TRANSFORMATION OF UGANDA MANAGEMENT INSTITUTE INTO A BUSINESS-ORIENTED PUBLIC ENTERPRISE By Dr John Kiyaga-Nsubuga Deputy Director, UMI October 2003.

Slides:



Advertisements
Similar presentations
The Five Working Groups Faculty Development Scaling-Up Post-Graduate programmes and 1.Research & Development 2.Innovation 3.Industry - Institute Interaction.
Advertisements

LEADERSHIP GROUP 5 TH JULY 2011 BUDGET 2012/13 – 2014/15.
Understanding the National Financing Issues: NIGERIA Professor Ignatius UVAH, PhD (Cantab) Deputy Executive Secretary, National Universities Commission,
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Civil Service Performance Assessment in Lithuania: Current.
GOVERNMENT OF THE REPUBLIC OF MOLDOVA CENTRAL PUBLIC ADMINISTRATION REFORM ( ): concept and results December 2007 Chisinau.
Training Institute of Public Administration Tirana, ALBANIA
PROVINCIAL FRAMEWORK FOR MONITORING OF THE GOVERNMENT WIDE 5-YEAR LOCAL GOVERNMENT STRATEGIC AGENDA 14 SEPTEMBER 2007 PROVINCIAL FRAMEWORK FOR MONITORING.
Build and maintain democratic and decentralized local government institutions that are capable to participate in the development of social and economic.
College Strategic Plan by Strategic Planning and Quality Assurance Committee.
IT in Education. No. of Students Enrollment Rate Annual Increase Employees Schools Budget General Education 1,100,000 98,7% 6% 47, US$M.
Tomislav Skračić, MA Undergraduate English Course for MARITIME MANAGERS 6th Semester Essential reading: T. Skračić, Waypoint – English Textbook for Maritime.
Presentation to Portfolio Committee on Higher Education.
Challenges of Higher Education in Cyprus Efstathios Michael Senior Education Officer Department of Higher and Tertiary Education Ministry of education.
1 Implementing an External Audit Reform Program  A country case study Uganda Presented by: John F. S. Muwanga Auditor General of Uganda May 24, 2003.
Quality assurance in IVET in Romania Lucian Voinea Mihai Iacob Otilia Apostu 4 th Project Meeting Prague, 21 st -22 nd October 2010.
THE PLACE OF USEFUL LEARNING The University of Strathclyde in Glasgow Christine Sinclair Centre for Academic Practice.
THE STATISTICAL ACT AND THE NATIONAL STATISTICAL SYSTEM UGANDA EXPERIENCE PRESENTATION BY JOHN B. MALE-MUKASA EXECUTIVE DIRECTOR UGANDA BUREAU OF STATISTICS.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
PEM-PAL - 2nd Internal auditors’ Community of Practice Workshop
Establishment and Development of the Internal Audit System for the Public Sector in Kyrgyz Republic INTERNAL AUDIT COMMUNITY OF PRACTICE ISTANBUL
States and Government Companies Murilo Barella Brasília – 12 Março 2013.
Strategic Plan for Enrollment Management Taskforce Presentation August 24, 2010 Recruitment Sub-group.
Theme: Innovations in Addressing Rural Finance Challenges in Africa INSTITUTIONAL INTRODUCTION COFFEE DEVELOPMENT FUND BY GEORGE O. OOKO MANAGING TRUSTEE.
GOVERNMENT OF ROMANIA MINISTRY OF PUBLIC FINANCE MANAGING AUTHORITY FOR COMMUNITY SUPPORT FRAMEWORK Evaluation Central Unit Development of the Evaluation.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing resources Finance – People – Knowledge Part 1 Strengthening Statistics Produced in.
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
LONG TERM STRATEGIC FINANCING & CAPITAL CAMPAIGNS April 6, 2010.
UNIVERSITY OF DAR ES SALAAM, TANZANIA ACTIVITIES ON INTERNATIONAL RELATIONS: EXPERIENCE AND CHALLENGES By. H.R.T. Muzale and R. Toba.
Roles and Responsibilities Of the library trustee NJLTA New Jersey Library Association.
© HAUS The 2013 International Conference on Human Resource Development in the Public Sector - Leading Change & Quality Training Date 7-8 October 2013 Changes.
Minnesota State Colleges and Universities Revenue Fund Overview and FY15 Student Union Budget Information Presented to the Student Fee Management Committee.
