PH/DT MCP & MNO Xavier Pons on behalf of MCP team – 25/03/2013.

Slides:



Advertisements
Similar presentations
Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Chapter 7 Input Modules.
DP Cabinet.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
MUST HAVE SHOULD HAVE COULD HAVE Module # 010. Qi Hardware Objectives Recognize hardware Know how to interface to field equipment Know the 4 different.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
PH/DT MCP & MNO NEW MAGNET SAFETY SYSTEM HARDWARE Sylvain Ravat PH-DT Xavier Pons PH-DT.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
We are Group5 Weatherstation The team Members are : Saran Jackson Robert Howard Robert Garvey Gene Fitzgerald Steven Dowling.
SCADA and Telemetry Presented By:.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
DATA ACQUISITION Today’s Topics Define DAQ and DAQ systems Signals (digital and analogue types) Transducers Signal Conditioning - Importance of grounding.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
Smart transmitters.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Developments in the IntelliFIBER ™ Fiber Optic Fence Sensor
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Winter 2011/2012 shutdown On-call service - FSU Future projects AOB G. Olesen - PH-DT-DI.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
By Anthony Moody Rhys Porter Nicolas Wilson.  Background  Objectives  Design  Normal Operation  Logic  Failure  Issues and solutions  Improvements.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Excom ® Remote I/O in Zone 1. excom ® excom ® One system for all requirements in Zone 1.
MSS2 HARDWARE ASSEMBLY  FROM LAURENT DERONT. FORMAT STANDARD 6U CRATE  1 ST BACKPLANE INTERFACE CONNECTOR DB37 (Front side) TO DIN (Back Side) 1.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
Optocoupler Isolation Circuits for Industrial Application
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
ECE4006 Senior Design Project Linda Milor and Jay Schlag
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
10 th of April 2003 ATLAS “MSS Specification” Magnet Safety Systems – Magnet Common Project E. Sbrissa, G. Olesen – CERN/EP 5 Tests 5.1 Pre-production.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
60kW Thermosiphon control system
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
MCP Status Magnet Control Project - MCP Common systems: MCS – Magnet Control System – S. Ravat MDS – Magnet Diagnostics System – S. Ravat MSS – Magnet.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
Performance of B-sensor types EUDET NIKHEF VS F. Bergsma 12/9/2007.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
Chapter 7 Input Modules. Objectives (1 of 2) Explain the differences between positive and negative logic and sinking and sourcing. Describe the available.
ProtoDUNE SP – Slow control temperature gradient monitor
Feather 2 Technology.
NWU IT-ES/NWU IT-ELD Monitoring systems
D1 and D2 powering and protection
Gas System Commissioning
Electronic Components
R&D of neutrino beam production for future (Multi-)MW proton facility:
Magnet Safety System for NA61/Shine
MicroLogix Packaged Controllers
Computers Chapter 17 Lesson 4.
RF Local Protection System
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Machine Protection PLC Based System Verification and Validation Plan
Delta Heater Introduction
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

PH/DT MCP & MNO Xavier Pons on behalf of MCP team – 25/03/2013

PH/DT MCP & MNO Commitment: -To assure the availability of Atlas, CMS, Alice and LHCb magnets. -To assure the preventive and corrective maintenance of the experiment magnets. -Magnet ON-Call Standby service 24/24 h, 7/7 d, 365/365 y -When beam is ON, we provide support for other magnet control and systems related to control and instrumentation

PH/DT MCP & MNO

AliceLHCbAtlasCMS SolenoideDipole ToroidsEnd-capsSolenoide Technology Resistive Superconducting Nominal Current 30 kA6 kA 20.5 kA 7.6 kA19.5 kA Nominal Field 0.5 T0.7 T 3.9 T4.1 T2.6 T4 T Nominal voltage 130 V639 V730 V Inductance 1 H2 H5.14 H1.09 H1.35 H14 H Atlas Magnet Simplified Representation

PH/DT MCP & MNO ATLAS OVERALL MAGNET CONTROL LAYOUT MDS PLC PVSS HLM. ALTERA PROGR. LOGIC ARRAY

PH/DT MCP & MNO MCS SLOW CONTROL – PLC +SCADA

PH/DT MCP & MNO MSS – MAGNET SAFETY SYSTEM The purpose of the MSS is to detect anomalies endangering the safety of the magnet and to take appropriate action in order to bring the magnet into a safe state. Maximum availability/reliability Dedicated sensors Multiple detection techniques/Overlapping sensors Redundancy Galvanic Isolation Fail-safe operation

PH/DT MCP & MNO MSS - Digital Signal Processing

PH/DT MCP & MNO MSS - Analogue Signal Processing Analogue Input Types: Dual Voltage Measurement module –DVM module 2 Voltage measurements – 1 differential measurement Bipolar Dual Temperature Measurement module – DRM module2 Temperature measurements Configurable for PTC, NTC and SQD measurements Dual Bridge Measurement module – DBM module2 Bridge measurements Bipolar

PH/DT MCP & MNO Sensors –ATLAS (BT –ECTA-C –CS) 5 types for safety: Voltage measurements –DVM moduleTotal:28/14 Channels/Modules (MSSA+MSSB) Temperature measurements –DRM moduleTotal:32/16 Channels/Modules (MSSA+MSSB) Supra-conducting measurements –DRM moduleTotal:36/20 Channels/Modules (MSSA+MSSB) Differential measurements –DVM moduleTotal:20/10 Channels/Modules (MSSA+MSSB) Bridge measurements –DBM moduleTotal:24/16 Channels/Modules (MSSA+MSSB) Grand total:Total:140/76 Channels/Modules (MSSA+MSSB

PH/DT MCP & MNO CMS -SENSORS 4 types for safety: Voltage measurements –DVM moduleTotal:21/11 Channels/Modules (MSSA+MSSB) Temperature measurements –DRM moduleTotal:8/4 Channels/Modules (MSSA+MSSB) Differential measurements –DVM moduleTotal:10/5 Channels/Modules (MSSA+MSSB) Bridge measurements –DBM moduleTotal:5/3 Channels/Modules (MSSA+MSSB) Grand total:Total:44/23 Channels/Modules (MSSA+MSSB)

ATLAS 8 racks 12 chassis 4 control boxes 8 interface boxes 8 power boxes 260 modules + Heater cicuits A mess of cables... MSSA only ATLAS MSS Racks PH/DT MCP & MNO

Why upgrade? Mean Time Before Failure - Components Worst case calculations - Environmental factors Many opto-couplers (in series) Some components no longer available – Isolation amplifier – FPGA MSS started in 1998 – First installation (CS of ATLAS – Still running)

PH/DT MCP & MNO BACK-UP SLIDES

PH/DT MCP & MNO