IPv6 testing plans 25 Jan 2013. Short term – next 6 weeks Add sites to testbed – Glasgow (DPM storage end point) – Fix DESY – Others? Is GridFTP mesh.

Slides:



Advertisements
Similar presentations
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
Advertisements

LCG Tiziana Ferrari - SC3: INFN installation status report 1 Service Challenge Phase 3: Status report Tiziana Ferrari on behalf of the INFN SC team INFN.
The HEPiX IPv6 Working Group David Kelsey GridPP29, Oxford 27 Sep 2012.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPiX, Oxford 24 Mar 2015.
1 INDIACMS-TIFR TIER-2 Grid Status Report IndiaCMS Meeting, Sep 27-28, 2007 Delhi University, India.
The EDG Testbed Deployment Details The European DataGrid Project
G RID SERVICES IP V 6 READINESS
SSC2 and Update on Multi-user Pilot Jobs Framework Mingchao Ma, STFC – RAL HEPSysMan Meeting 20/06/2008.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
Southgrid Technical Meeting Pete Gronbech: 16 th March 2006 Birmingham.
Computing and LHCb Raja Nandakumar. The LHCb experiment  Universe is made of matter  Still not clear why  Andrei Sakharov’s theory of cp-violation.
Oxford STEP09 Report Ewan MacMahon/ Pete Gronbech HEPSYSMAN RAL 2nd July 2009.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) 1 July 2011 UK HEP Sysman meeting.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
The HEPiX IPv6 Working Group David Kelsey HEPiX, IHEP Beijing 17 Oct 2012.
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
FP6−2004−Infrastructures−6-SSA IPv6 and Grid Middleware: the EUChinaGRID experience Gabriella Paolini – GARR Valentino.
IPv6, the Protocol of the Future, Today Mathew Harris.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
The production deployment of IPv6 on WLCG David Kelsey (STFC-RAL) CHEP2015, OIST, Okinawa 16 Apr 2015.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPiX, Ann Arbor MI 30 Oct 2013.
The HEPiX IPv6 Working Group David Kelsey EGI TF, Prague 18 Sep 2012.
Andrew McNabETF Firewall Meeting, NeSC, 5 Nov 2002Slide 1 Firewall issues for Globus 2 and EDG Andrew McNab High Energy Physics University of Manchester.
Wahid, Sam, Alastair. Now installed on production storage Edinburgh: srm.glite.ecdf.ed.ac.uk  Local and global redir work (port open) e.g. root://srm.glite.ecdf.ed.ac.uk//atlas/dq2/mc12_8TeV/NTUP_SMWZ/e1242_a159_a165_r3549_p1067/mc1.
Maarten Litmaath (CERN), GDB meeting, CERN, 2006/02/08 VOMS deployment Extent of VOMS usage in LCG-2 –Node types gLite 3.0 Issues Conclusions.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
The HEPiX IPv6 Working Group David Kelsey WLCG GDB, CERN 14 Nov 2012.
CERN Using the SAM framework for the CMS specific tests Andrea Sciabà System Analysis WG Meeting 15 November, 2007.
Light weight Disk Pool Manager experience and future plans Jean-Philippe Baud, IT-GD, CERN September 2005.
“From IPv4 to eternity”: the HEPiX IPv6 working group CHEP2012, New York 21 May 2012.
Jens G Jensen RAL, EDG WP5 Storage Element Overview DataGrid Project Conference Heidelberg, 26 Sep-01 Oct 2003.
HEPiX IPv6 Working Group David Kelsey GDB, CERN 11 Jan 2012.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
EGEE is a project funded by the European Union under contract IST VO box: Experiment requirements and LCG prototype Operations.
VO Box Issues Summary of concerns expressed following publication of Jeff’s slides Ian Bird GDB, Bologna, 12 Oct 2005 (not necessarily the opinion of)
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
The GridPP DIRAC project DIRAC for non-LHC communities.
The HEPiX IPv6 working group David Kelsey (STFC-RAL) HEPiX meeting, Bologna 17 Apr 2013.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
A. Mohapatra, T. Sarangi, HEPiX-Lincoln, NE1 University of Wisconsin-Madison CMS Tier-2 Site Report D. Bradley, S. Dasu, A. Mohapatra, T. Sarangi, C. Vuosalo.
The DataGrid Project NIKHEF, Wetenschappelijke Jaarvergadering, 19 December 2002
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
WLCG and IPv6 David Kelsey (STFC-RAL) LHCOPN/LHCONE, Rome 28 Apr 2014.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
8 August 2006MB Report on Status and Progress of SC4 activities 1 MB (Snapshot) Report on Status and Progress of SC4 activities A weekly report is gathered.
The GridPP DIRAC project DIRAC for non-LHC communities.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
The HEPiX IPv6 Working Group David Kelsey HEPiX, Prague 26 April 2012.
WLCG: Are we ready for IPv6? David Kelsey (STFC-RAL) ISGC 2014, Taipei 26 Mar 2014.
“From IPv4 to eternity” - the High Energy Physics transition to IPv6 David Kelsey TNC2012, Reykjavik 23 May 2012.
HEPiX IPv6 Working Group David Kelsey david DOT kelsey AT stfc DOT ac DOT uk (STFC-RAL) HEPiX, Vancouver 26 Oct 2011.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI IPv6 Report for HEPiX March 16, 2012 HEPiX IPv6 WG Meeting n.14 CERN.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) EGI OMB 19 Dec 2013.
UK Status and Plans Catalin Condurache – STFC RAL ALICE Tier-1/Tier-2 Workshop University of Torino, February 2015.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
WLCG IPv6 deployment strategy
The EDG Testbed Deployment Details
IPv6 update Duncan Rand Imperial College London
Presentation transcript:

IPv6 testing plans 25 Jan 2013

Short term – next 6 weeks Add sites to testbed – Glasgow (DPM storage end point) – Fix DESY – Others? Is GridFTP mesh still useful? Understand Tony’s performance problems Tony will test on IPv4 CMS – PhEDEx with DPM – Other storage? LHCb tests – Glasgow, RAL – job submission & CVMFS Lxplus at CERN?

SL5 or SL6? Short term – use sl5 There are advantages moving soon to SL6 soon – And coupled with install of new version Globus – Rebuilding FTS needs to be done again But with EMI version – not FTS V3 Ramiro will install SL6 and GridFTP next week General approach – always use latest released versions (e.g. Globus, GridFTP, …)

Testing on production resources Phase 1 – confidence that dual-stack breaks nothing – production in IPv4 – Limited number of node types – Limited number of sites – What? When? After the summer conferences? Or a few sites before then? – One site – CE, another site - SE – Need suitable logging for post-mortem – If it works we could leave on to allow more IPv6-testing – How much advance testing do we need on our testbed? Phase 2 – Functionality and performance testing for IPv6 of the CERN “model” – More node types – More sites – When? Phase 3 – Complete 24 hour test – Turn on dual stack everywhere – When?

What end point are we aiming for? All required services dual stack Allow for IPv6 only clients – Worker nodes – UI? – Others? CERN worker nodes will need access to AFS servers at CERN Do we assume there will always be a Phase IV non-routable address too? What do we have to do about tunnels, proxies etc? Do we worry about WMS, LRMS? Pilot job frameworks? Virtual machines?

Off-site Services required by IPv6-only worker nodes? SEs Experiment pilot job frameworks Dual stack on all public-facing services At what point do we require all Tier 1 and all Tier 2 to be able to route IPv6, DNS etc. Do we need UI on IPv6? - Assume no