Council on Higher Education: Three-year Business Plan and MTEF Budget Presentation to the Portfolio Committee on Higher Education and Training.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
AUDITOR-GENERAL Presentation to the Public Service and Administration Portfolio Committee on the appointment and utilisation of consultants Report of the.
Briefing on Progress made with regard to Prevention and Management of Child Abuse and Neglect Especially Child Sexual Abuse Presentation at the Portfolio.
Empowering the Pa Enua Government 26 September 9am Russell Thomas Cook Islands.
«Policies in Personnel Training» The Russian Federation State Statistics Committee (Goskomstat) A.P. Kakura.
CHE Business Plan Mission The mission of the CHE is to contribute to the development of a higher education system that is characterised by.
1 BRIEFING ON THE STAFFING SOUTH AFRICA’S UNIVERSITIES’ FRAMEWORK (SSAUF) Presentation to the Portfolio Committee on Higher Education and Training 25 August.
Legal Practice Bill Costing Portfolio Committee on Justice and Constitutional Development.
An Update on the Establishment of the Campus Presentation to the UWIDEC Staff, Mona on Wednesday 7 th November 2007.
The South African Human Rights Commission 2009/10 Annual Report.
BOSNIA AND HERZEGOVINA Cabinet of the Chairman of the Council of Ministers Public Administration Reform Coordinator’s Office PUBLIC ADMINISTRATION REFORM.
ACP Finance DC FB 4.Appointment of Taskforce Team Taskforce Team 5.Environment Scanning Plan (ESP) 8.Potential & feasible? 7.Confirm the ESP Result 10.Detailed.
ANNUAL GENERAL MEETING Summary to the Annual Report 2000/2001 of the ISETT SETA Mateli Mpuntsha Chief Executive Officer 09 April 2002.
Ratification of the International Agreement of the Collaborative Africa Budget Reform Initiative (CABRI ) Presentation to Select Committee on Finance Tuesday.
Annual Report Moving Forward - Theme for this year’s annual report Successful STANDISATION played a significant role in improving the results of the core.
STANDING COMMITTEE ON APPROPRIATIONS BRIEFING 2011/12 EXPENDITURE Date: 29 August 2012.
REPUBLIC OF BULGARIA MINISTRY OF FINANCE CURRENT CHALLENGES IN BUDGET REFORM SOFIAMR. LYUBOMIR DATZOV 03 DECEMBER 2004DEPUTY MINISTER
WORKSHOP ON ORGANIZATION & MANAGEMENT OF NATIONAL STATISTICAL SYSTEMS DAKAR, SENEGAL 28 TH SEPTEMBER – 1 ST OCTOBER 2010 KWENAGAPE KENNY MOGOTSINYANE CENTRAL.
The Strategic Responsibilities of Governing Bodies Andrew Wilkinson Chair, Board of Governors, University of Wales, Newport and Chair of Chairs of Higher.
Karnataka Public Financial Management and Accountability Study Launch Presentation September 14, 2004.
PRESENTATION TO THE PORTFOLIO COMMITTEE Presented by Mr G Mokate SUPPORT SERVICES.
1 BRIEFING TO THE PORTFOLIO COMMITTEE ON THE UTILIZATION OF CONSULTANTS BY DWAF 8 June 2005.
What is Public Administration Reform? The resource for achieving more efficient, more effective and more accountable state administration The resource.
Strategic Planning Update
York, North Yorkshire & East Riding Local Enterprise Partnership Bio-economy Growth Fund Application process September 2016.
FRA Building Development 2015
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
Background Uganda Skills Development Project (USDP)
Presented to the Student Fee Management Committee (SFMC)
Sybi Hida ALBANIA February, 2005
Sybi Hida ALBANIA February, 2005
IMPLEMENTATION OF THE SOUTH AFRICAN LANGUAGE PRACTITIONERS COUNCIL ACT, 2014 (Act No. 8 of 2014) PRESENTED TO THE SELECT COMMITTEE ON EDUCATION & RECREATION.
United Nations Voluntary Fund on Disability (UNVFD)
Presentation to the Portfolio Committee - Labour
Ministry of National Economy of The Republic of Kazakhstan
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
11 July 2019 APP Presentation to the Joint Standing Committee on Financial Management of Parliament June 2019.
Presentation transcript:

