Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance.

Slides:



Advertisements
Similar presentations
Westar Energy Smart Grid
Advertisements

Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
A Virtual Power Quality Test Lab Victor Wong Senior Vice President, Transmission Sarawak Energy Berhad.
Frankfurt (Germany), 6-9 June 2011 André Postma – Netherlands – RT.1b SM components "Smart Grid Components"
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Distributed Intelligence Provides Self-Healing for the Grid
and Trend for Smart Grid
Frankfurt (Germany), 6-9 June 2011 Douglas Wilson Psymetrix Ltd, UK Douglas Wilson Psymetrix Ltd, UK D. Wilson – UK – Session 4 – Paper ID 0497 Connection.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
Ee392n - Spring 2011 Stanford University Intelligent Energy Systems 1 Lecture 3 Intelligent Energy Systems: Control and Monitoring Basics Dimitry Gorinevsky.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Distribution Management System Implementation at Florida Power & Light
Distributed Power Systems ELCT 908
© 2011 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.August 8, 2015 Infotech Service Offerings Rajnish.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
August 8, 2015ECI Confidential. AccessWave Smart Grid Market Trends& Applications Matthias Nass VP Field Marketing EMEA.
SUBSTATION MODELING: PROTECTION AND AUTOMATION
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Supervisory Systems.
1 A. Lipsky, N. Miteva, E. Lokshin Department of Electrical and Electronic Engineering Ariel University Center of Samaria Israel Electric Power Quality.
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
ABB Switzerland Ltd. Christoph Haederli
College of Engineering and Architecture Using Information to Increase Power Reliability and Reduce Vulnerability Anjan Bose Washington State University.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Barcelona– May 2003 CIRED’2003 Beta session 4a: Distributed Generation Controllability of DG helps managing Distribution Grids J. A. Peças Lopes
Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
Frankfurt (Germany), 6-9 June 2011 MOCCI – IT – RIF Session 5 – Paper 999 Multi-Objective analysis of Regulatory frameworks for Active Distribution Networks.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
Manjula Dewadasa Arindam Ghosh Gerard Ledwich
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
An Overview of the U.S. Electric Power Grid Generation Choices, Reliability, Challenges Tom Ferguson, P.E. Adjunct Instructor Dept. of Electrical Engineering.
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
Frankfurt (Germany), 6-9 June 2011 M. Khederzadeh Power & Water University of Technology (PWUT) Tehran, IRAN. M.Khederzadeh – IRAN – RIF S3 – Paper 0066.
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Frankfurt (Germany), 6-9 June 2011 Detailed Analysis of the Impact of Distributed Generation and Active Network Management on Network Protection Systems.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
Frankfurt (Germany), 6-9 June Astrid Petterteig, SINTEF Energy Research, Norway – Paper 0840 Presented by Dag Eirik Nordgård, SINTEF Energy Research.
1 © A. Kwasinski, 2015 Cyber Physical Power Systems Fall 2015 Security.
BENATO IT Session 4 – Block 3 – Question 6 Barcelona May 2003 THE ISLANDING PROBLEM PASSIVE PROTECTIONS AS DEMONSTRATE THE POSSIBILITY OF FAILING.
Frankfurt (Germany), 6-9 June 2011 Paulo Pereira – Brazil – Session 2 – 0993 OPTIMIZATION OF VOLTAGE REGULATOR SETTINGS AND TRANSFORMER TAP ZONES IN DISTRIBUTION.
Transition Plan Network Operations Model Change Requests 5/26/2010.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
Energy Storage Modeling for Distribution Planning Roger C. Dugan Jason A. Taylor Davis Montenegro EPRI.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
SUSTAINABLE INVESTMENT STRATEGIES FOR AGING DISTRIBUTION NETWORKS Dr. Eric Jennes 24/7 Netze Mannheim Germany Frankfurt (Germany), 6-9 June 2011 Dr. Eric.
Nodal Planning Go Live Austin, TX February 3, 2011
An Overview of the U.S. Electric Power Grid
MIGRATING TOWARDS A SMART DISTRIBUTION GRID
Paper 5.57 INFORMATION SYSTEM SOLUTION FOR RELIABILITY BASED ANALYSIS AND DEVELOPMENT OF DISTRIBUTION NETWORKS P. Verho, P. Järventausta, A. Mäkinen, K.
EUS 260 Capstone Project.
EE362G Smart Grids: Architecture
Review of Distribution Network Protection
Prepared by: Ismael K. Saeed
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance situations for existing staff  study grid behavior with future equipment such as substations, transformers, Distributed Energy Resources (DER) like Wind, PV, etc. ... OTS in use at transmission control centers since decades Roland Eichler – Germany – S3 – Paper 0211 Operator Training Simulator for a Distribution System

