Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1.

Slides:



Advertisements
Similar presentations
Troubleshooting guide (I) ProblemCauseSolution Washer doesn´t work but it does make noise The water supply valves are turned off The water supply valves.
Advertisements

General Safety Overview and Information
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
Operation of the FW-720 Unit 1. Side 1 2 Inlet Hand Crank.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Ice. Pure and Simple ™ Welcome to the Ice-O-Matic ® on-line training modules.
UNIT: Oxy-Fuel Welding, Brazing, Cutting and Heating LESSON: OXY-ACETYLENE EQUIPMENT SAFETY Standard B7.2 – Know how to properly set up, adjust, shut down.
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
FoamPro 1600 Series Fully automatic Class A foam ONLY
Technical support provided by: Highly Pathogenic Avian Influenza Control Programme SOP Use and Maintenance of High Pressure Washer Machine Market chain.
Chapter 11, Section 4. Changing a Shower Head 1.Turn off the water. 2.Remove the old showerhead. 3.Clean the showerhead stem of any corrosion or buildup.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
SubAir Unit location The first step to installing a SubAir System is to select a suitable location for the unit. The ideal location minimizes any disruption.
1 DIESEL FUEL TOOL ON VEHICLE DIESEL FUEL SYSTEM SERVICE MODEL Rx HD 888 INSIDE FILTER.
Filter manifold Holding tank Iron- manganese filter Aeration tank Control unit Pre- filter To storage tanks Backwash overflow SO2 vent Bypass Cutoff valve.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Power-Fill Operation Demonstration Power-Fill Operation Demonstration (See Installation and Operation Manual for detailed instructions)
Suction Pumps.
Dennis Sabre Fire Appliances
Unit 205: Cold water systems
Gauges and well logging
Electrical Power Systems
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
CARBURETED FUEL SYSTEM
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
Accessories Planned Maintenance. Types l Humidifiers l Air Cleaners l Heat Recovery Ventilators l Condensate Pumps.
Water Supply.
High Pressure Lifting Bags
Griner Drilling Service
Unit 205: Cold water systems
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by B. J. Benton United Pump and Controls, Inc.
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
EVAPORATIVE EMISSION CONTROL SYSTEMS
The Safe Transfer of Pressurized Gas. Collect the Necessary Tools and Equipment Safety Glasses for EVERYONE SCUBA Tank filled to 3000 psi Fill Station.
PRE s ENT TO TRANSFER CASE WORK…….. ALL TO THE GEAR BOX……. -MAINTAINANCE….. -CHANGING OIL GEAR BOX…. -CHECKING OIL GEAR BOX……
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
What to Expect When You’re Inspected GET PUMPED!.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
PSI Fill Station Operator (FSO) General info. on compressors Types of Fill stations Why to fill cylinders in a dry environment Fill station operator responsibilities.
Unit A 6-4 Mechanical Systems and Technology. Problem Area 6 Agricultural Power Systems.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Utility Vehicle Driving Safety. Types of Utility Vehicles Golf Carts Gator Vehicles Toro Vehicles Daihatsu.
Discover the Dosmatic Difference Trouble Shooting your Dosmatic injector for years of service.
Welcome Growers Discover the Dosmatic Difference Installing your Dosmatic injector for years of service.
MAINTENANCE INTERVAL SCHEDULE D6R TRACK TYPE TRACTOR 7AR EVERY 10 SERVICE HOURS OR DAILY.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
14 Refrigerant Recovery, Recycling, and Recharging.
EVAPORATIVE EMISSION CONTROL SYSTEMS
Water Heater Repair – What to Do When You Get No Hot Water?
Module 3 Domestic Heating/MMA Welding
Tips for Water Damage Restoration and Repair at Home
WASHERS.
Fuel Supply System Service
Service /13/2018 Water King Service 101
Troubleshooting 11/14/2018 Water King Service Seminar.
Overfill Prevention Technology and Maintenance
Preventative Maintenance & Service
What to Expect When You’re Inspected
Presentation transcript:

Tingo Pucará Water Supply System OPERATION AND MAINTENANCE MANUAL 1

I.Overview II. Safety III.Intake IV.Sedimentation/Pump Tank V.Pump VI.Pipeline VII.Storage Tank VIII.Distribution System IX.Maintenance CONTENTS 2

OVERVIEW 3

PLAN VIEW 4 Intake Sediment/ Pump Tank Pump Pipeline Storage Tank Distribution System

CONTACT 5 Sistemas Electricos Industriales Ave. 10 de Agosto N y Bellavista (Sector Parque de los Recuerdos) Telefax: / Quito – Ecuador Grimasa Av. 10 de Agosto (50-63) N y NN UU Telefono: Fax: Quito Ferreteria San Agustin Calle Quito y Hnos. Pdez (esq.) Telfs.: / Fax: (03) Latacunga - Ecuador Dismaconcobre CIA. LTDA. Valladolid N y av. La Coruna Telefax: / / Quito – Ecuador Acero Comercial Ecuatoriano S.A. Av. La Prensa N45-14 y Telégrafo 1 Telf.: / Fax: Interconstruc

SAFETY 6

Fill in holes and trenches at the end of every day SAFETY 7

All valves should be opened and closed slowly to avoid damage SLOWLY SAFETY 8

When entering a tank, always work with a partner: When entering a tank, the valve or switch controlling the flow into the tank should be off, and the person in the tank should lock it out: SAFETY 9 Lock

