SIGN MANAGEMENT UPDATE Tracy Nowaczyk Pavement Management and Operations Section Engineer Meeting Fall 2013.

Slides:



Advertisements
Similar presentations
District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007.
Advertisements

Retroreflectivity: Raising the Nighttime Brightness of Traffic Signs and Markings Office of Technology Applications Peter Hatzi.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
MnDOT Metro District State Aid Construction Thursday February 19 th, 2015.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
The National Declassification Center Releasing All We Can, Protecting What We Must Public Interest Declassification Board NDC Project Update April 22,
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
EHS Fire Safety Goals and Measures for 2005 Goals and Measures for 2005 Fire Safety on the March.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
Mobile Technology Changing the Business of Road Maintenance Chris McCurry Senior Information Resource Consultant.
Webinar May 24 th, 2013 Tracy Nowaczyk, PE.   Signs from Inventory.
Capital Asset Management CATS Presentation December 12, 2007 Today’s Presenter: Anna Jensen, Director of Auxiliary Accounting, Capital Asset Management,
MoDOT’s Inventory Systems and Measures for Pavement Marking and Roadway Signing Jim Carney State Maintenance Engineer October 2004.
Section Engineers Meeting Lake Cumberland March 2010.
Minimum Retroreflectivity Levels for Traffic Signs New MUTCD Criteria.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
New MUTCD Requirements for Sign Retroreflectivity Matheu J. Carter, P.E. Delaware T 2 Center.
Old Policy – which no one ever seem to have heard of.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Advancing Public Safety Through Technology Integration Advancing Public Safety Through Technology Integration National Model Scanning Tour May 7, 2003.
AASHTO Subcommittee on Construction Burlington, Vermont Tuesday, August 17 th, 2010 Tom Ravn.
National Plant Trials Results Database Phase I Overview September 2, 2011.
MURK Presented By Awni Alsous, MURK Engineer 2010.
Federal Motor Carrier Safety Administration & DOT Safety Regulations Updates.
Performance Specifications T. E. A. M. St. Louis Presentation October 8, 2004.
Day Weighted Resident Rosters New Jersey Department of Health and Senior Services AND July-August 2010.
EMARS User Group Meeting April 25, Agenda Opening Remarks Barbara Aldridge-Montfort Ethnic Minority VendorsDon Speer/Joan Graham EO1sDon Speer/Joan.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
NC STATE UNIVERSITY DEPARTMENT of SOIL SCIENCE NC STATE UNIVERSITY DEPARTMENT of SOIL SCIENCE NC STATE UNIVERSITY DEPARTMENT of SOIL SCIENCE NC STATE UNIVERSITY.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
2009 MUTCD (Final Rule) Revisions incorporated into the 2009 MUTCD 2009 Manual on Uniform Traffic Control Devices.
Utility & Rail Coordination in Project Development Jennifer McCleve Utilities & Rail Branch Manager.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
MUTCD Adoption Delays/Status. Manual on Uniform Traffic Control Devices (MUTCD) KRS requires the Cabinet to adopt a manual of standards and specifications.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
The U.S. Department of Transportation and the International Trade Data System Steven Beningo Transportation Border Working Group Border Data Workshop June.
Department of Alcohol and Drug Programs State of California Department of Alcohol and Drug Programs Overview of Administrative and Support Structure for.
MUTCD Website: Nighttime Visibility Website:
A summary of the new rule and methods to be in compliance Sign Reflectivity Maintenance Standards.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Traffic Management Transit Management Emergency Management Fixed Point-to-Fixed Point Communications Roadway Toll Administration Remote Traveler Support.
Click to add text Dealer Pre-Qualification Information Session STATE OF MICHIGAN Department of Technology, Management and Budget Purchasing Operations.
Minimum Sign Retroreflectivity Requirements Updated August 2012 with compliance date revisions.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Donald E. Howe, P.E. Division of Traffic Operations California Department of Transportation Minimum Sign Retroreflectivity Requirements New.
Using GPS To Locate Collisions Lessons Learned Division of Traffic Accident Surveillance Section.
Enterprise Archiving, Retention and Discovery System Jim Albert Deputy Director Department of Information Services April 19 th 2007.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Environmental Protection Agency 1 The High Production Volume Information System (HPVIS) Demonstration and Status National Environmental Partnership Summit.
Jason J. Siwula, PE – Safety Engineer HSIP HORIZONTAL ALIGNMENT SIGNING.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Personal Property Management Workshop HRPP: Overview DOE Order 580.1A Roll-Out Overview: Why revise HRPP requirements in DOE Order 580.1? What are the.
InstantGMP MD/PRO Electronic Device History File Software for Manufacturing Medical Devices in compliance with 21 CFR Part 820 (Quality System Regulation)
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Vermont- Automated Vehicle Inspection Program (AVIP)
1 Punch list / Close Out - Project Completion Best Practices May 2016.
May 12, 2006 District Engineer Presentation1 Signing Performance Measures Report 2005 Data.
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION Crash Cushion and Guardrail Approach Terminal In-Service Performance Evaluation.
New MUTCD Requirements for Operations
Document Handover Training Session
Emphasis on Quality Rochester’s City Owner Contract Process
Punch list / Close Out - Project Completion
Presentation and update on the development of the EAHCP Data Management Program Alicia March 17, 2016.
GoFormz A RISK BASED INSPECTION APPROACH A NEW INSPECTION PROCESS
Minimum Sign Retroreflectivity Requirements Updated August 2012 with compliance date revisions New Retroreflectivity standards were added to the MUTCD.
Txdot field inspection
Regulation and Licensing Department RLD Permitting and Inspection Software Modernization Change (Planning) Request Agency CIO/IT Lead - Michelle Langehennig,
Presentation transcript:

