Case Study Tender Procedure to Acquire Tunnel Equipment for the Austrian Access Route of the Brenner Base Tunnel Lower Inn Valley Section Christian Hagen.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

Bucharest – 18/9/2013. Procurement procedure of the awarding contracts by the Beneficiaries / Partners shall be in compliance with the procedural procurement.
Tendering Yuck!.
Session “International standards for planning and conducting procurement process” Conditions and rules of the tender procedure - Recommended content of.
A case of Armenia: Legal framework for E-procurement in Public Procurement Sector Mr Karen Brutyan, PhD, PFM and PP EBRD Consultant, Wolf Theiss 1-2 December.
The Challenges for Ensuring Transparency and Accountability in specific Areas of Public Financial Management presented by Mr.Abdluaziz Yousef Al-Adsani.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
Full Costing University of Vienna. Content Introduction Aims of Full Costing Implementation of Full Costing Full costing model Conclusion and Challenges.
Regulatory Body MODIFIED Day 8 – Lecture 3.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
Procurement Presentation Alan Brett Contracts Officer HSE.
EuropeAid How can a private entity benefit from EC Service Contracts ? Jean-Louis VILLE Head of Unit « Finances, Contracts and Audit » Neighbourhood.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
Contratación en los Organismos Internacionales de Propiedad Industrial Ignacio de Medrano Caballero Director Adjunto Área de Recursos Humanos 25/10/2011.
The new EU legal framework for e-procurement: Expectations and Prospects Conference ‘E-procurement and Public Spending: Status, Opportunities and Prospects’
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Public Procurement Procedure – Bidding Documents
Session “International standards for tender submission” Bid opening and bid evaluation Ľubica Páleníková EBRD-Consultant, WOLF THEISS Kiev, 1-2 March 2012.
United Nations Procurement Division
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
 Manager of public procurement is not the final consumer  Number of people participating in taking decision  Volume of trade  Formalized process of.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Cooperationand consortium building Luis Araque de Juan European Commission International Cooperation and Development DEVCO/EuropeAid Unit R.3 Legal Affairs.
Public Procurement Uinsinn Finn Galway County Council Roads, Transportation, Marine.
11 /Module I.3/ Management of public procurement /Module I.3/ а. Procuring entity b. Evaluation committee & Rights and Duties c. Procurement Planning.
Session “International standards for tender submission” Contract notice and time-tables: practical examples Johannes S. Schnitzer EBRD-Consultant, WOLF.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
EMTA General Meeting Prague May 2012 Round table on PSO Regulation 1370/2007 “Two years after enforcement, where are we? How efficient is the regulation?
Doing business with CERN Anders Unnervik 20 May 2014.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
2014 ANNUAL PROGRAMME: MEETING WITH LEAD INSTITUTIONS & END BENEFICIARIES March 2016 CFCU.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
Doing business with CERN Anders Unnervik
Tender Evaluation and Award Process
Content of Tender Dossier - Instructions to Tenderers - Tenders
Contract Award Procedures
Content of Tender Dossier Instructions to Tenderers
PRESENTATION OF MONTENEGRO
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
PRESENTATION OF MONTENEGRO
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Workshop ESF and tendering 11 October 2006, Brussels Directive 2004/18/EC Tendering of public contracts Robert Wein, European Commission Disclaimer:
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
The evaluation process
Andrea Sundstrand Associate Professor
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
Competitive Dialogue/Competitive Procedure with Negotiation
IT-4464/EN Bidders conference
Presentation transcript:

Case Study Tender Procedure to Acquire Tunnel Equipment for the Austrian Access Route of the Brenner Base Tunnel Lower Inn Valley Section Christian Hagen AEE Consultant for Infrastructure Projects Project Development, Support, and Control Services Procurement Risk Assessment Preventative Measures of Additional Costs Kiev, 6-7 September TMM

Agenda 2  I. Introduction  II. Railway Technology  III. Tender Procedure

I. Introduction  The most important aim of any effort to improve a company’s procurement strategy is to increase efficiency and effectiveness, to start right on time and to reduce risks …  …therefore the challenges to manage are:  Pressure to maintain costs  Risks of increasing costs (raw materials, costs of exchange, …)  Tight time schedule  Deadlines to be met in all projects  Different and development of technologies  Complexity of procurement laws  Corruption 3

