Enhancement of Single Stretched Wire Measurements of LHC Short Straight Sections Guy Deferne, Nikolay Smirnov, CERN Joe DiMarco, FNAL 14th International.

Slides:



Advertisements
Similar presentations
Sources of the Magnetic Field
Advertisements

BROOKHAVEN SCIENCE ASSOCIATES Abstract Vibrating Wire R&D for Magnet Alignment Animesh Jain, NSLS-II Project The alignment tolerance for a string of magnets.
Alexander Temnykh Cornell University, Ithaca NY, USA
Magnets for the ESRF upgrade phase II
SCU Measurements at LBNL
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
1 Long-term Variation of the Magnet Alignment In SPring-8 Storage Ring Main events of magnet alignment Long-term monitoring Variation of magnet alignment.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
“Magnetic Measurements for Particle Accelerators” International Master in Hadronteraphy, Pavia, 10 May 2013 Page.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
WP2 ESR 2.2 WP2 ESR2.2 Giordana Severino PACMAN WORKSHOP - CERN PCB technology for small diameter field sensing.
S. Russenschuck, CLIC-Workshop, WP2-Pacman, R&D projects on rotating coil probe and stretched wire techniques for CLIC / PACMAN Stephan Russenschuck.
Solenoid-Based Focusing Lens for a Superconducting RF Proton Linac Presentation prepared for AEM 11/08/20101I. Terechkine.
Force on Floating bodies:
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review of tests of superconducting magnets in SM18 - Stephane Sanfilippo AT-MTM-AS Field Quality of MQ. Measured in SM18 Presented by: Stephane Sanfilippo.
Field Quality Working Group-14/12/04 - Stephane Sanfilippo AT-MTM-AS Field Quality measurements at cold. Standard program v.s extended tests. Presented.
1 LHC IR Quadrupole Alignment Experience at Fermilab T. Beale, J. DiMarco, J. Nogiec, P. Schlabach, C. Sylvester, J. Tompkins, G. Velev 28 September 2005.
Measurements and DB meeting 1 December, 2005, Elena Wildner AT/MAS 1 AC/GEO mole measurements Based on outcome from meeting 24/ and Installation.
Author CERN – Geneva – CH Jacques.Dutour 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland 1 / 16 MQW magnets:
End Design Discussion D. Arbelaez (LBNL) Oct. 7,
Magnetic Field Chapter 28 opener. A long coil of wire with many closely spaced loops is called a solenoid. When a long solenoid carries an electric current,
1 J.DiMarco 16Nov2010 LQS01b Magnetic Measurements Results ( preliminary ) J. DiMarco 16Nov2010.
1 / 23 Workshop Chamonix XV January 2006, L'Esplanade du Lac, Divonne-les-Bains S. Sanfilippo Transfer Function of the.
NLC - The Next Linear Collider Project NLC January Video conference Status of Permanent Quadrupoles James T Volk January 18, 2001.
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Magnetic Metrology of SOLEIL Synchrotron S.R. Multipoles IMMW 14, A. Madur Magnetic Metrology of SOLEIL Synchrotron Storage Ring Multipoles A. Dael, P.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
Presentation 7/05/2015 Giordana Severino ESR2.2, WP2 CERN Supervisors Marco Buzio Academic supervisor Prof. Pasquale Arpaia.
Review of the Tests of Superconducting Magnets in SM18 14-January Measurements of Special SSS during production N. Catalan Lasheras Review of the.
Warm-Cold Changes in the Sextupole Harmonic in the Quadrupole Magnets for the BEPC-II Luminosity Upgrade Animesh Jain Brookhaven National Laboratory Upton,
Measurement of LHC Superconducting Dipole and Quadrupole Magnets in Ramp Rate Conditions G.Deferne, CERN Aknowledgements: M. Di Castro, S. Sanfilippo,
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
Rotating Coil Measurement Errors* Animesh Jain Superconducting Magnet Division Brookhaven National Laboratory, Upton, NY 11973, USA 2 nd Workshop on Beam.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Magnetic Field optimization of EPU at TPS
24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
MECH 373 Instrumentation and Measurement
Alignment and beam-based correction
Rigid Bodies: Equivalent Systems of Forces
Validated magnetic data at cold
Stages for the SSW translation system for PACMAN
Advanced Photon Source Upgrade Project:
Magnets for the ESRF upgrade phase II
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
TBL quadrupole mover prototype development
LCLS Undulator Fiducialization
SCU Next Phase Meeting July 8, 2014.
UPDATE ON DYNAMIC APERTURE SIMULATIONS
BASIC DISTANCE MEASUREMENT
Relaxing Quads Roll Alignment tolerance
Compensation of Detector Solenoid with Large Crossing Angle
Energy Calibration of the SPS with Proton and Lead Ion Beams
Magnetic axis tolerances for the SSS magnets
Presentation transcript:

