Valuing Demand Response Resources (DRR) -- Update on IEA Project -- Presented at: Spring 2005 PLMA Conference April 29, 2005 Daniel Violette, Ph.D. Summit.

Slides:



Advertisements
Similar presentations
Current Status and Outlook Presented at PLMA Meetings: Demand Response: Case Studies from the Summer of 2006 Sponsored by the Peak Load Management Alliance,
Advertisements

Value-at-Risk: A Risk Estimating Tool for Management
National Town Meeting on Demand Response Session A – Estimate It, Measure It, Verify It Demand Response Coordinating Committee (DRCC) Renaissance Washington.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Software Analysis Tools
Assessing Uncertainty when Predicting Extreme Flood Processes.
Will CO2 Change What We Do?
Traci L. Bender Nebraska Public Power District APPA Business & Financial Conference September 15, 2009 Risk Analysis.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Sensitivity and Scenario Analysis
Engineering Economic Analysis Canadian Edition
Integrating Distributed Energy Resources 2015 Austin Electricity Conference AT&T Conference Center April 9, 2015, Page 1 Daniel Violette, Managing Director,
Company Enterprise Risk Management & Stress Testing Case Study.
Value at Risk (VAR) VAR is the maximum loss over a target
Methodologies for Quantifying Energy Security in the Power Sector William Blyth 24 th April 2005.
1 RELIABILITY AND COMPETITIVE ELECTRICITY MARKETS POWER Research Conference UC Berkeley March 19, 2004 Paul Joskow MIT, CEEPR, CMI and Jean Tirole IDEI,
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Designing the Marketing Channel
Designing Marketing Channels
Opportunity Engineering Harry Larsen The Boeing Company SCEA 2000 Conference.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
Background Recent Experience draws from two white papers co-authored for the Peak Load Management Alliance ( “Demand Response: Principles.
A Comprehensive / Integrated DR Value Framework Presented at: Demand Response Research Center TAG Technical Advisory Group Meeting Pacific Energy Center.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
RISK & CAPACITY INVESTMENT INCENTIVES IN ELECTRICITY MARKETS Peter Jackson Department Of Management University Of Canterbury.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
Network Customer Meeting Access Metric Update November 16, 2006.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Engineering Economic Analysis Canadian Edition
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 12 Financial and Cost- Volume-Profit Models.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
The Council’s Approach to Economic Risk Michael Schilmoeller Northwest Power and Conservation Council for the Resource Adequacy Technical Committee September.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
DFA and Reinsurance Structuring Presented by Joseph W. Wallen, FCAS General Re Capital Consultants CAS Ratemaking Seminar March 9-10, 2000 General Reinsurance.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
Balanced Portfolio for Reliable Electricity System YES Inc. Brief Assessment.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
CTMS Annual Retreat 2009 “Making connections” Dalia Patino Echeverri, Assistant Professor of Energy Systems and Public Policy Nicholas School of the Environment.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
The Discount Rate in the Plan Wally Gibson NWPPC Power Committee – Kah-Nee-Ta July 15, 2003.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Approaches to quantifying uncertainty-related risk There are three approaches to dealing with financial and economic risk in benefit-cost analysis: = expected.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Chuck Goldman Lawrence Berkeley National Laboratory
Demand Response in the 7th Power Plan
Energy Risk Management Credit Rating Perspective
Key Findings and Resource Strategy
Forecasting and Operations CAISO Case
Portfolio Analysis Mike Hopkins
Software Analysis Tools
Presentation transcript:

Valuing Demand Response Resources (DRR) -- Update on IEA Project -- Presented at: Spring 2005 PLMA Conference April 29, 2005 Daniel Violette, Ph.D. Summit Blue Consulting Boulder, Colorado

2 Focus Task 4: IEA Task XIII Work 1.Develop a Benefit-Cost Framework that appropriately supports the economic case for DRR as part of a resource plan. 2.Develop "approaches" for determining the value of including DRR in a resource portfolio. –Correctly valuing DRR will produce a resource plan with the appropriate amount of DRR. (Note: Resource planning is where cost trade-offs between alternatives are examined.) –Differences in costs between plans is one estimate of the value putting a resource into the field (e.g., a plan with no DRR vs. a plan with DRR). 3.Ex-Post Evaluation of DRR – Discuss approaches for evaluating and verifying the benefits and costs of specific DRR put into the field. –Assess the economic value of to DRR as part of these ex post evaluations. –Take into account the longer-term impacts from DRR that might represent important components of total benefits (i.e., develop an annual average)? –What values justify maintaining DRR as a resource over the long term?

