Team Leader: Megan O’Connell Matt Burkell Steve Digerardo David Herdzik Paulina Klimkiewicz Jake Leone P13027: Portable Ventilator.

Slides:



Advertisements
Similar presentations
Preparing the System Proposal Chapter 13 Topics: –Systems proposal –Determining hardware needs –Determining software needs –Decision to rent, lease, or.
Advertisements

Selecting & Defining Command and Control Systems for Mine Ventilation Presented By: Sancar James Fredsti.
Electrical and Computer Engineer Large Portable Projected Peripheral Touchscreen Team Jackson Brian Gosselin Greg Langlois Nick Jacek Dmitry Kovalenkov.
P13027: Portable Ventilator
NEXT GENERATION ANTILOCK BRAKES VELAMMAL COLLEGE OF
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Team Impact Intelligent Helmet Impact System Preliminary Design Review January 29 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
Automatic Home Medication Dispenser Project # P07009 Team Guide - Dr. Daniel Phillips Project Sponsor - Dr. Michel Berg Team Members Alan StrandburgChris.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
4/28/2004Optical Tape Measure Optical Tape Measure May Team Members: Faculty Advisors: Nick Freese (EE) Dr. Aleksander Dogandzic Bruce Fu (EE) Dr.
P13625 – Indoor AIR Quality Monitor
Development and Quality Plans
Team May1310 Team Members: Taylor Bouvin – CPRE Kok Aun Chee (Kodi) – EE Anna Grimley – EE Mike Kinsella – CPRE Jake Kyro - EE Advisor: Professor Wang.
CMS:Children Monitoring System By: Naif Almadhayan | Steven Smith | Mohammad Safar.
Milestone 2: Project Proposal and Statement of Work TEAM 8: ANDRE ELLIOTTPROJECT: BITCOIN WALLET MARK NIXON KISHEN PATEL ZACH HOELZLE.
Project Management and Scheduling
TEAM LEADER: DANIEL FENTON KENNEDY KONG MARIE REVEKANT DAVID ENGELL ERIC WELCH DEREK ZIELINSKI CHRIS FREEMAN MELISSA HARRISON RYAN MUCKEL ROBERTO CASTILLA.
Team Members: Nahiyan Ali Shrabantee Chatterjee Vaibhav Kumar Alex Weigel Tao Zeng Advisor: Dr. Mani Mina Client: Senior Design Dr. Gregory Smith.
 Rob Fish (Industrial Designer)  Zachary Kirsch (Mechanical Engineer, PM)  Martin Savage (Mechanical Engineer)  Olivia Scheibel (Mechanical Engineer)
1 Effectively Managing Global Engineering Licenses Kimberley A. Dillman IT Solution Architect – Engineering Delphi Corporation
Bicycle Harvesting Waste Energy: Bicycle Power Generation MSD-I RIT-Systems Design Review Winter/Spring P12414 January 13, 2012 Group # P12414.
P13027: Portable Ventilator
1. 2  Team Members:  Dan Fenton (CE) – Team Lead  Ryan Muckel (ME)  Christopher Freeman (ME)  Derek Zielinski (EE)  Eric Welch (EE)  Kennedy Kong.
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
Communication Device for Handicapped Kids Dec Client Heartland Area Agency Sue Young Advisor Yao Ma Advisor Yao Ma Alex Leith Brian Grove Steve Peters.
Viking Pump Flow Manager - Phase 2 Senior Design May
Department of Electrical and Computer Engineering Lighting Tool Box Winter 2004 ECE 498 Team Members: Nick Sitarski Blaine Thompson Brandon Harris Dave.
NetVuze Precision Network Meter standalone, easy to use, networked with data logging.
May Team Information Client Department of Electrical and Computer Engineering, Iowa State University Faculty Advisor Professor Gary Tuttle Team Members.
From Research Prototype to Production
By Anthony W. Hill & Course Technology1 Common End User Problems.
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.
9/17/2002 COSYSMO Usage Experience Panel: What is Happening at Lockheed Martin Garry Roedler, Lockheed Martin Engineering Process Improvement Center
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
Solar Power Array Management for the Solar Racing Team Mark Calotes Ginah Colón Alemneh Haile Nidhi Joshi Michael Lu School of Electrical and Computer.
Pre-Project Components
SPA COMMANDER Dan Latuszek Ken Chou Matt Bergsma Michelle Ochitwa Sulien Wong.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Introduction to PLC by Dr. Amin Danial Asham.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
Smoke Notification System (SNS) Mid-Semester Presentation Senior Design 1 February 28, 2013.
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
Powerpoint Templates Page Senior Design II Mid-Semester Presentation.
P13026: Portable Ventilator
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
Dual-Use Wideband Microphone System
P13027: Portable Ventilator
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
Smoke Notification System (SNS) Final Presentation Senior Design 1 April 18, 2013.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
ECEN 4610 Capstone University of Colorado Boulder, CO January 29, 2009 School of Rock PDR Cheyenne Aberle Drew Veldhuizen Swain Brooks Dan Reed.
MSD 1 Weeks 7-9 Critical Subsystems Design Phase End State.
BME Design 200/300 Glaucoma Medication Reminder. Intellectual Property  All information provided by individuals or Design Project Groups during this.
Gas Pressure Meter (Engineering World Health) Advisor: Professor Naomi Chesler Client: EWH and Professor John Webster Team Members: Ksenija Bujanovic-
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
Chair-Mounted Computer Workstation
Multidisciplinary Senior Design I
Microcontroller Evolution
FPGA Vinyl to Digital Converter (VDC)
Presentation transcript:

