Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013.

Slides:



Advertisements
Similar presentations
EMS Checklist (ISO model)
Advertisements

Environmental Management System (EMS)
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
Safety Oversight for SLAC Accelerator Department Operations
Supplementary Training Modules on Good Manufacturing Practice
Session 3 – Information Security Policies
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
ALPHA Project Safety Assessment Document Vladimir Anferov.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
© Palaniappan R Kannan PMP.,CFSE 1 IEC Standard – What is it? IEC is a Standard for the functional safety of Electric / Electronic / Programmable.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
The Electrical Testing of Laparoscopic Instruments WORKSHOP Testing of Medical Devices Mr John Robson Director, Biomedical Engineering Flinders Medical.
Hazards Identification and Risk Assessment
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
1 1. Some recent views ( ) 2 Linac tunnel
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Hitting the Leadership Target Through Leadership and Accountability.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Safety Documentation Formerly an exotic unknown, today part of the work!
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Visit us at E mail: Tele:
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
CDM Construction Design and Management
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.
Essential Requirements of Pool Management Companies
Cryogenic safety organisation at CERN
LIU / HL-LHC Cost and Schedule Review
East Area Renovation Project Team meeting # 2 – EDMS News
Safety Documentation EHN1
HEL – Safety aspects Christelle Gaignant
HSE rules & regulations
East Area Renovation Project team #6 Launch safety agreement
EET 422 EMC & COMPLIANCE ENGINEERING
The ELENA Safety Documentation «time to prepare the safety clearance»
EP Experiments safety validation process Safety Permits
PSS verification and validation
Safety Analysis and Safety Functions
Safety Readiness Review (SRR) Thomas Hansson, ESH
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Safety in the East Area Renovation Project
Risk Management NDS Forum June 23rd 2010.
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013

2 S AFETY R EQUIREMENTS (SR) Safety requirements Control measures refer to internal procedures and checks to be performed Safety file Docs. to be delivered by suppliers/designers… Based on the presentation 13 th September 2012:

3 S AFETY F ILE (SF) Set of documents that allows demonstrating the compliance with the Safety Requirements (SR) SR&SF document for LIU – EDMS: SR & SF Document SR & SF for LIU-PS SR & SF for LIU-PSB SR & SF for LIU-SPS

C ONTENTS OF SR&SF D OCUMENT 4 Main activities Main hazardsRelated safety domainsApplicable chapter(s)**Safety file MagnetsElectric and electromagnetic Ionizing radiation Non-ionizing radiation Thermodynamic Electrical safety Radiation protection Non-ionizing radiation safety Mechanical safety § 5.5 § 5.1 § 5.6 § and § § and § to be defined (RP) § and § § , § , § and § RF systemElectric and electromagnetic Ionizing radiation Non-ionizing radiation Electrical safety Radiation protection Non-ionizing safety § 5.5 § 5.1 § 5.6 § and § to be defined (RP) § and § Power converters Electric Fire Thermodynamic Environment Electric safety Fire safety Mechanical safety Environmental safety § 5.5 § 5.7 § and § § and § § and § § § , § , § and § §

C ONTENTS OF SR&SF D OCUMENT 5 Main activitiesMain hazardsRelated safety domainsApplicable chapter(s)**Safety File VacuumThermodynamic Chemical Mechanical safety Chemical safety § § 5.8 § , § , § § Beam instrumentation Electrical and electromagneticElectrical safety§ 5.5§ and § TransportMechanical Ionizing radiation Mechanical safety Radiation protection Worksite safety § § 5.1 § § and § to be defined (RP) § Electrical systems Electric and electromagnetic Fire Electrical safety Fire safety § 5.5 § 5.7 § and § § ControlsElectric and electromagneticElectrical safety§ 5.5§ and § Worksite Worksite safety Environmental safety § 5.9 §5.11.2, §5.11.3, §5.11.6, §5.11.7, § § , § , § , § , § and § §

SR&SF D OCUMENT 6 EDMS

7 I NTEGRATION WITH NEW S AFETY D OCUMENTATION Study phase Project phase Operational and dismantling phases 1 Safety folder per project (facility) 1 Safety folder = n x Safety files The Safety Folder is composed of 4 parts: 1.descriptive 2.demonstrative 3.operational 4.“records, experience and monitoring” (REM) SR&SF D OCUMENT = L AUNCH S AFETY A GREEMENT

8 1 - D ESCRIPTIVE P ART Brief description of the goal and motivations for the project Technical description of the facility/activity and of its processes as relevant to overall safety aspects; description of its operations, including maintenance requirements Technical description of the infrastructures associated to the safety of the facility Description of the lifecycle of the facility, organizational structures, etc. Provisions for dismantling the facility and for disposing of its components. Project Leader

9 2 – D EMONSTRATIVE P ART Identification of the various hazards related to the facility Assessment of the safety risks and development of the appropriate risk analyses Demonstration that all the technical and organizational risk control measures contribute to the avoidance or mitigation of the assessed risks down to an acceptable level. Safety Requirements EDMS Project requirements Project leader (PL) Technical requirements Other requirements (…) PL + HSE unit “Agreement”

DGS/SEE February 2013 Thank You for your Attention