Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
DC/DC Converters Markus Friedl (HEPHY Vienna) B2GM, 14 March 2012.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Power Distribution Studies at Fermilab Aida Todri, FNAL ATLAS/CMS Power WG Meeting March 31 st, 2010.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Layout of the Power Distribution on Support Tube for Phase I Lutz Feld, Waclaw Karpinski, Katja Klein, Jan Sammet, Michael Wlochal.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Power Supply of Front-End Electronic in RICH/TORCH Upgrade Rui Gao, University of Oxford LHCb Upgrade Electronics Meeting 14 th April, 2011, CERN.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Design & test of SciFi FEB
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
STGC Front end boards sTGC Front end boards NSW Electronics workshop November 2013 L. Levinson Weizmann Institute NSW Electronics workshop, November 20131L.
A complete DC/DC converter ASIC for LHC upgrades S. Michelis, F. Faccio, G. Blanchot, I. Troyano CERN PH-ESE S.Saggini University of Udine, Italy Twepp.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
D. Bertrand, J. De Bruyne, P. De Harenne, L. Etienne, S. Hannaert, G. Van Beek The Arch.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
Upgrade of the TileCAL LVPS System Gary Drake Argonne National Laboratory, USA In Collaboration with The University of Chicago CERN Feb. 25, 2009 ATLAS.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
LHCb Outer Tracker Upgrade Actel FPGA based Architecture 117 januari 2013 Outline ◦ Front end box Architecture ◦ Actel TDC ◦ Data GBT interface ◦ Data.
Current STS Readout Concept 1 FEB 8 STS-XYTER Electrical Interface SLVS/LVDS pairs/FEB ROB GBTx / VL Optical Interface 4 MM fibers /ROB DPB.
LHCb Outer Tracker Electronics 40MHz Upgrade
ETD PID meeting We had many presentations dedicated to the PM test .
General aspects: Optical links :
UT Optical Connections
ALICE Muon Tracking Upgrade EDR Answers
RPC HV&LV systems Introduction Detector description Requirements
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
HCAL HV splice box.
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014

OT Wiener Maraton systems ◦ 72 outputs * 300W = 21.6kW ◦ 6 power boxes,12 channels per power box Wiener output max 8v/50A ◦ But: 1v margin needed for cable voltage drop (25m+25m) ◦ Currently configured Vout = 7V, voltage at front end +/- 6V Detector power for 432 front-end boxes + controls: 11kW LV Power supplies LV Power supplies Wilco Vink 219 May 2014

Wilco Vink 319 May 2014 LV distr box1 LV distr box2 LV distr box1 FE Boxes 6 rectifiers and controllers 6 power bins in bunker below trackers 3 C-side 3 A-side Shielding Wall FE Boxes Low voltage cabling TO each C-frame 12  35 mm 2

Thick cables to detector distribution box ◦ 25m*2 35mm2 for 27A  For upgrade up to 45A Thin cables from distribution box to FE- modules/ROB ◦ 8m*2 2.5mm2 ◦ 9 FE-modules  6 ROB Same supply cabling for upgrade Wilco Vink 419 May 2014 Wiener1: +6V/45A Wiener2: +6V/45A Wiener3: +6V/45A Wiener4: +6V/45A Wiener5: +6V/45A Wiener6: +6V/45A Wiener7: +6V/45A 12 Cframes LV distribution boxes

FEASTMP DC-DC converters Power requirements not yet all known, expected to have more details from test results Q3/Q ◦ Test of PACIFIC2 with analog and digital circuits second half of this year ◦ Microsemi FPGA, proto boards planned for Q Upgrade FE consumption Wilco Vink 519 May 2014 Cern DC-DC converter ◦ Specifications  Vin=5-12V  Vout=0.6-5V  Iout<=4A  frequency=1.8 MHz Power supplies needed for front-end modules ◦ 1.2v:  GBT-SCA  Microsemi FPGA core voltage ◦ 1.5v:  GBT 1.5V  Microsemi FPGA  PACIFIC ◦ 2.5v:  LD VTTX 2V / 0.15 A  TIA VTRx 2V / 0.1 A  Microsemi FPGA 2.5V / 0.5A, 4*= 2A

Per ROB worst case, not all front-end boxes will be equipped with all data GBT’s transmitters ◦ PACIFIC/Microsemi FPGA unknown (??W) ◦ 16 GBTx 1.5V/728mA (~17.5W) ◦ 16+1 LD 2.5V/0.15A (~6.4W) ◦ 1 TIA 2.5V/0.1A (0.25W) ◦ 2+8 SCA 1.2V 0.1A (0.12W) ◦ 2 Master GBT chipset : 2W (4W) Total per ROB: (28W + unknown) DC/DC FEASTMP converters efficiency ~75% Upgrade FE consumption Wilco Vink 619 May 2014

Reuse the OT Maratons Additional Wiener power boxes in tunnel ◦ Extra Maraton systems ◦ Extra thick supply wires from power box in bunker to LV- distribution box on detector ◦ New distribution box (no of connections and only positive voltages) Upgrade of the LV Wilco Vink 719 May 2014

CEAN experiment multichannel system SY1527LC HV supply boards: A1833BPLC, double width, using 28 HV channels with positive polarity Cabling: ◦ 48 long-distance multi-wire cables ◦ 12 Cframes x 4 cables/Cframe ◦ from Patch panels in D3 to the C-frames are connected to the HV power supplies by means of two junction boxes, one per detector side(located: D3-D03) OT HV power supplies and distribution Wilco Vink 819 May 2014 Most of this not usable for SciFi!

100v Max. required ◦ 50mV resolution  30V for KETEK SiPM  65V for Hamamatsu Total number of HV channels: ◦ 288 Read Out Boxes * 16 SiPM’s ◦ Share a HV line per 4 SiPM’s (1152 HV channels)  Assuming:  sufficient current available  good uniformity among SiPM array Vbd  good temperature uniformity Ordered for SiPM EPFL ◦ Caen 32 10mA channels, per module ◦ 8 modules per crate 10mA per output  Planned for the final system 15mA / channel HV for upgrade Wilco Vink 919 May 2014 Guido Haefeli (EPFL) looking into HV system for SiPMs

LV supplies ◦ We can reuse the Wiener Maraton power supplies (assuming maintenance contract ok!)  Re-configure the Negative output to positive ◦ We need additional power supplies and cabling ◦ Voltage drop over thick cables will increase with higher currents  less margin ◦ Q3/Q will give us a better view of total power HV supplies ◦ OT HV modules not usable for upgrade (mainframe?) ◦ (re)use of cabling needs further study Conclusion Wilco Vink 1019 May 2014