Basement Flooding Improvement Program Town Hall Meeting, Ward 33 May 21, 2009.

Slides:



Advertisements
Similar presentations
Earth Control Measures at Project Detail Site Location Marina Barrage.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
THE STATE OF THE CITY Presented to The League City Chamber of Commerce and Business Association February 13, 2004.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
UPPER SLIDE RAVINE WORKSHOP City of Grass Valley September 29, 2009.
Keeping you updated In your neighbourhood… General public notice of upcoming work issued door-to-door Signs will be posted to give general information.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Where does all that rain go? Stormwater Management in London.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
Management of Surface Water in Severe Weather Conditions from the Highway GORDON HUNT COUNTY DRAINAGE ENGINEER for OXFORDSHIRE COUNTY COUNCIL.
MMSD’s Infiltration and Inflow Private Property Program Purpose of the program is to reduce infiltration and inflow from private property to.
Non Powell Bill Street Repair & Maintenance Strategies October 8, 2012.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Groundwater Flow Problems in Colorado Springs (… or, it’s why they call it “the Springs”) 1.
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
Connecticut Department of Energy and Environmental Protection.
OPTIMUM COATING SOLUTIONS OPTEK PRODUCTS CEMETITIOUS COATINGS AND ADDITIVES Brief overveiw.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: NORTHEAST BOUNDARY NEIGHBORHOOD PROTECTION PROJECT FIRST.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Storm Water Pollution Prevention Training
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.
Septic Systems and New Homeowners GET PUMPED !. Overview Properly functioning septic systems are highly effective in treating wastewater 25% of the U.S.
S A V E - R - B A Y North Bay Watershed Association September 11, 2009 Lateral Program Update Seeking to Resolve a Difficult Public / Private.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
September 2005Urban Planning Carleton University 1 Drainage Systems _____________________________.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Houston Land/Water Sustainability Forum David W. Peters, P.E., CFM, D.WRE February 6, 2008.
EA204 Environmental Technology Stormwater Management Lot Grading & Easements.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
August 4, 2008 Smoke Testing Public Informational Meeting Smoke Testing Project – University/Prior Avenue Area Hamline Midway Library August 4, 2008 Short.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
Community Presentation. 2 What is it? Currently runoff flows through storm drains at Redondo Ave. and Ocean Blvd. into the Pacific Ocean. The Low Flow.
Fixing Our City’s Old Sewers How the state is helping In early 2015, New Jersey issued new permits to the 25 communities and sewage treatment plants that.
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
Effectiveness of Private Property Infiltration and Inflow Reduction efforts in East Tosa October 14, 2014: Wauwatosa Budget and Finance Committee Meeting.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
Unit 209: Drainage systems
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Comprehensive Sewer Planning Update Meeting M. Chris Swartz, Village Manager Mustafa Emir, Village Engineer March 23, 2015.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Stormwater Management
Welcome to the Libertyville Stormwater Master Plan Open House
Comprehensive Sewer Planning Update Meeting
NC Division of Water Infrastructure Drinking Water Grant
Public Information Centre Slides July 23 and August 11, 2008 Storms
Where does all that rain go?
Site Design •Project Site context Module 3: •Site Analysis
Sewer Infrastructure Watuppa Plantations Development
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
[OUR CITY NAME]’S OLD SEWERS
MS4 OVERVIEW 2015.
Fixing Our City’s Old Sewers
City of Spruce Grove Capital Region Partners Presentation 2019
Presentation transcript:

Basement Flooding Improvement Program Town Hall Meeting, Ward 33 May 21, 2009

Background Major flooding reported in August 19, 2005 City workplan to address areas of chronic flooding; 31 study areas Study Areas 29 and 30 among first to be examined Studies were completed in August 2008

Our sewer system performs as designed (for “normal” storm conditions) During extreme storms – sanitary sewer system is overloaded; surface flooding on private property Many older developed areas do not have proper overland flow routes; resulting in low points with no outlet for water City has adopted a higher level of protection against basement flooding for both the sanitary & storm sewer systems Our Findings

Overland Flow Paths Cactus Ave. Homewood Ave. Patricia Ave. Peckham Ave.

General Surface Patricia Ave. Cactus Ave.

Overland Flow Paths Cactus Ave. Homewood Ave. Patricia Ave. Peckham Ave.

Lot Level Controls Downspout disconnection Proper lot grading Installation of backwater valves on sanitary lateral Capping off storm laterals & installation of sump pump Repair cracks in foundation walls & sealing window wells Covering basement stairwell Disconnecting “illegal” sanitary sewer connections Need homeowners to help take action! Recommended Solutions

Surface Flow Controls Catchbasin Inlet Control Increased No. of Catchbasins Sealing Maintenance Hole Covers Flow Path Diversion Recommended Solutions

Pipe Controls (Storm and Sanitary) Increasing Sewer Pipe Size Adding new sewers (twinning)

Recommended Solutions Storage for Sanitary and Storm Underground tanks within the sewer system Underground storage tank: - Old Sheppard Park, Dallington Park, Pinto Park Dry pond at Muirhead Park

Over 300 improvement works Five-year timeframe for investing more than $200 million Work will be constructed according to the priority approved by City Council –Highest priority is for sanitary sewer improvements –Storm system improvements where the cost is $25,000 or less per benefiting property will be prioritized –Projects greater than $25,000 will be combined with other City infrastructure renewal programs City-wide Implementation Plan

Cost of Improvements (Study Areas 14, 28, 29 & 30 only) Total Cost: $272 million; $195 million for Priority Areas Ward 33: 17 works; $52 million Sanitary Sewer Upgrades16 works$6 million Sanitary Storage Tanks13 works$14 million Storm Drainage Upgrades261 works$163 million $100 million (priority areas) Storm Sewer Storage Facilities 10 works$47 million $33 million (priority areas) Lot level controls$42 million

Our 2009 Workplan Since last year, we have been working on: –Developing a schedule for all the works –Coordinating with various agencies –Surveying the sites –Developing detailed engineering plans Contractors to be hired in fall 2009 to begin work Sanitary sewers will be replaced along: –Shaunghnessy Blvd, Leith Hill Rd, Esterbrook Ave Storm sewers replaced along: –Edmonton Rd., Ipswich Cres

Pre-engineering underway for storm sewer replacement along: –Seneca Hill Dr, Silas Hill Dr, Van Horne Ave, Oshea Cres –Corning Rd and Lesgay Cres –Grove Park Cres and Glentworth Rd –Shippigan Cres and Dallington Dr –Axsmith Cres –Deerford Rd and Hobart Dr –Gleneagle Cres, Sandbour Cres, Baroness Cres –Gleneagle Cres, Allenbury Cres, Kingslake, Lisburn, Kempsell, Houston –Faye Drive and Edmonton Dr –Brian Drive, Pleasant View Dr, Old Sheppard Ave, Cairnside Cres Work involves approvals/permits by conservation authority and province 2009 and Beyond