First Article Inspection 9102 Carl ZimmermanSept,2013.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

ISO 9001:2000 Documentation Requirements
Transition from Q1- 8th to Q1- 9th edition
Understanding the Requirements Qimpro Standards Organization
First Article Inspection Report
© 2009 Michigan State University licensed under CC-BY-SA, original at Control of Nonconforming Product.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
QMS Documentation Click the mouse to advance slides and animations in this slide show…
ISO 9000:2000 Quality system standards adopted in 1987 by International Organization for Standardization; revised in 1994 and 2000 Technical specifications.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
4. Quality Management System (QMS)
Training.
4. Quality Management System (QMS)
First Article Inspection
Fundamentals of ISO.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Creating Lasting Change for Your Business ISO 9001:2000 Management System Overview.
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
Quality Management System
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Introduction to Software Quality Assurance (SQA)
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
COMPANYWIDE ASSESSMENT OF QUALITY
Software Configuration Management (SCM)
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
QUALITY MANAGEMENT STATEMENT
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
PROGRESSIVE & TARGET & TARGET AUDIT/REVIEW PROGRAM.
Project Planning Goal 1 - Estimates are documented for use in tracking and planning project. Goal 2 - Project Activities and commitments planned and documented.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Presentation on Quality management systems Presented by: Razeena Ameen Roll no BS(IT) 7 th.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Supplier Corrective Action Request (SCAR) Supplier Training
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Quality Management Process
BUSINESS PROCESSES MAP
First Article Inspection
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
ISO 9001 Awareness Training.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
SQA01 Guidance Material: FAI Review
First Article Inspection
AS 9100 Awareness Training.
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
ISO 9001:2000 Management System Overview
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Presentation transcript:

First Article Inspection 9102 Carl ZimmermanSept,2013

 Purpose: The purpose of the First Article Inspection is to give objective evidence that all engineering, design and specification requirements are correctly understood, accounted for, verified, and recorded. The purpose of this standard is to provide a consistent documentation requirement for aerospace components FAI.

Why is First Article Inspection important?  Aerospace design and manufacture is complex Requirements are stringent (eg. MBD, tolerances, performance, etc.) Reliance on Specifications (material, process, methods, etc.)  Conformance to all design requirements is required Public Safety – We all fly Demonstrate product conformance, with objective evidence

Why is First Article Inspection important?  FAI is a fundamental QMS process Verifies that defined manufacturing methods, tooling, equipment, training, instructions, etc. results in conformance to design Ensures nonconformances are identified, and action is taken, until results conform to design Not just a quality records generating process for inspection Involves all Product Realization related departments (e.g. Engineering, Procurement, Manufacturing, Quality, Tooling, etc.) FAI process is concurrent with product planning and manufacture

Why is First Article Inspection important?  Continual Improvement activity Formal QMS process (e.g. requirements, process definition, quality records, assigned personnel, etc.) Drives change to the applicable QMS process, as part of corrective action process Design, Procurement, Manufacturing, Tooling, Equipment, etc. Supports cost reduction ( Cost of poor quality) Eliminate repetitive nonconformances Eliminate/reduce NoEs (First Part and on) Supports improved delivery Stable and controlled production processes On-time delivery commitments

FAI Planning needs to begin with production planning Detailed FAI procedures are important for level setting with customers Complete FAI needs to be presented with first production delivery Dealing with non conforming characteristics- new part after RCCA verification Why is First Article Inspection important?

Questions on why FAI is critical? REV A- B changes