Enhancement of Single Stretched Wire Measurements of LHC Short Straight Sections Guy Deferne, Nikolay Smirnov, CERN Joe DiMarco, FNAL 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland

IMMW142 Content  Introduction – The Single Stretched Wire (SSW) at CERN  Part I - Roll Angle Offset Calibration  Introduction  Case of a centered magnet  Case of a non-centered magnet  Example of calibration  Part II - Integrated Strength (Gdl) Measurements For more details, please see the presentation of N. Smirnov et al, « Focusing strength measurements of the main quadrupoles for the LHC », submitted at the MT19 Conference, 2005)  Introduction  Shape of the wire  Gdl Measurement procedure  Magnetic properties of the wire  System performance  Conclusion

IMMW143 The Single Stretched Wire (SSW) are the reference systems used for the integrated strength and field direction measurements –Three systems operational –All three are similar to the ones used at DESY and at FNAL One of the two stages System installed on a cold bench Introduction The SSW features used at CERN: Warm and cold integrated axis of MQ and associated correctors Integrated strength of MQ and MB at cold Warm and cold integrated roll angle of MQ, correctors and MB  Nearly 500 Short Straight Section (SSS) for the LHC.  All of them are an assembly of different magnets  10 % of those must be magnetically measured

IMMW144 Roll angle offset calibration (1) Introduction  The field direction is one of the essential parameters of the measurement campaign  The SSW systems must be periodically calibrated in sense of roll angle in order to perform fast measurements that fulfill the requirements Two different type of calibration can be used, depending if the measured magnet is centered or not in between the stages Part I – Roll angle offset calibration

IMMW145 Roll angle offset calibration (2) Stages are aligned w/r to gravity with 5µrad resolution Wyler inclinometers zAzA zBzB offset stageA offset stageB α gravity α field α gravity Stage A Magnet Stage B If z A =z B AND α field =α gravity (reference magnet), then Swapping stages Introducing the system offset in the calculation allows to perform absolute angle measurement without swapping the stages Case of a centered magnet If z A =z B, then Absolute field direction w/r to gravity: System offset:

IMMW146 On cold benches, the magnet is NOT centered in between the stages Inside an SSS, the different magnets are located at different longitudinal positions Layout of the magnets inside an SSS Stage A Stage B MQ MSCB MO/MQT 2.94m 4.975m 6.849m 11.68m Roll angle offset calibration (3)Case of a non-centered magnet (1)

IMMW147 Roll angle offset calibration (4) Simply swapping the two stages as for a regular absolute offset calibration is not sufficient; the variation of the offset along the longitudinal position must be taken into account During the calibration, one of the stage is placed closer to the magnet A stage B stage Reference quadrupole SSW stages installed on the calibration bench Case of a non-centered magnet (2) If z A ≠z B, then where:z is the distance from stage A to the magnet center and l is the distance between the stages

IMMW148 Roll angle offset calibration (5) The roll angle offset parameter is updated for each type of magnet, in each SSW system. Example of calibration

IMMW149 Integrated Strength (Gdl) (1) A second essential parameter of the measurement campaign is the integrated gradient (Gdl) of quadrupoles This is one of the most challenging magnetic parameters of the LHC magnets –Required absolute error (Magnetic measurement): 5[units] –Required repeatability (Magnetic measurement):< 5 [units] For the Stretched Wire Systems, this means an error on the wire positioning less than 2.5µm over 12m! Introduction Only a proper method and good properties of the wire can give results inside specifications Part II – Integrated Strength (Gdl) measurement

IMMW1410 Integrated Strength (Gdl) (2)Shape of the wire (1) The position of the wire at the stages is known within 1 µm, but inside the magnet, the wire is deflected by magnetic forces and gravity Therefore, the weight of the wire and its magnetic properties must be taken into account. Magnetic forces Gravity Stretched wire Vertical position of the wire: Horizontal position of the wire: T is the wire tension w is the mass per unit of length F mag is the magnetic force. Where: Note: the sign of the force F mag depends on the magnetic properties of the wire and its location in the field with z is the longitudinal position w is the wire weight per unit of length G the gradient of the field D the wire displacement  is the wire susceptibility T is the wire tension Where: Possible solutions of (1): (1)