3 Identification of Benefits and Costs: 1. Market-Wide Perspective 2. Private-Entity Perspective

4 Market-Wide Benefits Categories 1. Market-wide price benefits: –Reduction in the average price of electricity in the spot market. –Reduced costs of electricity in bilateral transactions (over a 5 to 10 year period). –Reduced hedging costs (e.g., reduced cost of financial options). 2. Market-wide reliability benefits: –Increased overall reliability. –Insurance value – lowers costs of extreme events, i.e., low- probability, high-consequence events. –Real option values – creates flexibility to address future events. –Portfolio benefits – increase in resource diversity. 3. Other values (may be addressed by “side” calculations) …

5 Market-Wide Benefits Categories (cont.) 3. Other Values (cont.) : –Reduced market power (situational and behavioral). –Overall Market Efficiency – better interaction of demand and supply provides appropriate incentives for the development and application of new technology thereby increasing overall productivity (e.g., 1% per year). –Customer Values: Increase in customer choice. Equity for those customers whose electricity use is flexible (an important attribute of demand is now valued). Possible increase in services. –Environmental Values from more efficient resource use (???) –Other Values (???)

6 Benefit-Cost Studies: Recent Experience

7 Review: Planning Case Studies 1.Proxy unit methods, i.e., beat the costs of a gas turbine. Now, the value of DRR is the difference in costs between the two resources. 2.“Fit” a DRR unit into a supply-side planning model using program costs and MW reduction as the “production of a generating unit” with DRR values being the difference in market costs between two scenarios. (KCPL Study). 3.One example attempting to look at a market value versus private value test using a forward-looking 5-year period by a distribution company (NSTAR – SBC study) 4.Partial portfolio approaches using methods to determine value of call options and changes in portfolio risk as measured by “value at risk.” 5.Several recent studies using probabilistic and Monte Carlo methods to explicitly address risk management and the role of DRR -- Northwest Power Planning Council Study (2004), Resource Adequacy filings by California IOUs (2004).

8 NWPPC Power Plan DRR Benefits recognized: –5 th DRAFT Power Plan first to treat DRR as a resource –Contributes to improved reliability and prevent outages; –Mitigates the risk of high market prices; –Helps stabilize electricity prices; and, –Reduces both cost and risk compared to developing new generation Modeling demand response (NWPPC). –A Monte Carlo simulation is run for all scenarios producing a cost distribution for each plan. –Model allows for 1,000 futures for each plan and multiple plans are analyzed to assess cost and risk differentials.. –Risk management focuses on a type of Value At Risk (VAR), i.e., the average value for the worst 10% of the outcomes. –Model is run with and without DRR in the portfolio using the assumption that 2,000 MW of DRR could be developed by 2020.

9 NWPPC Comments: “Planning for the future requires assessing risk. This involves characterizing the key uncertainties the power system faces.” “Can planners, through experience, analysis, and informed judgment, develop reasonable characterizations of future uncertainty that will help illuminate resource choices for the region? The Council believes the answer is ‘yes’.” Key uncertainties considered include: –Hydro availability –Load uncertainty –Plant availability –Fuel prices –Environmental regulation –Net imports, i.e., outside market resource development and sales/purchases. –Stress tests of extreme circumstances were included – “various sources of risk conspire to produce particularly harsh futures…”

10 NWPPC Predicted Value of DRR According to the model simulations: –DRR is used in 89% of the years in the study. –Less than 1% of DRR capacity is used in 79% of these years. –Less than 10% of DRR capacity is used in 90% of these years. –Only a few years show DRR used to near full capacity. Overall value: –Without DRR, the expected net present value increase in system costs is $100 million, while system risk increases by $500 million. –For constant levels of risk, the loss of DRR increases expected costs by about $300 to $500 million. –Without DRR, risks increase in the range of $400 million to $1 billion at given levels of expected cost. Policy recommendations –Develop 500 MW of DR over the next five years; and, –Develop up to 2,000 MW of DRR over the 20-year period.

11 Value of DRR What does this say about the value of DRR in a market? –For markets with integrated utilities? –For restructured markets with retail competition? DRR values include “insurance” and “portfolio” benefits. –These need to be calculated against “future scenario(s).” –Even in an organization that is not responsible for resource adequacy planning, determining a value for DRR requires: 1.The development of future scenarios; and, 2.The cost reductions attributable to DRR in those futures. –DRR values need to be measured against a long-term scenario to capture low-probability, high-consequence events. –Key DRR values can only be captured when uncertainty is dimensioned.