Team Leader: Megan O’Connell Matt Burkell Steve Digerardo David Herdzik Paulina Klimkiewicz Jake Leone P13027: Portable Ventilator

Overview Project Summary Customer Needs Engineering Specs System Block Diagram Functional Decomposition Risk Assessment Proposed Redesign

Project Scope Project Objective: Improve the current design of P13026 Duration: 27 weeks Market Release: 2015 Budget: $1000 Customer: Jeff Gutterman Roman Press Faculty Mentor: Edward Hanzlik Team: 4 Mechanical Engineers 2 Electrical Engineers

Customer Needs Customer Need #ImportanceDescriptionComments/Status CN11Maintain Portability Portable based on digital electronics, preferably on microprocessor, minimize weight and size CN21Include Audio FeedbackGives non-visual, non-braille instructions/feedback CN31Optimize Battery LifeOperates for minimum of 2 hours without recharging CN41Replaceable BatteryBattery easily replaced CN51Minimize ExpensesParts cost < $1000 CN61Display Relevant Data Show information that will be necessary for the customer to operate the ventillator on the front panel CN72Measure Oxygen LevelsAdd a pulse oximeter CN82Measure CO 2 LevelsMeasure CO 2 levels on expiration CN92Optimize for mass production CN103Design Similarly The design of an updated version of the PEV that remains "substantially equivalent" to the design which received FDA 510(k) approval to manufacture and market CN113Record and Transfer DataRecord and transfer data CN123Reduce size/weight(less than 18lbs) Importance: 3: Preference only 2: Nice to Have 1: Must Haves

Engineering Specifications Portable Emergency Ventilator Engineering Specifications - Revision /19/13 Specification Number SourceFunctionSpecification (Metric)Unit of MeasureMarginal ValueIdeal ValueComments / Status S1PRPSystemVolume ControlLiters S2PRPSystemBreathing RateBPM, Breaths per Minute4 -15 S3PRPSystemPick FlowLiter/Min S4PRPSystemAir Assist Senitivitycm H ± 0.5 S5PRPSystemHigh Pressure Alarmcm H S6PRPSystemDC InputVolts Due to battery, must be greater than 9V S7PRPSystemDC Internal BatteryVolts12 S8PRPSystemElasped Time MeterHours S9PRPSystemPump LifeHours4500 S10PRPSystemO 2 / Air mixerO2O2 21% % S11PRPSystemSecondary Pressure Reliefcm H S12PRPSystemTimed Backup BPM S13PRPSystemWeightKg≤ 8 S14 RobustnessDrop Heightmeter1

System Block Diagram

Functional Decomposition

Top Level Functions

Provide Airflow

Monitor Feedback

Communicate State

Manage Power

Risk Assessment Risk ItemEffectCause Likelihood Severity Importance Action to Minimize Risk Tech Concerns 1 Integration of hardware and software together non-workable prototype using devices from different companies that don't function together 339 plan and read specs on all technical components; test components compatibility 2 inputs do not match outputs failing to meet FDA requirements programing and calibration errors133quality testing of design 3 battery integration in system underperforming; fire hazard battery failure; not meeting engineering specs 313 check with experts on how to manage battery functionality 4Durability failure components breaking; failure of system components malfunctioning during usage 236 perform vibration testing; perform environmental testing Severity Scale:1= Not Severe 2= Moderately Severe 3=Very Severe Likelihood Scale:1= Not Likely 2= Conceivable 3=Very Likely Importance= likelihood x severity

Risk ItemEffectCause Likelihood Severity Importance Action to Minimize Risk Project Concerns 5Over budget cannot build a working prototype that looks like vision necessary parts more expensive than budget leaving not enough money for aesthetics 313 perform cost analysis; utilize resourcefulness; properly plan so things can be done right the first time 6 uncoordinated team schedule late completetion of deliverables; lack of team unity conflicting schedules and desired meeting times 224 constant communication; survey of wekkly available time 7late delivery of parts modification to design schedule; miss deadlines lack of planning; problems with vendors224 order parts ahead of time; expedite when necessary 8 Remaining substantially equivalent with current design design that is not capable with FDA approval changing the current design drastically beyond the FDA approved design 133 make sure any major changes to design are validated with client 9conflicts with customer more budget needed; change design schedule change in market; change in design plans; change in prospective 122 team members should maintain open communication with client; relevant market research 10 product does not match consumer needs not profitable not meeting FDA requirments; not meeting trends 133benchmarking research 11 team skillset doesn't match task misdistributed work loaduneven distribution of disciplines224maximize group communication Severity Scale:1= Not Severe 2= Moderately Severe 3=Very Severe Likelihood Scale:1= Not Likely 2= Conceivable 3=Very Likely Importance= likelihood x severity

