Engineer Research and Development Center, Alexandria, VA

Slides:



Advertisements
Similar presentations
Establishing a New Accreditation Program in the U.S.
Advertisements

VOLUNTARY PRINCIPLES ON SECURITY & HUMAN RIGHTS. What are the Voluntary Principles? Tripartite, multi-stakeholder initiative Initiated in 2000 by UK Foreign.
Tips and Resources IASC Cluster/Sector Leadership Training
9/22/04 Texas Teacher STaR Chart School Technology and Readiness Chart A Tool for Planning and Self-Assessing
ENQA – QAA meeting 8-9 December 2005 Birmingham, UK 9 December, – Feedback from workshop groups.
Long Term Care Provider Associations Meeting Sharon White CMS – Region V August 22, 2007 F314 – Pressure Ulcers.
ODOT Errors & Omissions Policy ODOT Errors & Omissions Policy ODOT/ACEC Conference Presentation April 17, 2007 Cathy Nelson, ODOT.
Philadelphia District
Prior Learning Assessment and Recognition (PLAR) CANADA Canadian Information Centre for International Credentials (CICIC) at the Council of Ministers of.
Educational Specialists Performance Evaluation System
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Working Together to Improve the Decision Making Process 2013 WTBA/WisDOT Contractor-Engineer Conference January 31, 2013.
Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 1 “ASSESSMENT AND REPORTING OF ACOUSTIC CLEARANCE SURVEYS.
Geospatial Issues update CR GIS survey summary (most slides on this) SBW polygons white paper NGWT geospatial element Flood map inundation NSTEP training.
Assessment of Class S4 Streams in the Central Interior to Evaluate Riparian Practices Implemented under the Forest Practices Code Peter J. Tschaplinski.
WELCOME TO INNG EMERGENCY OPERATIONS LIAISON OFFICER OVERVIEW
Quality and reliability management in projects (seminar)
5.00 Understand Promotion Research  Distinguish between basic and applied research (i.e., generation of knowledge vs. solving a specific.
Fundamentals of IRB Review. Regulatory Role of the IRB Authority to approve, require modifications in (to secure approval), or disapprove all research.
DCAA – Fort Walton Beach Branch Office
Independent Educational Evaluations Developed by Contra Costa SELPA As Recommended for LEA Board Policy
Congress and Contractor Personal Conflicts of Interest May 21, 2008 Jon Etherton Etherton and Associates, Inc.
State of PLAR at Alberta Post-Secondary Institutions by: Lucille Walter, Chair September 22,,2005 A lberta C ouncil on A dmissions and T ransfer.
Sales Organization Structure and Sales Force Deployment Module Four.
Principles of Marketing
Learning Partner program requirements Worldwide Learning Partner Organization August 2014.
BSHC LIDAR Seminar Introduction 27/28 May May 2014BSHC LIDAR Seminar Introduction, Thomas Dehling contents Survey tasks Survey methods Baltic.
Purpose of the Standards
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
1 Surveying Market Pay Just as skill, effort, responsibility, and working conditions have been used to differentiate rates of pay among major job groupings,
Corps-Dredging Industry Partnership Hydrographic Survey Corps-Dredging Industry Partnership Hydrographic Survey US Army Corps of Engineers ® Anthony Niles.
SDRGC 501(c)(4) Questions, Answers, and Issues April 9, 2008.
ANALYSI Web: ANALYSIS LTD Gandijeva 76A Novi Beograd tel/fax:
1 COMBAT VEHICLES SUPPORT INITIATIVE (CVSI) Industry Day Briefing Defense Supply Center Columbus 16 Oct 2007.
Copyright 2010, The World Bank Group. All Rights Reserved. Training and Procedural Manuals Section A 1.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
BVN GM7 – Code of Ethics Head Office – Department Technology Equipment - V1 – April 2009.
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
G17: Recordkeeping for Business Activities Carried out by Contractors Patrick Power, Manager Government Recordkeeping Programme Archives New Zealand.
Sales Management 10 Sales Training. Training as Socialization Training helps _________new employees to the company. Can use it to orient new people to.
Rural, remote and regional CLCs. ASU Workforce Survey respondents in NSW/ACT 153 from rural, remote and regional areas Age and gender demographics.
Projects and procurement (lecture). Procurement Acquiring hardware, software, materials, services, spare parts, skills, workforce etc. which are necessary.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Agricultural Careers Geographic Information Systems Specialist By: Dr. Frank Flanders and Ms. Anna Burgess Georgia Agricultural Education Curriculum Office.
PAST PERFORMANCE Conference Theresa Kinney. 2 2 Agenda  Past Performance Categories  Past Performance Matrix  Rating Measurements  Website  Feedback.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
1 Low Income Energy Efficiency Workforce Education & Training Project Workshop 5: Workforce Education & Training October 31, 2011 San Francisco.
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
Practice Management Quality Control
Sales Management 6 Sales Organization. Purpose of Sales Organization Divide and coordinate activities so that the group can accomplish objectives better.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
GOOD PRACTICES IN TECHNICAL COOPERATION FOR STATISTICS Paris 21 Meeting Paris, France, June 2000.
Segment 6: Provider Communication California ICD-10 Site Visit Training segments to assist the State of California with the ICD-10 Implementation June.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Feb’2003 Region 5 Overview. Feb’2003 IEEE Membership By U.S. Regions 31 December 2002 TOTAL 237,246 65,939 32,260 32,735 36,113 44,170 26,029.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Protecting your Managed Services Practice: Are you at Risk?
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Job Corps – Career Center Collaboration Case Study New York and New Jersey September 19, 2016.
Sales Organization Structure and Sales Force Deployment
National Emergency Communications Plan Goal 2
ORGANIZING THE SALES FORCE
ARRL Field Organization for Emergency Communications
(Additional materials)
Outsourcing “A practice used by different companies to reduce costs by transferring portions of work to outside suppliers rather than completing it internally.”
Chapter 22: Assurance Services: Review and Compilation Engagements
Refuah Community Health Collaborative (RCHC) PPS
Federal Policy & Statewide Assessments for Students with Disabilities
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Existing Franchisor Example
Presentation transcript:

