HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK www.highspeeduk.co.uk.

Slides:



Advertisements
Similar presentations
Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
Advertisements

A303 Improvement Study Devon County Council. History Numerous plans to upgrade A303 since early 1990’s, none implemented due to: economic uncertainties.
RTS Re-fresh North East Transport Consultative Forum Tuesday 30th October 2012.
FreightVision Austria 2050 ITS and Smart Logistics towards Eco-Efficency Claus Seibt, Independent Expert (formerly Austrian Institute of Technology)
Base Birmingham Connected Transport Tom Magrath Director of Strategy and Policy Centro.
HS2 and Airports Peter Fry, Public Affairs Manager HS2 Ltd CIC Economic & Policy Forum 17 Feb
Priorities for Rail Investment in the East Midlands Andrew Pritchard Director of Policy & Infrastructure February 2012.
Workshop on Infrastructures Key research to solve mobility barriers Claude Dumoulin Bouygues Travaux Publics (France) reFINE core team Industrial Technologies.
QUICKER THAN ROAD, CHEAPER THAN AIR, A PROMISING COOPERATION BETWEEN RAILWAYS AND AIRLINES WORD FROM KLAUS EBELING – Secretary general of European Intermodal.
MTF Rail Development Forum
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
Lent Term Seminars 2012 London and the High Speed Rail debate: How do we get the Right Line? Mark Bostock | 20 February 2012.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Quiz 1: Rail Transport Case Study, 2013 This quiz requires knowledge of the pre-release case study, the issues that lie behind it, and of the Unit 4b specification.
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
Transport Sustainable Mobility and Integrated Planning in Urban Areas: Trade Union Dialogue with Local Authorities Day 2: 5th February 2013, SESSION 1:
High Speed 2 The decision and next steps Jonathan Mitchell.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
25th November 2014 PTRC London 1 Jim Steer Director Greengauge 21 Director HSR Industry Leaders HS2 – more than a railway HS2: Building in the benefits.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
Ultra at Heathrow & beyond BASE April 2013 Presentation by Adam Ruddle, Key Account Manager, Ultra Global PRT.
HS2 Steve Rodrick Chief Officer. Preferred Route The Misbourne Valley.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
Housing Issues for the MAA Carole Hudson – St Helens MBC Cath Green – Liverpool City Council 8 Liverpool City Region MAA:
What Transport for Cambridge? The Sub-Region Development Strategy and Transport Policies.
The Integrated Planning Framework for the Waikato Land UseTransportInvestment Waikato Regional Council Regional Policy Statement Regional Land Transport.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
CHESHIRE & WARRINGTON SUBREGIONAL TRANSPORT STRATEGY Delivering & Sustaining a £35bn Economy.
1 Northern Hub – the business case Duncan Law 26 June 2012.
Connecting England The Report of the TCPA Commission for the Vision of England Professor Sir Peter Hall National Planning Forum 20 June 2006.
BEATTOCK STATION ACTION GROUP 9 October STRUCTURE OF THE RAIL INDUSTRY Railways Act Privatisation of British Railways Broken up into multiple.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October/December2008.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October 08/January 09.
Enterprise & Environment Directorate TRANSPORT FOR REGIONAL GROWTH 5 NOVEMBER 2015 Keith Winter, Executive Director, Enterprise and Environment, Fife Council.
UK Working Group: Territorial Cohesion. Territorial Description: London.
Key factors in the transport policy to encourage better integration Sixty-Third Session of UNECE, Geneva, 30th March 2009 "Economic Integration in the.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
November 30 th London/Spain Webminar: Railway Infrastructure in the UK Spanish construction and railway industry 1 Jim Steer Director & Founder, Steer.
High Speed Two Ltd responsible for developing and promoting the UK’s new high speed rail network
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.
Richard Falconer Managing Director Case Study: Cumbria – Car Clubs and beyond.
Maria Machancoses Programme Director
Rail North Manchester Airport Transport Forum
High Speed Rail Some Development Principles
Midlands Connect: A Pan Midlands Strategic Transport Partnership
A future benefit for the South Cheshire infrastructure
Simon Warburton Interim Strategy Director, TfGM.
Regeneration - Enquiry Question 3
Peter Molyneux Transport for the North.
A future benefit for the South Cheshire infrastructure
East Coast Route Study November 2016 update.
New Public Transport Infrastructure
Why build this new link to Heathrow?
KEYNOTE STAGE SPONSOR.
Direct International Connectivity Project Kelvin
Timeline for developing RTS 2040
Western Rail Link to Heathrow
Presentation transcript:

HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK

HIGH SPEED 2 HS2 original concept: The HS2 ‘Y’ Fast links to London & Birmingham Heathrow spur Link to HS1 No Transpennine link Diagram taken from HS2 Ltd presentation 2013

Stations remote/ disconnected No CO 2 reductions No integration strategy Only 2 tracks in stem Huge environmental issues in Chilterns AONB & other sensitive areas HS2 2010/12

HS HS3 / Northern Powerhouse Incomplete interregional links Poor 2.3 – or lower?? Heathrow spur cancelled HS1 link ‘deferred’ ‘No economic case’ for link to Scotland

HIGH SPEED 2 Doesn’t deliver what it promised Diagram taken from HS2 Ltd presentation 2013

Questions for HS2 Ltd 1.How do you reconcile HS2’s carbon-neutral performance with the 80% CO 2 reduction target of the 2008 Climate Change Act?

