system 5. Experiments strategy to decrease the activation issue for HL-LHC * Equipment / detectors maintenance modifications * Material * Remote handling or robotics use * Shielding Associated schedule Define common development programs between Experiments

Infrastructure and safety systems upgrade and consolidation 1. Ventilation system upgrade: * identify the requirements (air contamination (circulation and exhaust), ageing, control system upgrade,..) * possible upgrade planning for LS2 and LS3 * Remaining overpressure issue in LHCb 2. Upgrade of safety systems * Sniffers ? etc... ? 3. New safety system required ? Timing and duration of the shutdowns driven by : * Physics Needs / Integrated Luminosity * Longevity of detector components * ALARA * Maintenance needs of LHC and experiments Experiments specific issues