PUMP 10

Turning the Pump On (Manual Mode): 1.Inspection: Examine the pump and wiring, look for damaged wires in contact with metal piping or water. 2.Turning ON, Manual Mode: turn the knob from the OFF to the MANUAL Position. The green light should turn ON. 3.TURN OFF IMMEDEATLY if the red light comes on, OR if the pump pressure exceeds 475 PSI PUMP 11

Powering On the Pump (Auto Mode) 1.) Inspection: Examine the pump and wiring, look for damaged wires in contact with metal piping or water. 2.) Turning ON, Auto Mode: Simply turn the knob From the OFF to the AUTO Position. The Green Light should Turn ON. 3.) Turning OFF, Auto Mode: Simply turn the knob from the Auto to the OFF Position. TURN OFF IMMEDEATLY IF: If the Red Light Turns ON. OR the Pump Pressure Exceeds 475 PSI 12

Trouble Shooting in Auto Mode 1.) Inspection: Examine the lights on the front of the “Tablero” Green Light should Be ON, the Red Light, Cistern Empty Light and Supply Tank Full Light should be OFF. AT THIS TIME THE PUMP SHOULD BE ON 2.) Pump OFF, while in Auto Mode: If the Cistern water level is too low the Cistern Pump Light will be ON and the PUMP will turn OFF. If the Supply Tank water level is too high then the Supply Tank Full Light will be ON and the PUMP will Turn OFF. Supply Tank Float Switch Condition: PUMP ON SWITCH Normally CLOSED PUMP OFF (Tank Full) SWITCH Normally OPEN Cistern Float Switch Condition: Switch Normally CLOSED PUMP ON SWITCH OPEN PUMP OFF (Cistern Empty) 13

Servicing The “Tablero” 1.) Opening the “Tablero”: The “tablero” control unit should only be opened or serviced by the equipment vendor or an approved member of the Tingo Pucara Water Committee. A key is required to Open the “tablero” Control Unit 2.)Before opening the “tablero” turn Power OFF at the Pump House Service Panel. By Switching the two 50A breakers into the OFF Position. Special Key Required“Tablero” Pump House Service Panel Move Breaker to OFF 14

Servicing The “Tablero” 3.) When the “Tablero” is OPEN: Upon opening the “tablero” the user may examine the subcomponents and wiring of the “tablero” for loose electrical connections or visible damage. The Pump Technician should take written notice of the damage and contact the equipment vendor. DO NOT ATTEMPT TO REMOVE PARTS FROM THE “TABLERO” UNLESS INSTRUCTED TO DO SO BY THE VENDOR. Examine Relay Contacts for Damage. Relay Contacts are mechanical and have A given life expectancy. 15

PIPELINE 16

Start Up: Open the Shut off valve. Turn the lever slowly to avoid damage. OPEN CLOSED SLOWLY PIPELINE 17

PIPELINE Maintenance: Every six months, turn ball valves slowly on and off, 3 or 4 times to make sure they are not stuck. If any valves are leaking, fix them right away. 18 SLOWLY

PIPELINE Maintenance (Continued): After every storm, walk along the pipeline and look for any signs of dirt washing away Fill in any bad areas right away 19

Maintenance (Continued): Look for any sign of water leaking along pipeline Look for holes, muddy or wet spots, and areas where dirt is washing away Fix leaks right away PIPELINE 20

STORAGE TANK 21

Shut Down Procedure: 1.Open the clean-out valve 2.Close the distribution valve 1 2 STORAGE TANK 22

Shut Down Procedure (Continued) 3.Remove all solids, and keep solids away from drain. STORAGE TANK 23

Shut Down Procedure (Continued) 4.Thoroughly wash with disinfectant like bleach 5.Rinse the tank with clean water STORAGE TANK 24

Normal Operation: Check that water is not coming out of overflow pipe. If water is coming from the overflow pipe, turn off the pump and check the float switch. STORAGE TANK 25

Start Up Procedure: 1.Close the Clean-Out Valve 2.Open the distribution Valve 1 2 STORAGE TANK 26

Start Up Procedure (Continued): 3.Check to make sure the float switch is working correctly. STORAGE TANK Switch up: Pump should be off Switch down: Pump should be on 27

DISTRIBUTION SYSTEM 28

DISTRIBUTION SYSTEM 29 Maintenance: 1.Walk the system and check for wet areas that could be leaks

DISTRIBUTION SYSTEM 30 Maintenance (Continued): 2.Check for leaks at valve and PRV boxes visually and by feel.

DISTRIBUTION SYSTEM 31 Maintenance (Continued): 3.Repair leaks and replace any defective valves or fittings.

DISTRIBUTION SYSTEM 32 Maintenance (Continued): 4.Check that Flow Meters are working properly by opening the valve on the tap stand and watch that the meter is operating.

DISTRIBUTION SYSTEM 33 Maintenance (Continued): 5.Attach pressure valve to each tap stand. Open valve and record the pressure.

DISTRIBUTION SYSTEM 34 Maintenance (Continued): 6.Check for leaks at each tap stand, and repair or replace valves as needed.

DISTRIBUTION SYSTEM 35 Maintenance (Continued): 7.Every six months, turn ball valves slowly on and off, 3 or 4 times to make sure they are not stuck. If any valves are leaking, fix them right away. SLOWLY

Maintenance (Continued): 8.Add permanent location stakes when new pipelines are installed. DISTRIBUTION SYSTEM 36

This manual was written by the members of the EWB-USA Pittsburgh Professional Chapter, for our friends in the community of Tingo Pucará.