Frankfurt (Germany), 6-9 June 2011  higher dynamics due to more DERs connected  increased requirements for reliability of supply  more complex (feeder) automation schemes  advanced control center tools increasingly available such as state estimator, power flow, volt/var control, etc. This leads to the need for OTS also in distribution grid control centers – particularly with view on Smart Grids Roland Eichler – Germany – S3 – Paper 0211 Why OTS for Distribution Systems

Frankfurt (Germany), 6-9 June 2011  means for sequences of events to be defined, stored and retrieved by the instructor  simulates response of load, generation and network conditions to control actions, initiated either from the Educational System or from CCM  connects the PSM with the CCM; disturbances, outages, noise, etc. for each data point  replica of the control functions i.e. features and UI of these functions in the SCADA/DMS and OTS are identical Roland Eichler – Germany – S3 – Paper 0211 Overview of OTS PROTECTION MODELING GENERATOR MODELING DISPLAY & CONTROL APPLICATION FUNCTIONS OPERATORLOGGING SUPERVISORY CONTROL NETWORK SIMULATION DATA ACQUISITION LOAD MODELING TRAINING SEQUENCE CREATION SYSTEM EVENTS BASE CASE SELECTION TRAINER EDUCATIONAL SYSTEM TELEMETRY MODEL POWER SYSTEM MODEL CONTROL CENTER MODEL

Frankfurt (Germany), 6-9 June 2011  Simulation of the power system by solutions of the model loops (OTS cycle)  Frequency Model and External LFC Model can be omitted for distribution grids  Once every cycle the Load Model and the Protection Models are updated  In case of breaker openings/closings due to the Educational Subsystem or due to relay actions the flows and voltages throughout the network (Network Model) are recalculated Roland Eichler – Germany – S3 – Paper 0211 The OTS Power System Model The major component that distinguishes an OTS for distribution from a transmission system OTS is the Power System Model.

Frankfurt (Germany), 6-9 June 2011 Upon session start:  All status information and measured values are taken from a saved case  Non-measured loads are determined from load curves (C)  Initial run of OTS-DPF with scaling of the loads to the measured values (e.g. at feeder head M).  Comparison of OTS-DPF solution to the load curve values yields scaling factors Use of these scaling factors throughout the training session. Roland Eichler – Germany – S3 – Paper 0211 PSM: Specialty in Load Modeling MM C C C CC C CC

Frankfurt (Germany), 6-9 June 2011  OTS-DPF does not do scaling again after session start-up (vs. DPF performs scaling each time)  DTS-OPF runs in 15 min cycle calculating all feeders of a single HV infeed handling all HV infeeds of the grid one-by-one vs. 5 sec cycle in transmission grids  Project experience: 20,000 loads 33,000 line segments 150 HV infeeds 30 sec total calculation time Roland Eichler – Germany – S3 – Paper 0211 PSM: Specialty in OTS-DPF activation

Frankfurt (Germany), 6-9 June 2011 Roland Eichler – Germany – S3 – Paper 0211 Trainee Evaluation Module – Sample Result

Frankfurt (Germany), 6-9 June 2011 Roland Eichler – Germany – S3 – Paper 0211 Trainee Evaluation Module – Criteria Setting

Frankfurt (Germany), 6-9 June 2011  Described OTS planned for hand-over to first customer in August 2011: 500,000 customers 21,000 km of distribution lines annual growth rate of 12%  Add specialized modules to the Generation Model for modeling of DERs  Add distance protection relay model in combination with short-circuit calculation Roland Eichler – Germany – S3 – Paper 0211 Future Outlook