2.What railway engineering assessment was made of the M1 corridor & why was Chiltern route & ‘Y-network’ chosen? Questions for HS2 Ltd

1.How do you reconcile HS2’s carbon-neutral performance with the 80% CO 2 reduction target of the 2008 Climate Change Act? 2.What railway engineering assessment was made of the M1 corridor & why was Chiltern route & ‘Y-network’ chosen? 3.Why has no timetable been developed to show how HS2/HS3 and the existing network will work in harmony? Questions for HS2 Ltd

1.How do you reconcile HS2’s carbon-neutral performance with the 80% CO 2 reduction target of the 2008 Climate Change Act? 2.What railway engineering assessment was made of the M1 corridor & why was Chiltern route & ‘Y-network’ chosen? 3.Why has no timetable been developed to show how HS2/HS3 and the existing network will work in harmony? 4.Why have HS2 & HS3 not been designed as an integrated national high speed network? Questions for HS2 Ltd

HS2 has been specified & designed as a stand-alone high speed line But everyone expects it to perform as an integrated network THE HS2 CONTRADICTION Diagram taken from HS2 Ltd presentation 2013

The £60bn question.... How do we design high speed rail to form an integrated national network??

High Speed UK (formerly known as High Speed North)

1.Perform optimally as intercity network, interlinking all primary cities HSUK Design Principles

1.Perform optimally as intercity network, interlinking all primary cities 2.Connect with local networks HSUK Design Principles

1.Perform optimally as intercity network, interlinking all primary cities 2.Connect with local networks 3.Connect with HS1 & airports HSUK Design Principles

1.Perform optimally as intercity network, interlinking all primary cities 2.Connect with local networks 3.Connect with HS1 & airports 4.Coordinate with railfreight strategy HSUK Design Principles

1.Perform optimally as intercity network, interlinking all primary cities 2.Connect with local networks 3.Connect with HS1 & airports 4.Coordinate with railfreight strategy 5.Offer optimum connectivity, capacity, journey time, resilience etc HSUK Design Principles

1.Perform optimally as intercity network, interlinking all primary cities 2.Connect with local networks 3.Connect with HS1 & airports 4.Coordinate with railfreight strategy 5.Offer optimum connectivity, capacity, journey time, resilience etc 6.Comply with all relevant public policy

Principal hubs of UK high speed rail network? 12 primary cities 1 hub airport HIGH SPEED UK

High speed line running north from London? 15 primary cities 1 hub airport LHR BHX, MAN, EDI? Link to Europe HIGH SPEED UK

HSUK primary routes: London-Glasgow high speed spine Avoids Chilterns AONB 4 tracks to Leicester Transpennine spur to Manchester/Liverpool Link to Heathrow Link to HS1 HIGH SPEED UK

Major upgrades in West & East Mids: Top 16 centres fully interconnected 40% ave. journey time reduction Huge modal shift 500Mt CO 2 savings £20 billion cheaper HIGH SPEED UK

The HSUK solution: Fully integrated HS network accessing all major cities & airports ‘Eurogauge UK’ parallel freight network Greater benefits, lower costs, BCR ~5.0 This is what a Regional Powerhouse looks like!! HIGH SPEED UK

1.Perform optimally as intercity network, interlinking all primary cities 2.Connect with local networks 3.Connect with HS1 & airports 4.Coordinate with railfreight strategy 5.Offer optimum connectivity, capacity, journey time, resilience etc 6.Comply with all relevant public policy HSUK Design Principles

The New Exam Questions 1.Perform optimally as intercity network, interlinking all primary cities? 2.Connect with local networks? 3.Connect with HS1 & airports? 4.Coordinate with railfreight strategy? 5.Offer optimum connectivity, capacity, journey time, resilience etc? 6.Comply with all relevant public policy?

1.Perform optimally as intercity network, interlinking all primary cities? 2.Connect with local networks? 3.Connect with HS1 & airports? 4.Coordinate with railfreight strategy? 5.Offer optimum connectivity, capacity, journey time, resilience etc? 6.Comply with all relevant public policy? The New Exam Questions

1.Perform optimally as intercity network, interlinking all primary cities? 2.Connect with local networks? 3.Connect with HS1 & airports? 4.Coordinate with railfreight strategy? 5.Offer optimum connectivity, capacity, journey time, resilience etc? 6.Comply with all relevant public policy? The New Exam Questions

HIGH SPEED UK Challenge We challenge the Government and HS2 Ltd to demonstrate that: HS2 (& HS3) offers the best outcome for UK intercity travel HS2 complies with public policy (cost, CO 2 emissions, land use, inclusivity etc) HS2 has been developed with all necessary due process

We will accept a challenge from: Any MP Any County or District Council Any Unitary Authority to show that HSUK delivers far greater benefits than HS2/3 to their locale. We will demonstrate that HSUK outperforms HS2/3 in every way. HIGH SPEED UK Challenge

Questions for HS2 Ltd 1.How do you reconcile HS2’s carbon-neutral performance with the 80% CO 2 reduction target of the 2008 Climate Change Act? 2.What railway engineering assessment was made of the M1 corridor & why was Chiltern route & ‘Y-network’ chosen? 3.Why has no timetable been developed to show how HS2/HS3 and the existing network will work in harmony? 4.Why have HS2 & HS3 not been designed as an integrated national high speed network?