TRANSFORMATION OF UGANDA MANAGEMENT INSTITUTE INTO A BUSINESS-ORIENTED PUBLIC ENTERPRISE By Dr John Kiyaga-Nsubuga Deputy Director, UMI October 2003

UMI’S Status Before the Transformation Set up in 1969 as the Institute of Public Administration to cater for in-service training of public servants Set up in 1969 as the Institute of Public Administration to cater for in-service training of public servants Attached to the Ministry of Public Service (MPS) as one of the departments. MPS controlled the institute’s personnel and set their remuneration levels Attached to the Ministry of Public Service (MPS) as one of the departments. MPS controlled the institute’s personnel and set their remuneration levels Charged Government pre-determined fees for courses Charged Government pre-determined fees for courses

UMI’S Status Before the Transformation Content of postgraduate diploma programmes [Diploma in Business Management, Diploma in Public Administration, Diploma in Human Resource Management) approved by Makerere University, which also made the awards. Content of postgraduate diploma programmes [Diploma in Business Management, Diploma in Public Administration, Diploma in Human Resource Management) approved by Makerere University, which also made the awards. Government subvention inadequate to meet recurrent costs or to upgrade the Institutes facilities (for FY 1992/93 it was approximately £90,000) Government subvention inadequate to meet recurrent costs or to upgrade the Institutes facilities (for FY 1992/93 it was approximately £90,000)

Institutional Transformation: Phase 1 (1987 – 1990) (supported by ODA) Survey done by consultant architects to determine the degree of rehabilitation required on the Institute’s physical infrastructure. Survey done by consultant architects to determine the degree of rehabilitation required on the Institute’s physical infrastructure. Remedial work undertaken comprising roof replacement, and repairs to windows, walls, plumbing, electrical and kitchen installations Remedial work undertaken comprising roof replacement, and repairs to windows, walls, plumbing, electrical and kitchen installations

Institutional Transformation: Phase I (1987 –1990) (supported by ODA) cont.. Improvements made on existing classrooms through addition of air conditioning, sound proofing and other acoustic improvements Improvements made on existing classrooms through addition of air conditioning, sound proofing and other acoustic improvements

Institutional Transformation: Phase I cont… Three additional classrooms and further office space created in the annex building Three additional classrooms and further office space created in the annex building

Institutional Transformation: Phase II ( Supported by ODA through Glasgow Caledonian University, UK) Institutional Transformation: Phase II ( Supported by ODA through Glasgow Caledonian University, UK) Objective: To enable the Institute to contribute to the effectiveness of the Public Service Reform Programme that started in i. Conditions set by Donors Government to provide suitable budgetary provision and to release the funds for running and maintaining the Institute.Government to provide suitable budgetary provision and to release the funds for running and maintaining the Institute.

Government to revise the Uganda Institute of Public Administration Act and to pass it into law to allow the Institute to operate autonomouslyGovernment to revise the Uganda Institute of Public Administration Act and to pass it into law to allow the Institute to operate autonomously Government to appoint a substantive principal of the Institute (the existing one had been in acting capacity for a long time) Government to appoint a substantive principal of the Institute (the existing one had been in acting capacity for a long time)

As an interim measure, Government to allow the Institute to sell its services to outside organisations and to apply the income towards its activities (provided public service training takes precedence over other activities). As an interim measure, Government to allow the Institute to sell its services to outside organisations and to apply the income towards its activities (provided public service training takes precedence over other activities). The Principal to prepare a corporate plan for the Institute. The Principal to prepare a corporate plan for the Institute.

ii. Activities (a) Enactment of new legal framework Uganda Management Institute Statute enacted by Parliament in 1992 giving the Institute corporate status and substantial autonomy, under the control of its own Board, to among other things:

Establish and run its own certificate, diploma and degree programmes, and give its own awardsEstablish and run its own certificate, diploma and degree programmes, and give its own awards generate its own resources and apply those resources to the running of its activitiesgenerate its own resources and apply those resources to the running of its activities hire and manage its own personnelhire and manage its own personnel

(b) Systemic and Structural Changes Staff retrenchment exercise to weed out non-core staff (some redeployed back into MPS, others let go with severance packages)Staff retrenchment exercise to weed out non-core staff (some redeployed back into MPS, others let go with severance packages) New organisational structure developed and implementedNew organisational structure developed and implemented All professional staff job descriptions revisedAll professional staff job descriptions revised

UMI staff formally transferred out of the public service and issued new three-year contracts, with improved terms and conditions of service. UMI staff formally transferred out of the public service and issued new three-year contracts, with improved terms and conditions of service. A major recruitment exercise for professional staff undertaken, including appointment of a new Deputy Director and new Heads of Department A major recruitment exercise for professional staff undertaken, including appointment of a new Deputy Director and new Heads of Department A register of part time associate consultants established (to assist full time professional staff) A register of part time associate consultants established (to assist full time professional staff)

A new staff appraisal system designed and agreed A new staff appraisal system designed and agreed Short course portfolio reviewed and a prospectus for new short courses launched in 1995/96 Short course portfolio reviewed and a prospectus for new short courses launched in 1995/96