IMMW1411 Note: Integrated Strength (Gdl) (3)Shape of the wire (2) Sag of the wire: As tension measurement is affected by friction problems and gauge accuracy, the SSW system measures the fundamental frequency of the wire, which includes its mechanical properties B stage A stage

IMMW1412 Integrated Strength (Gdl) (4)Gdl measurement procedure Dependence of transfer function as a function of wire tension with CuBe wire 0.13mm diam The Gdl obtained from a horizontal movement, can be calculated from the linear fit of different wire tensions. The Gdl obtained from a vertical movement must be calculated from the parabolic fit of different wire tensions. The parabolic term of the polynomial expansion comes from the sag of the wire:, To cancel the effect of the magnetic forces, the value of the strength is calculated from the extrapolation of Gdl = f(1/f 2 ) at the interception of the axis, where 1/f 2  0 (infinite tension) Note:

IMMW1413 Integrated Strength (Gdl) (5)Magnetic properties of the wire Four different wires have been tested: 1.  0.1mm CuBe wire from California Fine Wire Co, USA 2.  0.1mm Mg wire from California Fine Wire Co, USA 3.  0.13mm CuBe wire from Goodfellow Co, UK 4.Carbon fiber strand from Toho Tenaz Europe gmbh, type HTA5241 (5). (  0.078mm silicon carbide, type SCS-9A from Speciality Materials Co, USA) (Note: type 5. could not be magnetically tested because of its high rigidity) Wire 0.76kA5kA11.85kAχ CuBe 0.1mm >0 Mg 0.1mm >0 CuBe 0.13mm <0 Multi filament Carbon strand --380<0 Slopes of strength for different types of wire in [T/s 2 ] CuBe Carbon fiber HTA5241 SCS-6 Silicon Carbide Different type of tested wire Note: if strength rises when tension increases, wire is diamagnetic If strength falls when tension increases, wire is paramagnetic

IMMW1414 The error on the extrapolation is proportional to the slope The lower is the susceptibility, the smaller is the random error on Gdl Integrated Strength (Gdl) (6)System performance (1)     Gdl 1/T 1. Random error Typical random error vs Gdl Gdl stdev at interception point Total random error Contribution of the slope (magnetization of the wire) Qualification of two SSW systems Parameter/SSW UnitsSSW#1SSW#2 δ noise units*T η slope units*T * *10 -9 Gdl lower acceptable limit (5units at one sigma) T4280 As Gdl at injection is 44T, its measurement can be performed only with certain statistic InjectionNominal Tolerance limit Dev(Gdl) [units]

IMMW1415 Integrated Strength (Gdl) (7)System performance (2) 2. Systematic errors Estimated contribution Powering of the magnet:<0.1[units] Amplifier and integration:<0.1[units] Main field errors:<0.2[units] Stray field (on cold test benches):  2.3[units] Alignment of stages: <1[units] Wire susceptibility:<2[units] ____ Total (rms)<3.2[units ]  A cross calibration with a system that uses a different method of Gdl measurement could give a valuable confirmation of the systematic error of the SSW systems performances  The twin shafts and the automated scanner (both are rotating coils systems) used in SM18 cannot guaranty so far better than 20 [units] of absolute error  Thus an estimation of the all possible and known sources of systematic error is used to qualify the SSW systems at CERN

IMMW1416 Conclusion A special method has been developed to measure the integrated strength (Gdl) of the LHC MQ with an accuracy within the specification (even though a statistical study is required at injection field) Gdl measurements: AbsoluteRandom Error specifications:5 [units] 5 [units] Error obtained:est. <3.2[units]<5[units] Different wires have been tested for their magnetic and mechanical properties and one type, the 0.13mm diam. CuBe from Goodfellow Ltd, has been chosen for the LHC measurements As we have shown that not any wire can be used for Gdl measurements, the search for wires with a lower susceptibility will continue A procedure has been developed to calibrate the roll angle offset of the Single Stretched Wire systems as a function of the magnet longitudinal position. This allows to measure the field angle w/r to gravity of the main quadrupoles and correctors magnets installed in an Short Straight Section without any swapping of the system stages. Roll Angle Calibration Integrated Strength