II. Railway Technology

Safety Concept 5 Safety Measures: Safety Measures:  Modern European Train Control System Safety Measures: Safety Measures:  Modern European Train Control System Accessibility and Ventilation: Accessibility and Ventilation: Emergency exits every 500 m Illuminated handrail along escape routes extinguishing water, hoses Accessibility and Ventilation: Accessibility and Ventilation: Emergency exits every 500 m Illuminated handrail along escape routes extinguishing water, hoses Allocated Space for Rescue Operation and Building at Tunnel Shaft Exit: Allocated Space for Rescue Operation and Building at Tunnel Shaft Exit: Space for emergency vehicles Landing field for emergency rescue helicopter Allocated Space for Rescue Operation and Building at Tunnel Shaft Exit: Allocated Space for Rescue Operation and Building at Tunnel Shaft Exit: Space for emergency vehicles Landing field for emergency rescue helicopter

Tunnel Safety Equipment 6  Vibrated concrete  Installation of fire hydrants  Hoses and extinguisher  Tunnel radio  Special equipment (oxygen)

Telecommunication 8 Digital Radio Network :  Radio communication between train driver and dispatcher  Radio communication between technical personnel responsible for maintenance and repair  Data transmission for train control  Radio communication for emergency services (ambulance, fire brigade) in case of emergency Emergency Call Systems:

9 Electronic Signal Box

Spring-Mass-System

Shock and Vibration Control – Spring-Mass-System 11

Noise and Vibration Control 12  Lining of smooth concrete areas with sound absorbing elements  Special elements for noise reduction  Noise barrier or embankment ◄ High exposure Low exposure ►

III. Tender Procedure - Conditions  The contract was awarded following an EU invitation for bids (Negotiated procedure)  Principles of awarding contracts (Article 2 Directive 2004/18/EC)  Contracting authorities shall treat economic operators equally and non ‑ discriminatorily and shall act in a transparent way  The contracting authorities issued as a first step a pre-tender information brief  Preparation of tender documents for the award of contract of the project with the following content:  Tender specification  Construction description  Technical contractual terms  Legal contractual terms  Opinions and reports  Dates and deadlines  Terms of specifications  Declarations and notifications of the bidder  Plans 13

The Tenderer's Offer  The tenderer's offer must contain all the essential elements required in the invitation to tender from the outset, otherwise it is subject to being considered inadmissible  Two firmly sealed envelopes (e.g. signed across the seal)  Part I:  Documents necessary for the assessment of the commission “organization”  Documents necessary for the assessment of the commission “railway track systems“  Documents necessary for the assessment of specifications, functions, and technical details  Deposit (Vadium)  Tenderer's declaration  Part II:  Time-dependent costs  Long text of technical specifications  Calculation sheets  The tenderer takes the risk due to defectiveness or incompleteness  For all parts a legally valid signature is required 14

Award Procedure  The bid opening commission opens the bids almost immediately after the deadline for the submission of tenders expires(date/time)  A record of the bid opening session is prepared, and signed by the members of the bid opening commission  The bids and their annexes, as well as the documentation of opening of bids, must also be kept safe and confidential after completion of the award procedure  After the opening of the bids, the bids are examined with regard to the compliance with the tender documents; compliant bids are then reviewed with regard to the fulfillment of eligibility and selection criteria (i.e. verification of the eligibility and of the financial, economic, technical and professional standing of tenderers) and the award criteria  Assessment of the commissions begins (supervision of the commissions by an external advisor increases the chances of success considerably)  Elimination of tenders violating the tender documents (organizational and technical terms and conditions)  Clarification procedure and meeting 15

Award Criteria  Quality assessment in relation to the costs of the project  Evaluated total price = total price * [1 – (achieved credit point amount-commission / weighting factor)]  Commission "organization":  Organization of the construction team  Key personnel and/or departments  Organization of the external interfaces  Quality and deadline management  Logistics and coordination  Special safety management  Overall concept of the temporary power supply  Commission "railway track systems":  Technical functionality and price of the tracks  Maintenance and quality improvement  Regulation  The contract is awarded to the bidder who submitted the (commercially and technically) best bid 16

 Two commissions to evaluate and assess the quality of the bids(railway track systems + organization)  Examine and evaluate tender documents  Evaluate bids  Negotiate the contract  Best practice to achieve unanimity  Evaluation and rating process by using different valuation methods  Duties and responsibilities of the members of the evaluation commission  Duties and power of the person chairing the commissions Commissions 17

Commissions (2)  Duties of the members of the commissions  Evaluation, valuation, rating of the bids  Confidentiality obligation  Self direction and independence  Elimination of tenders violating the tender documents  Duties of the chair person  Supervision of the commission  In the case of disagreement the chair person should promote compromise and unity  Confidentiality obligation  External and neutral advisor 18

Contact 19 MMag. Dr. Christian Hagen AEE Consultant – Innovative Solutions & Strategies Tel: + 43 / 676 / Seidengasse 31/II/ Vienna Austria