12 Where do we go from here? Work to better (i.e., more effectively) communicate of the benefits of DRR to reliability organizations, resource planners, regulators and other decision makers. Use the framework and structure common to the industry. Getting DRR into the field means estimating and supporting its value as a resource.

13 Implications Tools exist to assess portfolios of traditional and DRR options. This requires: 1. Appropriate resource characterization. 2. Representations of the uncertainty around key factors in the analysis. The challenge is to change perspectives and get planners to move out of their comfort zone: –Better (i.e., more accurate) representations of DRR resources; and, –Dimension and incorporate uncertainty. Representing uncertainty and the value of information over time is the key challenge as both contribute to the value of options and hedges; and therefore to the value of DRR. This is generally new to planners in the DRR context.

14 Steps in Valuing DRR Overall, the process will include developing “futures” / “scenarios” against which DRR will be valued. Step 1: Determine pivot factors influencing the market costs of electricity. Step 2: Develop the probability distributions, i.e., assess uncertainty around these factors and express that uncertainty via probability distributions. Step 3: Create the “futures” against which portfolios will be assessed, i.e., combine the probability distributions to create a joint probability surface. Step 4: Draw a set of discrete futures from the probability surface, i.e., each draw will include a value for each key factor (100 or more draws are likely to be needed). Step 5: Run each future through a resource planning (i.e., cost model) providing 100 (or more) costs that are incorporated into a distribution of costs for a given set of available resources. Step 6: Repeat Step 5 for different portfolio’s of resources to determine the cost differential and reliability differential for “with DRR” and “with-out DRR” portfolios.

15 Tentative IEA Research Plan: Evaluate Four DRR Programs Model all DRR programs in a similar fashion as supply- side resources within a comprehensive resource planning framework. Programs to be examined: –Interruptible Program – Known amount of load reduction based on a two-hour call period. –Direct Load Control Program – Known amount of load reduction with 5 to 10 minutes for notification. –Pricing Program – Modeled as a resource using price elasticity factors to calculate demand reduction with uncertainty in response. –Dispatchable Purchase Transaction – A call option where the model looks at the “marginal system cost” and decides to “take” the purchase when that price is less than the marginal system cost.

16 Dimensioning Uncertainty in DRR Valuation Expressing and dimensioning uncertainty for use in analyses. –Uncertainty is what makes hedges and options valuable. –If we could use point estimates and were certain about their values, there is no need for options or hedges since the optimal solution would simply be picked. –Industry has used few tools to express uncertainty Key problem -- How to dimension uncertainty for use in planning analyses (simplest to more complex): 1.Scenario analyses (low, medium and high cases) 2. Range estimates -- construct confidence intervals based on key inputs. 3.Range estimates with the range filled in with likelihood estimates to provide a rough-cut probability distribution.

17 Scenarios Versus Distributions An assessment about likelihoods of the different scenarios can provide additional, useful information. Individuals familiar with the market can supply the “best” available information on probabilities. These are derived from judgment, expert opinion and augmented by secondary research. End-result: A distribution is a better representation of the scenarios being assessed

18 Simplified Example -- Decision Tree Objective: Minimize Revenue Requirements over 10 years. Time Step: One-year steps over a 10-year period. Proxy Example: Real application would include distributions instead of single probability nodes. Time Period T = 1 Other Time Steps Peak Demand Metrics Seasonal Energy Demand Metrics Fuel Prices High.5 High.7 High.6 Low.4 Low.3 High.5 Low.5 High.4 Low.5 Low.6 Low.5 $$$ $ $ $ $ $ $ $$$ $ $ $ $$$ $ $ $ $$$ NPV VAR Supply Portfolio #1 Supply Portfolio #2 Supply Portfolio #3

19 Uses of Information Calculate reductions in electricity price (using resource costs as a proxy) from comparing different resource portfolios under uncertainty: 1. No available DRR. 2. Limited DRR options in portfolio. 3. Aggressive DRR options in portfolio Calculate costs of achieving higher system reliability using each portfolio. Calculate risk management parameters – Value at Risk and/or the Loss Function. –What is the down-side of a resource portfolio selection? –The “loss function” is the distribution of costs (i.e., losses) that result from selecting a portfolio other than the optimal portfolio.

20 Contact Information Daniel Violette, Ph.D. Summit Blue Consulting Boulder, Colorado Ph