Engineer Research and Development Center, Alexandria, VA Anthony Niles Engineer Research and Development Center, Alexandria, VA

Dredging Industry Hydro Survey Issues May 26, 2005: Dredging contractors meet with HQ to discuss problems with hydro survey practices in the districts; Six contractors and DCA represented, Concerns voiced over non-standard, ambiguous, and incorrect hydro survey practices in support of dredging among Corps offices, with both in-house surveys and contract specifications. Issues paper drafted by industry, April 2006; Ready survey crews EM 1110-2-1003 compliance Timeliness Multibeam use and application Project acceptance Regionalization Use of remote tide gages

Hydro Survey Community of Practice Formed Dec, 2004, with a workshop that included 23 districts; Lead – Ray Williams, NAO Co-Lead – Tim Maynard, NAE HSCP promotes information exchange among practitioners, training and professional development, recognition within PDTs, coordination of services, and sound policies and practices Business conducted mostly through email and online collaboration, with occasional dedicated or collocated meetings; Biennial Geospatial Symposium, Annual NAD Multi-beam Users Group, HYPACK Annual Training Conference, Biennial U.S. Hydrographic Conference. Dialogue with dredging and survey contractors sought

Ready Survey Crews Adequate and properly trained personnel needed for timely, accurate, valid and defensible surveys, Needs: Proper Training – PROSPECT Course, HYPACK Annual Conference, Univ of So Miss, Univ of NH, Univ of NB, equipment vendors, THSoA forums Additional levels of PROSPECT Course; i.e Hydro Survey I, II, III Sufficient number of personnel needed, depending on workload, complexity of systems, and geographic area covered Issue – Contract vs In-house services; in-house capability needed! Local knowledge of waterway conditions; shoaling patterns, hydraulic behavior, etc; needed for responsive and fast surveys, In-house crews can better respond to unpredictable conditions, Third-party payment surveys; “fox guarding the henhouse?” Contract services not always cheaper!

EM 1110-2-1003 Compliance Project managers, contracts, in-house crews must comply; contracts must specify the appropriate sections and details, not just “follow the EM.” Needs: Project Managers and CORs should attend PROSPECT Course, Hydro survey personnel must be included in design and pre-construction meetings, bid selections for survey services, and after-action reviews Issue – Dredging industry wishes to be involved in changes or updates to the EM An EM update workshop with HSCP and industry is being pursued at the HSCP meeting in Nov 06 or the 2007 U.S. Hydro Conference

Timeliness of Surveys Payment and acceptance surveys must be completed promptly to avoid costly waiting periods of dredging equipment and crews. Issues: Corps surveyors believe that, in some cases, the industry is too demanding with timelines; and in other situations, are unable to process data more quickly; more voluminous and complex multi-beam data requires more processing, personnel who process data sometimes not adequately trained, vacancies and inadequate staff significantly increase survey and processing time, multiple layers of review can increase time, some delays unpredictable and unavoidable, such as weather. Possible resolution: Discussions between industry and HSCP on technical and procedural issues.

Multi-Beam Surveys Very sophisticated and complex survey tool producing total bottom coverage; should be used for payment surveys, shoal or strike detection; should not be used on shallow-draft projects. Needs: specialized training for operators; PROSPECT Course not sufficient, consistent application according to type of waterway and survey purpose, should consider use of multi-transducer systems where multi-beam is not appropriate but full coverage is needed.

Regionalization Potential: Advantages; less cost with fewer full-service offices at each district, more consistency in contracting and field procedures. Disadvantages; more layers of review and longer data delivery, less local expert knowledge. “Regionalization” Successes: LRD – Huntington does all surveys for LRH & LRP; river conditions are similar, although arrangement is untested in high demand conditions. NAD – districts sometimes use neighboring district crews during high demand or when neighboring crews can respond more quickly and with less cost. MVD/LRD – Multi-beam vessel and crew perform surveys for multiple districts with costs at or below contract services. Need: Regionalization plans must include participation of practitioners!

Project Acceptance Survey data must be properly interpreted and used, according to accuracy obtained. Project acceptance based on one or two tenths of a foot is unreasonable. Needs: Partners and sponsors must be educated on survey accuracy, Precision must be properly represented on survey plots, Hydro surveyors should be included in design and preconstruction meetings. *** The only way to way to ensure a high degree of certainty of required channel clearance is to target the dredge depth lower ***