Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.

Slides:



Advertisements
Similar presentations
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
September 24, 2012 Genesee County Road Commission Dye & Court Roundabout Dye Road and Court Street Roundabout Construction John Daly, Manager-Director.
US 52 Corridor Study Public Meeting November 15, 2010.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Simpson County Travel Demand Model July 22, 2003.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Elk Grove – Rancho Cordova – El Dorado Connector Project Elk Grove – Ranch Cordova – El Dorado Connector Joint Powers Authority Project Briefing JPA Board.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
State Highway 6 Corridor Access Plan. SH 6 Project Description Project Initiated and funded by –City of Houston –Missouri City –City of Sugar Land –Harris.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Highways & Transportation I (ECIV 4333) Course Outline 1 The Islamic University of Gaza Faculty of Engineering Highways & Transportation I (ECIV 4333)
1 Lei Xu Term Project Presentation – CVEN 689 – Spring 2005 CVEN 689 – SPRING 2005 LEI XU May 2th, 2005 hide A GIS-BASED STUDY OF HOW THE HOT LANE IMPLEMENTATION.
Polk Transportation Planning Organization 2035 Mobility Vision Plan Steering Committee - January 28, 2010 Steering Committee Meeting January 28, 2010 Polk.
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Montgomery County Transit Task Force Meeting August 17, 2011.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Lecture Six Radu ANDREI, PhD, P.E., Professor of Civil Engineering
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
Simpson County Travel Demand Model Mobility Analysis November 7, 2003.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco’s Dynamic Traffic Assignment Model Background SFCTA DTA Model Peer Review Panel Meeting July.
Holly Springs Town Center Transportation Study & Plan Stakeholder Meeting # GPA FALL DETERMINING THE RIGHT TOOLS FOR THE JOB ERIC.
Eastside Transit Alternatives Kick-Off Meeting Mesquite City Hall September 11, 2013 Kick-Off Meeting Mesquite City Hall September 11, 2013.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Forecasting and Evaluating Network Growth David Levinson Norah Montes de Oca Feng Xie.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Slide Congestion Management Program Update Presentation to PPLC April 11, 2011.
Traffic Flow Parameters Surface Street Application.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Introduction Study area Existing problem Objective Methodology Results and Conclusions Recommendations.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Chittenden County Metropolitan Planning Organization Communities working together to meet Chittenden County’s transportation needs 30 Kimball Ave., Suite.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Grey County Transportation Master Plan
San Mateo Countywide Transportation Plan update
2040 Long Range Transportation Plan Update
New Hanover Comprehensive Plan
Presentation transcript:

Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee County Road Commission January 24, 2007

Project Schedule Public Meetings – Feasibility Study Public Meetings – Feasibility Study End of January – Kick-off / Informational Meeting End of January – Kick-off / Informational Meeting End of February – Deficiencies / Access Management / Draft Recommendations End of February – Deficiencies / Access Management / Draft Recommendations End of March – Final Feasibility Recommendations End of March – Final Feasibility Recommendations Survey Began Mid-December 2006 Survey Began Mid-December 2006 Preliminary Design Underway Preliminary Design Underway Final Plans, Specifications and Estimates AUGUST 2007 Final Plans, Specifications and Estimates AUGUST 2007

Major Feasibility Study Tasks Collect and Review Traffic and Crash Data Collect and Review Traffic and Crash Data Review Existing and Future Conditions Review Existing and Future Conditions Identify Transportation Goals and Objectives Identify Transportation Goals and Objectives Determine Access Management Strategies Determine Access Management Strategies Recommend Feasible Alternatives Recommend Feasible Alternatives Evaluate Alternatives Evaluate Alternatives Prepare Report Prepare Report

I-75 Corridor Study-Genesee County – 2025 Master Plan, URS November 2002 I-75 Corridor Study-Genesee County – 2025 Master Plan, URS November 2002 Miller Road Signal Coordination and Timing, Parsons Transportation Group, September 2002 Miller Road Signal Coordination and Timing, Parsons Transportation Group, September 2002 I-75 at Miller Road Operational and Access Management Study, Parsons May 6, 2004 I-75 at Miller Road Operational and Access Management Study, Parsons May 6, 2004 Traffic and Crash Conditions Studies, Wayne State University & Office of Highway Safety Planning, October 11, 2006 Traffic and Crash Conditions Studies, Wayne State University & Office of Highway Safety Planning, October 11, 2006 Miller Road Background Studies

Business Stakeholder Interviews General Summary of Comments Prouds Popular Shopping and Restaurant’s Center turn lane Good Traffic Volumes (exposure) Concerns Left Hand Turn Lock Ups Near I-75 it is a mess Congestion,Backups and Crashes 2025 Vision Bad Congestion Competition from other Stores & Internet Congestion scares away customers Governments Role in Securing Vision Fixing the road Possible Service Roads Adding more signals

What is Access Management? Reduce congestion/delay along the Miller Road corridor; Reduce congestion/delay along the Miller Road corridor; Maintain the traffic carrying capacity of the roadway and delay costly capacity improvements where possible; Maintain the traffic carrying capacity of the roadway and delay costly capacity improvements where possible; Reduce the number of traffic crashes; Reduce the number of traffic crashes; Identify access management principles to to reduce delay/improve safety; Identify access management principles to to reduce delay/improve safety; Improve ingress and egress to businesses; Improve ingress and egress to businesses; Coordinate land use decisions; and, Coordinate land use decisions; and, Improve the aesthetic appeal of the Miller Road corridor. Improve the aesthetic appeal of the Miller Road corridor. A Program to control the location, spacing, design and operation of driveways and street connectors to roadways. The objectives are to:

Example Access Management Effects Reduces Stop-and Go Traffic Pattern Reduces Stop-and Go Traffic Pattern Reduces Delay per Vehicle by 15-20% Reduces Delay per Vehicle by 15-20% Reduces Air Pollution/Fuel Consumption by 5-10% Reduces Air Pollution/Fuel Consumption by 5-10% Reduces Conflict Points/Crash Potential by 20% Reduces Conflict Points/Crash Potential by 20%

Example Access Management Sample Conflict Point Diagrams

Intersection Traffic Crash Data

Segment Crashes

Traffic Data

Automatic Traffic Recorder (ATR) Locations

Turning Movement Count (TMC) Locations

Task 1- Establish Community Involvement Program Vehicle Classification Data

Hourly Traffic Distribution

Lennon and Miller Road Turning Movements

Synchro Traffic Model

Future Traffic Population Change ( ) –20% Population Change ( ) –20% Household Change ( ) –18% Household Change ( ) –18% ADT Change/Year ( ) ADT Change/Year ( ) GCMPC/Consultant to run Future Year 2030 Traffic Demand on TransCad model GCMPC/Consultant to run Future Year 2030 Traffic Demand on TransCad model Transit Mode-Share for Work Trips ~1% Transit Mode-Share for Work Trips ~1% Non-motorized Travel Non-motorized Travel

Worse-Case Daily Traffic Volumes

Next Steps Late February Public Meeting Late February Public Meeting Draft Recommendations Draft Recommendations Operations Operations Safety Safety Access Management Access Management Geometrics/Laneage Geometrics/Laneage

Questions and Comments?