A new commercial accounting and financial management system designed to improve the Institute’s financial planning and management capacity (SAGE software installed, later replaced by NAVISION). A new commercial accounting and financial management system designed to improve the Institute’s financial planning and management capacity (SAGE software installed, later replaced by NAVISION). A costing and pricing structure developed to maximise revenue earning potential A costing and pricing structure developed to maximise revenue earning potential

Long course portfolio revised; courses modularised and new ones developed Long course portfolio revised; courses modularised and new ones developed A draft marketing strategy developed A draft marketing strategy developed A rigorous quality assurance system put in place comprising student evaluations at the end of every course (whether short or long); weekly evaluations for all certificate, diploma and postgraduate diploma courses; monthly meetings between the Deputy Director and class representatives; and A rigorous quality assurance system put in place comprising student evaluations at the end of every course (whether short or long); weekly evaluations for all certificate, diploma and postgraduate diploma courses; monthly meetings between the Deputy Director and class representatives; and

control points at module leader, course manager, Division Head, Deputy Director and Academic Committee levels

(c) Immediate Impact Significant increase in income from short courses, in spite of increases in course fees in 1994/95. That year, revenue from short courses constituted 57.6% of total revenue. Previously was ~20%Significant increase in income from short courses, in spite of increases in course fees in 1994/95. That year, revenue from short courses constituted 57.6% of total revenue. Previously was ~20% Sharp decline in staff turn-over following the introduction of enhanced terms and conditions of service. There was no staff turn-over in 1995 at all.Sharp decline in staff turn-over following the introduction of enhanced terms and conditions of service. There was no staff turn-over in 1995 at all.

Increased demand for modularised programmes, especially those running in the evening. Increased demand for modularised programmes, especially those running in the evening.

(d) Current Operations A networked Local Area Network (LAN) computerised management information system is in placeA networked Local Area Network (LAN) computerised management information system is in place The Finance Division provides management with information on the Financial status on a weekly basisThe Finance Division provides management with information on the Financial status on a weekly basis

Each Division develops an annual plan indicating the scale of its proposed activities and revenue forecasts. Every course must be justified in terms of its revenue potentialEach Division develops an annual plan indicating the scale of its proposed activities and revenue forecasts. Every course must be justified in terms of its revenue potential A ten-year strategic plan ( ) is in place and is being implemented.A ten-year strategic plan ( ) is in place and is being implemented.

The Institute generates 85% of its recurrent expenditure. Government subvention constitutes 15% (mainly for utilities). The Institute generates 85% of its recurrent expenditure. Government subvention constitutes 15% (mainly for utilities). Current annual budget is ~US$1.2million (in1998/99 was ~US$0.8million) Current annual budget is ~US$1.2million (in1998/99 was ~US$0.8million) All management, administrative and teaching staff have annual performance agreements based on the new staff appraisal instrument. Everyone in the Institute has a three-year contract. All management, administrative and teaching staff have annual performance agreements based on the new staff appraisal instrument. Everyone in the Institute has a three-year contract.

Business has greatly expanded. From January 1996 to August 2003 the Institute conducted 690 short courses which have benefited 14,557 participants. In the same period 4,399 participants attended long courses (certificate, diploma and postgraduate programmes). The Masters in Management Studies (MMS) degree programme is over-subscribed by 100%.Business has greatly expanded. From January 1996 to August 2003 the Institute conducted 690 short courses which have benefited 14,557 participants. In the same period 4,399 participants attended long courses (certificate, diploma and postgraduate programmes). The Masters in Management Studies (MMS) degree programme is over-subscribed by 100%.

(e) Challenges Inadequate space/infrastructure (classrooms, office space, etc..) to handle all the business Inadequate space/infrastructure (classrooms, office space, etc..) to handle all the business Inadequate capital expenditure to invest in big infrastructure projects (e.g. office and classroom blocks). But we have invested resources in improving grounds, establishing a LAN, buying computers and accessories, buying furniture, maintaining buildings, etc Inadequate capital expenditure to invest in big infrastructure projects (e.g. office and classroom blocks). But we have invested resources in improving grounds, establishing a LAN, buying computers and accessories, buying furniture, maintaining buildings, etc

The Institute’s outreach programmes need to be greatly expanded to meet demand outside Kampala. The Institute’s outreach programmes need to be greatly expanded to meet demand outside Kampala. Inadequate resources to pay for teaching staff’s capacity enhancement programmes, especially PhDs. Inadequate resources to pay for teaching staff’s capacity enhancement programmes, especially PhDs.