SIGN MANAGEMENT UPDATE Tracy Nowaczyk Pavement Management and Operations Section Engineer Meeting Fall 2013

FHWA Final Rule Agencies must have in place assessment or management plan in place by June 13, 2014 Elimination of compliance dates Does not relieve retroreflectivity standards

KYTC Need Comply with MUTCD retroreflectivity standards Accurate, reliable and cost effective method to evaluate traffic signs Objective is to minimize costs, reduce liability, improve safety

Sign Management System Goals Identify worn out signs Minimize requirements for field inspections Plan and budget resources properly Useable as liability defense Compliment existing inventory sets Anticipate future needs

Sign Management Components Existing sign inventory Sign manufacture New sign installation Retroreflectivity inspection

Existing Inventory Collection Every district has at least one county collected Contract field collection with ADDs 90% complete Next phase will utilize photos from Mandli collection vehicles Projected 100% completion March 2014

Sign Manufacture Barcodes hold sign attributes All district sign shops have barcodes Central sign shop manufacturing signs with barcodes Master agreements require barcodes Special note for construction projects

Special Note Permanent Signs Installation of permanent signs Department provides barcode to contractor Contractor must record barcode, sign attributes, and coordinates of location Contractor must submit data electronically prior to inspection Complete sign inventory before payment

New Sign Installation Mobile devices record sign location and date of installation All districts have mobile devices Software update in testing New version release date end of October Increased functionality Bug fixes

Retroreflectivity Nighttime visual inspection can begin Trained inspectors in each district NTVI training offered in spring Two year cycle Sheeting test banks active Barcode + Mobile Device = End of Inspections

KYTC Sign Inventory Map Signs from inventory contract (ADD) ◦ Barcode begins with 9 ◦ No installation date available Signs installed with mobile device ◦ Barcode begins with KY or PILOT ◦ Installation and manufacture data available Photolog points

Operations Management System (OMS) Web link Nighttime visual inspection forms Nighttime visual inspection results Detailed sign installation reports

SMS Quarterly Updates Contains program updates Updated roadside inventory numbers Activity summaries for each district ◦ Signs manufactured with barcode ◦ Signs installed with mobile device Next update: December to be included on SMS distribution

Thank You OMS Helpdesk