H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.

Slides:



Advertisements
Similar presentations
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Advertisements

Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
NLC - The Next Linear Collider Project Leif Eriksson 10/11/99 NLC BD VACUUM Thermal Outgassing Rate for Various Beam Line Materials.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
Linac4 Ion Source commissioning: Vacuum Aspects C.Pasquino, N.Thaus, J.Hansen, P.Chiggiato Linac4 Ion Source Review - 14th November 2013.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Vacuum sectorisation H- Injection Some history Wim Weterings
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
New Fast Wire Scanners in 4L1 and 11L1 - Vacuum outgassing measurements and vacuum pressure simulations – (Friederike Salveter, Jose Antonio Ferreira Somoza,
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
ESS-Bilbao: MEBT vacuum standarization
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Outgassing Test and the Getter Specification
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Vacuum for DTL G.Vandoni on behalf of the TE/VSC Linac4 team 13 September, 2011G.Vandoni, TE-VSC1 Acknowledgements M.Malabaila, J.Hansen, A.Mongelluzzo,
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Studies on 2.45 GHz microwave ion sources Abhishek Nag IISER, KOLKATA Presented By: G.O. Rodrigues IUAC, New Delhi Supervised By:
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
τ- Charm Vacuum System Preliminary
Vacuum System P. Chiggiato TE-VSC
Subject: INJECTION SYSTEM Junction LINAC4-booster
Sub-system integration for the VBOX
1.3-GHz Cavity Vacuum Furnace at IB4
ELENA installation and commissioning status
RTML Vacuum System RDR Summary FermiLab October 24, 2007
SAES Project: Combination of NEG module and sputter ion pump
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
Challenges of vacuum chambers with adjustable gap for SC undulators
Leak Detection Tutorial Work
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
COOLING & VENTILATION INFRASTRUCTURE
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Thermal Outgassing Rate for Various Beam Line Materials
XFEL Collimation and Beam Switchyard Vacuum Issues
Presentation transcript:

H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013

Outline PSB H 0 -H - injection vacuum layout; Graphite Vs SiC dump: resume; Update on simulations with new cooling system; Conclusions and actions. PSB - H0-H- injection review meeting, 18th April 2013

Linac 4 H - PSB ring RF shield Stripping foil Internal dump SiC or Graphite 75 l/s SIP PSB H- Injection: vacuum layout PSB - H0-H- injection review meeting, 18th April 2013

Previous results resume P = 3*10 -9 mbar P = 6*10 -9 mbar ACTIONGRAPHITESiC Vacuum firingYesNo IN situ Bake –out (after each venting) YesNo Active CoolingYes PSB - H0-H- injection review meeting, 18th April 2013

Influence of the new cooling system Max. steady state temperature on chamber/flange: 88 °C for SiC and 83 °C for Graphite PSB - H0-H- injection review meeting, 18th April 2013

Influence of the new cooling system Many parameters are involved in the definition of an acceptable temperature from the vacuum point of view: the materials, the heating rate, the pumpdown time. Water vapor outgassing at 100 hours of pumpdown (a week of pumping); Outgassing at 75 ◦C from the SiC; BSW4 surfaces at 80 ◦C and 50 ◦C; PSB - H0-H- injection review meeting, 18th April 2013

Influence of the new cooling system After a transient of few days of heating, the water vapor is released by the surfaces: H 2 from the bulk is leading (H 2 stainless steel outgassing). The difference between the two temperature is very low. PSB - H0-H- injection review meeting, 18th April 2013

Actions and conclusions The influence of the temperature has been studied in order to evaluate the vacuum impact: the choice of the final material of the vacuum chamber, the pumpdown time before beam impact, the heat rate are playing a fundamental role; With the boundary conditions considered above, only an active cooling leading to a surface temperature around 50 ◦C allows to stay within the vacuum requirements from the early stage of the heating; Finally some outgassing loads are still unknown (stripping foil mechanism) and need to be evaluated. PSB - H0-H- injection review meeting, 18th April 2013

Period 1 (new injection) Sector valves (old) 8 x Sector valves (new) 8 x Ion pumps (new) 8 x Gauges (new) -Pumping group -Venting system(old) - 4 x Pumping group (new) -4 x Venting system(new) Gauges and pumps (old)

Period 1 (new injection proposal) Sector valves (old) 4 x Sector valves (was 8) 8 x Ion pumps (new) 4 Gauges (was 8) -Pumping group (old) -Venting system(old) - 4 x Pumping group (new) -4 x Venting system(new) Gauges and pumps (old) Advantage: -More room for shielding. -Easy to vent and pumps without breaking foils. (big volume) -Leak detection, venting and pumping away from hot zone. Sector approximately 9 meters (Fast Wire scanner not part of sector so only fragile object is the striping foil).