ToPOTools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – 1 - 2011.

Slides:



Advertisements
Similar presentations
Mario Bätz CERN ST-MO-TC ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION GTPM Gestion Technique dune Panne Majeure.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.
The Large Hadron Collider By Kathleen McKay. What is the LHC? The most powerful particle accelerator in the world. A synchrotron (ring-shaped particle.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Industrial Control Engineering PXI software support and accelerator integration.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Transverse Impedance Localization in SPS Ring using HEADTAIL macroparticle simulations Candidato: Nicolò Biancacci Relatore: Prof. L.Palumbo Correlatore.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
An Introduction To Particle Accelerators A-Level Physics.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
TS, Length of YETS EYETS LIU & CONS Project
Compact & Low Consumption Magnet Design Workshop for Future Linear and Circular Colliders Geneva, November 26-28, 2014 Saving opportunities in accelerator.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
CNGS PROJECT STATUS D.Autiero 21/5/2003 General status 2003 Project review CNGS upgrade.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
25/01/2001 PS days - Evian Application software Status and trends Marine Pace Marine Pace.
‘Computer power’ budget for the CERN Space Charge Group Alexander Molodozhentsev for the CERN-ICE ‘space-charge’ group meeting March 16, 2012 LIU project.
FESA FRONT-END SOFTWARE ARCHITECTURE [FESA] Michel Arruat, Leandro Fernandez, Stephen Jackson, Frank Locci, Jean-Luc Nougaret, Maciej Peryt, Anastasiya.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
TBTS Test Program & Schedule G. Riddone
1v2 LHC Availability Tracking: Past and Future B. Todd, A. Apollonio, L. Ponce on behalf of the LHC AWG.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
T. Fleck, GSI, Darmstadt, Germany ICALEPCS Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions.
The MA section of AB/CO FirstEvent Welcome ! RADE Information Event Adriaan Rijllart (AB/CO) 2 Outline 10:00 The context 10:15 Introduction to RADE 10:35.
JINR-CERN 5-years Partnership Program N.Russakovich 103-rd session of theJINR Scientific Council meeting JINR, Dubna, 21 February 2008.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Guy Crockford, BE/OP/LHC, CERN WAO 2012 Automation in the SPS and LHC and its effect on operator skills The past 20 years have seen great advances in the.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
ToPO Tools for PS Operation
Performance monitoring framework for the technical infrastructure
Status and Plans for InCA
M.J. Barnes : Canadian Involvement with LHC
nuSTORM and the Physics Beyond Colliders workshop
Development of built-in diagnostics in the RADE framework (EN2746)
CERN The world’s largest Particle Physics Research Center in Geneva
Particle Detection System for MERIT
Candidato: Nicolò Biancacci
Present and Future test facilities for High-intensity Targetry CERN
Particle Detection System for MERIT
Presentation transcript:

ToPOTools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April –

LabView on Beam Operation before RADE (Snapshot close to 2007 for AB-OP) TI (Technical Infrastructure) TI (Technical Infrastructure) CPS (Proton Synchrotron Complex, LINAC, PSB, PS, AD …) CPS (Proton Synchrotron Complex, LINAC, PSB, PS, AD …) LHC (Large Hadron Collider) LHC (Large Hadron Collider) SPS (Super Proton Synchrotron) SPS (Super Proton Synchrotron) Quasi non present Some beam analyzing Beam analyzing, Visualizations, steering Beam analyzing, Visualizations, steering SPS beam tools & Post Mortem SPS beam tools & Post Mortem Specialists, Experts & Experimental Areas Many dedicated LabView applications Specialists, Experts & Experimental Areas Many dedicated LabView applications Tools for PS Operation TI (Technical Infrastructure) TI (Technical Infrastructure) LHC (Large Hadron Collider) LHC (Large Hadron Collider) SPS (Super Proton Synchrotron) SPS (Super Proton Synchrotron) Quasi non present Beam analyzing, Visualizations, steering Beam analyzing, Visualizations, steering SPS beam tools & Post Mortem SPS beam tools & Post Mortem Specialists, Experts & Experimental Areas Many dedicated LabView applications Specialists, Experts & Experimental Areas Many dedicated LabView applications Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Labview in BE/OP group, From 1st RADE Workshop

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Spectrum toolkits

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Spectrum toolkits

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Spectrum toolkits Courtesy of C.Charrondiere

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Samplers Tools : What is a Sampler ?

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Samplers Tools : Sampbox

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Samplers Tools : Sampler FFT

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Samplers Tools : XSS - Xeneric Sampler Survey

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Prototype application : DODO

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Prototype application : Bump16 Control

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Prototype application : Bump16 Control MAD-X calculation Bump simulation Send correction

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Prototype application : Dumper Control Remote

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Prototype application : Dumper Control Remote

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – «Generic» application : Post Mortem Analysis

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – Sources and Thanks to : EN/ICE-MTA BE/OP-PS National Instruments – Labview

Tools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April – QUESTIONS - REMARKS

Rade Workshop EN/ICE-MTA Genoud Hervé BE/OP CERN May – Rade On Beam Operation Applications’ base line for Beam Operation : Safety acces on equipements Status, Settings Quick reaction Easly implemented and maintain Can be deployed on other accelerators Be « Pulse to Pulse Monitoring » (PPM)