From > Our Foundation to Build On Updates: 1. Electronic controls (decrease size/more options) 2. Smaller pump 3. Reliable and smaller battery (2+ hours) 4. Device ergonomics and usability Additions: 1. Ability to monitor and record vitals 2. Pulse oximeter feedback 3. Signaling alerts

Revision B- Proposed Redesign Update: 1. Battery Size-> Reduce Size & keep same capacity 2. Reduce Circuit Board size-> Create custom board for all electrical connects 3. Phase motor driver to a transistor 4. Display Ergonomics 5. Overall Size and shape of PEV 6. Instruction manual Additions: 1. Visual Animated Display-> Moving Vitals 2. Memory capabilities 3. USB extraction of Data 4. Co2 Sensor as additional Feature to PEV 5. Overload Condition due to Pump Malfunction

Batteries: Area for improvement Decrease weight Smaller size Lower price Higher power capacity

Batteries Tekkeon Tenergy 11.1V Heavy Duty Tenergy 11.1V LIPO Power Capacity 58 Wh111 Wh61 Wh Dimensions 17.4cm x 8.43cm x 2.26cm 20.5cm x 7.3cm x 2.2cm 14.8cm x 5.2cm x 2.3cm Weight452 grams726 grams333 grams Price$200$108.75$57.99

Custom PCB Solution We plan on using a custom mixed signal PCB solution Advantages: Reduce size and weight greatly reduce production costs Manufacturability Flexibility Disadvantages: High development costs A lot of work Some risks involved

Size and Weight All electronics will fit on one PCB turning a volume into an area that can fit on the side of the enclosure and take up very little space

Costs Development costs will be high but production costs will be very low

Manufacturability Having only one board will minimize assembly time since fewer connections are required Connections to be made: Battery LCD Dials/Switches Pump Air lines to sensors

Flexibility We can customize our design to work with a wider variety of products This will potentially reduce costs since we can choose the best and cheapest components

Example: LCD Display Selection of LCDs we can interface with is greatly increased This allow us to use a display like this 7” diagonal touchscreen LCD available for only $97

Risks of Custom PCB We may have trouble figuring out how to interface with some of the new features, particularly the pulse oximeter If there is a significant problem in the initial PCB ordered, another order will have to be made to fix it which will be just as expensive

Housing Modifications Smaller components = smaller package

Housing Modifications Old Physical Limits: 15in long X 10in high X 7in deep New Physical Limits: 11in long X 6.75in high X 6.5 in deep

Housing Modifications

Additional Developmental Testing 1. Vibration Testing- How will the PEV stand up to external vibration and drop conditions? I. Random Vibration Frequency Testing (From 0- 2kHz) - Understand Natural Frequency of System (Resonance) and address measures to avoid this state - Specs: TBD II. Drop Testing - Understand g-forces with respect to system mass and height to drop. Allow us to make judgment on component damage. 2. Usability Testing on Major Display Components I. Understand General Usability-> Imagine RIT surveying (designed with Marie and David) II. EMT intelligent Usability-> Survey EMT and medical practitioners

Improving Ease of Use Improving User Interface Providing Audio Feedback Supplying medical staff with patient data

Audio Feedback We plan on providing the user with limited audio feedback to guide them through using the PEV Simple Commands that cover the basic functions Not a step-by-step instruction manual Advantages: Provides assistance in hectic environments Could provide untrained personnel with guidance

User Interface Small Improvements to make the User Interface more “user- friendly” Adding small sections of display above settings/mode knobs that correspond with the user-selected settings LEDs to help guide user during operation

USB Data Extraction By implementing a USB connection on the custom board, data scripts will be able to be downloaded after using the device. Text scripts will be time-stamped ID-ing patients with a patient # Recording important information such as vitals and/or air flow/compressions administered Can be used by medical experts when needed for legal/health- related issues.

Mass Flow Analysis (Between Pump outlet and Ventilator outlet) Replacing Mass Flow Sensor with Venturi Analysis Assume incompressible flow: Constant density

Venturi Analysis compared to mass Flow Sensor Cost: Honeywell AWM2300V Mass Flow Sensor = $ Freescale MPX12 series Differential Pressure Sensor = $8.61 Number of Parts: Current design about 6 parts Proposed design about 8 parts Additional parts on the order of a few dollars (reducers) Size: Mass Flow Sensor = 1.24”x1.2”x0.61”=0.91 in 3 Differential Pressure Sensor = 1.15”x0.69”x0.43”=0.34 in 3

High Pressure Safety Improvements 1. Audio Alarm: Software triggered alarm if flow rate is out of bounds of pump inputs 2. Audio Alarm: Secondary pressure sensor records high back pressure 3. Mechanical Relief Valve: Fail safe to release system pressure if pressure exceeds a predetermined level

Bench Marking High Pressure Precautions Both AutoVent and CAREvent have double redundant ways to assure the patient never experiences too high of pressure

CO 2 Disposable Sensor Benchmarking Current Technologies: